T & T Construction Enterprises, LLC
UEI DMBVYW4WNZ21 · KY · SAM.gov record ↗
$8.6M
FY2025 obligations
32
Contract awards
Mar 28, 2021
First action
Apr 1, 2026
Latest action
Obligations by agency
- Department Of Defense$8.6M
- Department Of Agriculture$-15K
Obligations by NAICS
Monthly obligations
Oct 24
Nov 24
Dec 24
Feb 25
Apr 25
Jun 25
Jul 25
Aug 25
Sep 25
Oct 25
Nov 25
Dec 25
Jan 26
Feb 26
Mar 26
Apr 26
Contracts ending within 18 months (recompete watch)
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W912QR26PA013 ↗ | DOG CREEK CAMPGROUND PAVING- BASE-ACCESS ROAD END MILLING, REPAVING AND RESURFACING. WHIT THE OPTION TO PAVE NEW PARKING LOT AT DOG CREEK SHOWER HOUSE AND TAILWATER ROAD REPAIR | Department Of The Army | 237310 | $101K | Mar 15, 2026 | Jul 28, 2026 |
| W912EQ24C0007 ↗ | REFERENCE NO. R00001 CA001 ADDITIONAL SLUICE GATE WEDGESCONTRACT AMOUNT: $2,755,432.74 (INCREASED)CONTRACT COMPLETION DATE: 18 FEBRUARY 2026 (INCREASED) | Department Of The Army | 237990 | $15K | Jul 8, 2024 | Dec 14, 2026 |
Largest awards
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W9124D25FA205 ↗ | MATOC REQUIREMENT - BUILDINGS 1474/ 1475/ 1479 - HVAC RECONFIGURATION | Department Of The Army | 236220 | $2.6M | Aug 26, 2025 | Mar 30, 2026 |
| W9124D25FA184 ↗ | JOC/MATOC ORDER FOR BUILDINGS 1485 AND 1486 FOR REPLACEMENT OF HVAC SYSTEM. | Department Of The Army | 236220 | $2.1M | Aug 27, 2025 | Mar 30, 2026 |
| W9124D25FA207 ↗ | MATOC - BUILDING 484 - ROOF REPAIRS | Department Of The Army | 236220 | $769K | Sep 2, 2025 | Apr 25, 2026 |
| W912QR23F0430 ↗ | 0004-1 SPEC DISCREPANCY FOR WATER DEPTH | Department Of The Army | 236220 | $684K | Sep 25, 2023 | Sep 24, 2025 |
| W9124D25FA185 ↗ | JOC/MATOC ORDER FOR ANNUAL ROAD AND PARKING LOT STRIPING. | Department Of The Army | 236220 | $428K | Aug 31, 2025 | Jan 29, 2026 |
| W9124D25FA189 ↗ | REPLACE FIRE ALARM SYSTEM | Department Of The Army | 236220 | $415K | Sep 2, 2025 | Apr 20, 2026 |
| W9124825FA036 ↗ | THE EXISTING CONDITION OF THE 2BCT OBSTACLES, NEED REPAIRS AND OR REBUILDING DUE TO DETERIORATION OF MATERIALS AND SAFETY REQUIREMENTS. OBSTACLES TO BE DEMOED AND RECONSTRUCTED ARE THE CONFIDENCE CLIMB, THE LOW BELLY OVER, AND THE INCLINE WALL. | Department Of The Army | 236220 | $249K | Feb 26, 2025 | May 27, 2025 |
| FA465425C0010 ↗ | THE PROJECT REQUIRES REPAIR OF AIRFIELD PAVEMENTS AT GRISSOM AIR RESERVE BASE, INDIANA. WORK SHALL INCLUDE DEMOLITION OF EXISTING FAILED CONCRETE PAVEMENT SECTIONS, HAULING OF MATERIAL OFF-SITE AND PLACING AND FINISHING NEW CONCRETE PAVEMENT. | Department Of The Air Force | 237310 | $239K | Oct 9, 2025 | May 14, 2026 |
| N0016425FC528 ↗ | PATCHING/PAINTING, INTERIOR DOOR PAINTING, REPLACING RUBBER COVE BASE, REPLACING STAIR TREAD SURFACE, PAINTING STAIRWELL RAILINGS/GUARDRAILS, INSTALLING CORNER WALL PROTECTION, INSTALLING DOOR PROTECTION AND INSTALLING WALL GUARD RAILING. | Department Of The Navy | 236220 | $236K | Jul 15, 2025 | Sep 25, 2025 |
| W912QR25FA082 ↗ | WEST FORK LAKE OUTLET WORKS RIGHT TRAINING WALL GUTTER REPAIR | Department Of The Army | 236220 | $226K | Jun 26, 2025 | Nov 21, 2025 |
| W912QR23C0022 ↗ | CHANGE REQUEST 00072, SEWER FOOTING INTERF. PART 2 FINAL | Department Of The Army | 236220 | $192K | Sep 21, 2023 | Sep 14, 2025 |
| W9124825FA124 ↗ | THIS PROJECT IS TO COMPLETE BEHAVIORAL HEALTH CLINIC MODIFICATIONS AT BLDG. 6102. | Department Of The Army | 236220 | $167K | Jul 27, 2025 | Feb 22, 2026 |
| W9124D25FA187 ↗ | REPLACE GAS CANOPY AT BUILDING 4991 | Department Of The Army | 236220 | $149K | Aug 20, 2025 | Nov 22, 2025 |
| W912QR26PA013 ↗ | DOG CREEK CAMPGROUND PAVING- BASE-ACCESS ROAD END MILLING, REPAVING AND RESURFACING. WHIT THE OPTION TO PAVE NEW PARKING LOT AT DOG CREEK SHOWER HOUSE AND TAILWATER ROAD REPAIR | Department Of The Army | 237310 | $101K | Mar 15, 2026 | Jul 28, 2026 |
| W9124D25FA290 ↗ | BUILDING 7110 - SPEARHEAD DIVISION AVENUE ENTRANCE | Department Of The Army | 236220 | $66K | Sep 21, 2025 | Dec 30, 2025 |
| W9124825FA033 ↗ | EXISTING AