E Corp
UEI CWVJEB454CR7 · UT · SAM.gov record ↗
Obligations by agency
- Department Of Transportation$24.8M
- Department Of The Interior$12.1M
- Department Of Defense$0
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
CONTRACT W 912PL-24-C-0020 FOR FY24 CRH SIMULATOR. REFERENCE R00001/AD001 DESIGN CHANGES. THE CONTRACT AMOUNT IS UNCHANGED. THE CONTRACT COMPLETION DATE IS EXTENDED 197 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
- Ends
- Nov 12, 2026
- Started
- Oct 23, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
- 697DCK25F00051 ↗$4.5M
AHU & CRAC UNIT REPLACEMENT PROJECT AT FAA'S OAKLAND AIR ROUTE TRAFFIC CONTROL FACILITY IN FREMONT, CA
- Ends
- Nov 22, 2026
- Started
- Nov 19, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00016 ↗$304K
AHU-700 COOLING COOL CHANGE IN SCOPE
- Ends
- Jan 29, 2027
- Started
- Jan 8, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F01123 ↗$631K
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
- Ends
- Sep 29, 2027
- Started
- Sep 17, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 140P1426C0005 ↗$8.3M
GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711
- Ends
- Nov 14, 2027
- Started
- Jun 25, 2026
- Agency
- National Park Service
- NAICS
- 237310
- 6973GH26C00043 ↗$5.2M
TPS-027 REPLACE SWITCHGEAR MCC
- Ends
- Feb 29, 2028
- Started
- Feb 11, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W912PL24C0020 ↗ | CONTRACT W 912PL-24-C-0020 FOR FY24 CRH SIMULATOR. REFERENCE R00001/AD001 DESIGN CHANGES. THE CONTRACT AMOUNT IS UNCHANGED. THE CONTRACT COMPLETION DATE IS EXTENDED 197 CALENDAR DAYS BY REASON OF THIS MODIFICATION. | Department Of The Army | 236220 | $0 | Oct 23, 2024 | Nov 12, 2026 |
| 697DCK25F00051 ↗ | AHU & CRAC UNIT REPLACEMENT PROJECT AT FAA'S OAKLAND AIR ROUTE TRAFFIC CONTROL FACILITY IN FREMONT, CA | Federal Aviation Administration | 236220 | $4.5M | Nov 19, 2024 | Nov 22, 2026 |
| 697DCK24F00016 ↗ | AHU-700 COOLING COOL CHANGE IN SCOPE | Federal Aviation Administration | 236220 | $304K | Jan 8, 2024 | Jan 29, 2027 |
| 697DCK24F01123 ↗ | DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING. | Federal Aviation Administration | 236220 | $631K | Sep 17, 2024 | Sep 29, 2027 |
| 140P1426C0005 ↗ | GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711 | National Park Service | 237310 | $8.3M | Jun 25, 2026 | Nov 14, 2027 |
| 6973GH26C00043 ↗ | TPS-027 REPLACE SWITCHGEAR MCC | Federal Aviation Administration | 238210 | $5.2M | Feb 11, 2026 | Feb 29, 2028 |
Largest awards
- 140P1426C0005 ↗$8.3M
GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711
- Ends
- Nov 14, 2027
- Started
- Jun 25, 2026
- Agency
- National Park Service
- NAICS
- 237310
- 6973GH26C00043 ↗$5.2M
TPS-027 REPLACE SWITCHGEAR MCC
- Ends
- Feb 29, 2028
- Started
- Feb 11, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 697DCK25F00685 ↗$4.8M
SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED SURFACE PARKING LOTS AND REPAIR CONCRETE AND GRASS AREAS. THE PROJEC
- Ends
- Jan 7, 2033
- Started
- Aug 26, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK25F00051 ↗$4.5M
AHU & CRAC UNIT REPLACEMENT PROJECT AT FAA'S OAKLAND AIR ROUTE TRAFFIC CONTROL FACILITY IN FREMONT, CA
- Ends
- Nov 22, 2026
- Started
- Nov 19, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK26F00387 ↗$4.2M
CHILLER REPLACEMENT AT DTW ATCT (DETROIT, MI): 1.) REPLACE HVAC COMPONENTS ASSOCIATED WITH THE CHILLER REPLACEMENT, INCLUDING THE FOUNDATIONS, AS SHOWN ON THE DRAWINGS AND OTHER COMPONENTS SHOWN ON THE DRAWINGS. 2.) REPLACE FACILITY BUILDING AUT
- Ends
- Jan 7, 2033
- Started
- Apr 19, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 140P1325C0001 ↗$3.8M
ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL & CAVE EXPERIENCE - THE WORK INCLUDES BUT IS NOT LIMITED TO: CONSTRUCTING .75 MILE IMPROVEMENTS ON EXISTING EL CALDERON TRAIL AND CONSTRUCTION OF A NEW TRAIL TO THE EXISTING VAULT RESTROOM FROM THE PARKING
- Ends
- Sep 17, 2026
- Started
- May 13, 2025
- Agency
- National Park Service
- NAICS
- 236220
- 697DCK26F00195 ↗$3.1M
ESTABLISH CONSTRUCTION CONTRACT FOR THE REPLACEMENT OF THE HVAC SYSTEM AT THE BURLINGTON, VT AIRPORT TRAFFIC CONTROL TOWER IN SOUTH BURLINGTON, VT. REPLACE HVAC SYSTEM AT BTV ATCT AND BASE BUILDING. "IN ACCORDANCE WITH EO 14222 "IMPLEMENTIN
- Ends
- Jan 7, 2033
- Started
- Feb 4, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00705 ↗$728K
AIRPORT TRAFFIC CONTROL TOWER AND CAB MODERNIZATION MINNEAPOLIS-SAINT PAUL INTERNATIONAL AIRPORT (MSP), MINNEAPOLIS, MN BIPARTISAN INFRASTRUCTURE LAW FUNDING
- Ends
- Sep 29, 2026
- Started
- Jul 29, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F01123 ↗$631K
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
- Ends
- Sep 29, 2027
- Started
- Sep 17, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK23F00653 ↗$330K
EXTEND POP
- Ends
- Dec 17, 2025
- Started
- Jul 10, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00016 ↗$304K
AHU-700 COOLING COOL CHANGE IN SCOPE
- Ends
- Jan 29, 2027
- Started
- Jan 8, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK23F01104 ↗$232K
PROVIDE ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION DOCUMENTATION, AND SUPPORT DURING PROCUREMENT AS WELL AS ABATEMENT AND CONSTRUCTION SERVICES NECESSARY TO COMPLETELY RENOVATE ENTIRE MENS AND WOMENS MAIN FACILITY RESTROOMS AT ZOA, OAKLAND, CA. T
- Ends
- Jan 29, 2026
- Started
- Sep 20, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00146 ↗$231K
A CONTRACTOR WILL PROVIDE ALL SERVICES, SUPPLIES, EQUIPMENT, MATERIALS, LABOR, PERMITS, BONDS, AND TRANSPORTATION TO PERFORM THE WORK DETAILED IN THE SCOPE OF WORK AND APPLICABLE DOCUMENTS FOR THE CONSTRUCTION THE DENVER TECHNICAL OPERATIONS CENTER (
- Ends
- Sep 29, 2025
- Started
- Jan 18, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00462 ↗$163K
LCH ATCT ELECTRICAL UPGRADE
- Ends
- Feb 6, 2033
- Started
- Jun 3, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00444 ↗$135K
REMOVE AND REPLACE ALL EXTERIOR CAULKING OF BASE BUILDING & TOWER OF ATCT. REPAIR AND INSTALL METAL FRAMING AND DRYWALL FROM THE FIRST LEVEL TO TENTH LEVEL OF ATCT.
- Ends
- Feb 6, 2033
- Started
- May 6, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00812 ↗$126K
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION, EQUIPMENT AND SUPERVISION TO COMPLETE THE FENS ELECTRICAL SITE PREPARATION TO INCLUDE BUT NOT LIMITED TO, INSTALL A NEW CABLE TRAY SYSTEM AND CONDUITS FOR FENS COMMUNICATION, INSTALL
- Ends
- Mar 23, 2025
- Started
- Aug 18, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24F00519 ↗$83K
CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS.
- Ends
- Apr 9, 2026
- Started
- Jun 6, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK24C00032 ↗$66K
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION AND SUPERVISION TO REFURBISH AIR HANDLING UNITS AND REPLACE HUMIDIFIERS FOR THE DSR AREA AT THE OAKLAND (ZOA) AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) IN FREMONT, CA.
- Ends
- Dec 19, 2024
- Started
- Oct 29, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 697DCK23F00876 ↗$52K
1) REPLACE EXISTING AHU #1 LOCATED/SERVICING THE BASE BUILDING. 2) REPLACE EXISTING AHU # 1 SERVO MOTOR CONTROLLER. 3) INTEGRATE NEW AHU#1 INTO BUILDING AUTOMATION SYSTEM (BAS) AND ASSURE IT IS SMOOTHLY OPERATING, CONTROL, AND MODULATE EXISTING 21 VA
- Ends
- Jul 10, 2025
- Started
- Aug 21, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 236220
- 140P2021C0058 ↗$10K
CEBR 163432 - THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW VISITOR CONTACT STATION AS A CENTRAL POINT OF SERVICES FOR PARK VISITORS.
- Ends
- Jan 6, 2026
- Started
- May 31, 2021
- Agency
- National Park Service
- NAICS
- 236220
THE PURPOSE OF THIS MODIFICATION IS TO ALIGN WITH THE LATEST FEDERAL GUIDANCE BY REMOVING NON-STATUTORY SUSTAINABILITY REQUIREMENTS AND IMPROVING THE REPRESENTATION AND CERTIFICATION CLAUSES WITHIN THE CONTRACT. FOLLOWING THE INSTRUCTIONS OUTLINED IN
- Ends
- —
- Started
- Apr 4, 2024
- Agency
- National Park Service
- NAICS
- 236220
CONTRACT W 912PL-24-C-0020 FOR FY24 CRH SIMULATOR. REFERENCE R00001/AD001 DESIGN CHANGES. THE CONTRACT AMOUNT IS UNCHANGED. THE CONTRACT COMPLETION DATE IS EXTENDED 197 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
- Ends
- Nov 12, 2026
- Started
- Oct 23, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
MAINTENANCE, REPAIR, MINOR CONSTRUCTION/ALTERATION/RENOVATION WORK ON REAL PROPERTY AT HOLLOMAN AFB INCLUDING MATERIALS, LABOR, PLANT, TOOLS, EQUIPMENT, TRANSPORTATION, SUPERVISION, MANAGEMENT, ENGINEERING, DESIGN, AND INCIDENTALS NECESSARY THERETO.
- Ends
- —
- Started
- Apr 29, 2024
- Agency
- Department Of The Air Force
- NAICS
- 236220
BASIC ORDERING AGREEMENT (BOA) FOR CONSTRUCTION SERVICES AT CANNON AFB.
- Ends
- —
- Started
- May 19, 2024
- Agency
- Department Of The Air Force
- NAICS
- 236220
SALT LAKE CITY ATCT HVAC CONTROLS REPLACEMENT
- Ends
- Feb 6, 2033
- Started
- Jun 14, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 236220
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 140P1426C0005 ↗ | GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711 | National Park Service | 237310 | $8.3M | Jun 25, 2026 | Nov 14, 2027 |
| 6973GH26C00043 ↗ | TPS-027 REPLACE SWITCHGEAR MCC | Federal Aviation Administration | 238210 | $5.2M | Feb 11, 2026 | Feb 29, 2028 |
| 697DCK25F00685 ↗ | SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED SURFACE PARKING LOTS AND REPAIR CONCRETE AND GRASS AREAS. THE PROJEC | Federal Aviation Administration | 236220 | $4.8M | Aug 26, 2025 | Jan 7, 2033 |
| 697DCK25F00051 ↗ | AHU & CRAC UNIT REPLACEMENT PROJECT AT FAA'S OAKLAND AIR ROUTE TRAFFIC CONTROL FACILITY IN FREMONT, CA | Federal Aviation Administration | 236220 | $4.5M | Nov 19, 2024 | Nov 22, 2026 |
| 697DCK26F00387 ↗ | CHILLER REPLACEMENT AT DTW ATCT (DETROIT, MI): 1.) REPLACE HVAC COMPONENTS ASSOCIATED WITH THE CHILLER REPLACEMENT, INCLUDING THE FOUNDATIONS, AS SHOWN ON THE DRAWINGS AND OTHER COMPONENTS SHOWN ON THE DRAWINGS. 2.) REPLACE FACILITY BUILDING AUT | Federal Aviation Administration | 236220 | $4.2M | Apr 19, 2026 | Jan 7, 2033 |
| 140P1325C0001 ↗ | ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL & CAVE EXPERIENCE - THE WORK INCLUDES BUT IS NOT LIMITED TO: CONSTRUCTING .75 MILE IMPROVEMENTS ON EXISTING EL CALDERON TRAIL AND CONSTRUCTION OF A NEW TRAIL TO THE EXISTING VAULT RESTROOM FROM THE PARKING | National Park Service | 236220 | $3.8M | May 13, 2025 | Sep 17, 2026 |
| 697DCK26F00195 ↗ | ESTABLISH CONSTRUCTION CONTRACT FOR THE REPLACEMENT OF THE HVAC SYSTEM AT THE BURLINGTON, VT AIRPORT TRAFFIC CONTROL TOWER IN SOUTH BURLINGTON, VT. REPLACE HVAC SYSTEM AT BTV ATCT AND BASE BUILDING. "IN ACCORDANCE WITH EO 14222 "IMPLEMENTIN | Federal Aviation Administration | 236220 | $3.1M | Feb 4, 2026 | Jan 7, 2033 |
| 697DCK24F00705 ↗ | AIRPORT TRAFFIC CONTROL TOWER AND CAB MODERNIZATION MINNEAPOLIS-SAINT PAUL INTERNATIONAL AIRPORT (MSP), MINNEAPOLIS, MN BIPARTISAN INFRASTRUCTURE LAW FUNDING | Federal Aviation Administration | 236220 | $728K | Jul 29, 2024 | Sep 29, 2026 |
| 697DCK24F01123 ↗ | DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING. | Federal Aviation Administration | 236220 | $631K | Sep 17, 2024 | Sep 29, 2027 |
| 697DCK23F00653 ↗ | EXTEND POP | Federal Aviation Administration | 236220 | $330K | Jul 10, 2023 | Dec 17, 2025 |
| 697DCK24F00016 ↗ | AHU-700 COOLING COOL CHANGE IN SCOPE | Federal Aviation Administration | 236220 | $304K | Jan 8, 2024 | Jan 29, 2027 |
| 697DCK23F01104 ↗ | PROVIDE ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION DOCUMENTATION, AND SUPPORT DURING PROCUREMENT AS WELL AS ABATEMENT AND CONSTRUCTION SERVICES NECESSARY TO COMPLETELY RENOVATE ENTIRE MENS AND WOMENS MAIN FACILITY RESTROOMS AT ZOA, OAKLAND, CA. T | Federal Aviation Administration | 236220 | $232K | Sep 20, 2023 | Jan 29, 2026 |
| 697DCK24F00146 ↗ | A CONTRACTOR WILL PROVIDE ALL SERVICES, SUPPLIES, EQUIPMENT, MATERIALS, LABOR, PERMITS, BONDS, AND TRANSPORTATION TO PERFORM THE WORK DETAILED IN THE SCOPE OF WORK AND APPLICABLE DOCUMENTS FOR THE CONSTRUCTION THE DENVER TECHNICAL OPERATIONS CENTER ( | Federal Aviation Administration | 236220 | $231K | Jan 18, 2024 | Sep 29, 2025 |
| 697DCK24F00462 ↗ | LCH ATCT ELECTRICAL UPGRADE | Federal Aviation Administration | 236220 | $163K | Jun 3, 2024 | Feb 6, 2033 |
| 697DCK24F00444 ↗ | REMOVE AND REPLACE ALL EXTERIOR CAULKING OF BASE BUILDING & TOWER OF ATCT. REPAIR AND INSTALL METAL FRAMING AND DRYWALL FROM THE FIRST LEVEL TO TENTH LEVEL OF ATCT. | Federal Aviation Administration | 236220 | $135K | May 6, 2024 | Feb 6, 2033 |
| 697DCK24F00812 ↗ | CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION, EQUIPMENT AND SUPERVISION TO COMPLETE THE FENS ELECTRICAL SITE PREPARATION TO INCLUDE BUT NOT LIMITED TO, INSTALL A NEW CABLE TRAY SYSTEM AND CONDUITS FOR FENS COMMUNICATION, INSTALL | Federal Aviation Administration | 236220 | $126K | Aug 18, 2024 | Mar 23, 2025 |
| 697DCK24F00519 ↗ | CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS. | Federal Aviation Administration | 236220 | $83K | Jun 6, 2024 | Apr 9, 2026 |
| 697DCK24C00032 ↗ | CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION AND SUPERVISION TO REFURBISH AIR HANDLING UNITS AND REPLACE HUMIDIFIERS FOR THE DSR AREA AT THE OAKLAND (ZOA) AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) IN FREMONT, CA. | Federal Aviation Administration | 236220 | $66K | Oct 29, 2023 | Dec 19, 2024 |
| 697DCK23F00876 ↗ | 1) REPLACE EXISTING AHU #1 LOCATED/SERVICING THE BASE BUILDING. 2) REPLACE EXISTING AHU # 1 SERVO MOTOR CONTROLLER. 3) INTEGRATE NEW AHU#1 INTO BUILDING AUTOMATION SYSTEM (BAS) AND ASSURE IT IS SMOOTHLY OPERATING, CONTROL, AND MODULATE EXISTING 21 VA | Federal Aviation Administration | 236220 | $52K | Aug 21, 2023 | Jul 10, 2025 |
| 140P2021C0058 ↗ | CEBR 163432 - THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW VISITOR CONTACT STATION AS A CENTRAL POINT OF SERVICES FOR PARK VISITORS. | National Park Service | 236220 | $10K | May 31, 2021 | Jan 6, 2026 |
| 140P1424D0005 ↗ | THE PURPOSE OF THIS MODIFICATION IS TO ALIGN WITH THE LATEST FEDERAL GUIDANCE BY REMOVING NON-STATUTORY SUSTAINABILITY REQUIREMENTS AND IMPROVING THE REPRESENTATION AND CERTIFICATION CLAUSES WITHIN THE CONTRACT. FOLLOWING THE INSTRUCTIONS OUTLINED IN | National Park Service | 236220 | $0 | Apr 4, 2024 | — |
| W912PL24C0020 ↗ | CONTRACT W 912PL-24-C-0020 FOR FY24 CRH SIMULATOR. REFERENCE R00001/AD001 DESIGN CHANGES. THE CONTRACT AMOUNT IS UNCHANGED. THE CONTRACT COMPLETION DATE IS EXTENDED 197 CALENDAR DAYS BY REASON OF THIS MODIFICATION. | Department Of The Army | 236220 | $0 | Oct 23, 2024 | Nov 12, 2026 |
| FA480124D0007 ↗ | MAINTENANCE, REPAIR, MINOR CONSTRUCTION/ALTERATION/RENOVATION WORK ON REAL PROPERTY AT HOLLOMAN AFB INCLUDING MATERIALS, LABOR, PLANT, TOOLS, EQUIPMENT, TRANSPORTATION, SUPERVISION, MANAGEMENT, ENGINEERING, DESIGN, AND INCIDENTALS NECESSARY THERETO. | Department Of The Air Force | 236220 | $0 | Apr 29, 2024 | — |
| FA485524G0007 ↗ | BASIC ORDERING AGREEMENT (BOA) FOR CONSTRUCTION SERVICES AT CANNON AFB. | Department Of The Air Force | 236220 | $0 | May 19, 2024 | — |
| 697DCK23F00521 ↗ | SALT LAKE CITY ATCT HVAC CONTROLS REPLACEMENT | Federal Aviation Administration | 236220 | $0 | Jun 14, 2023 | Feb 6, 2033 |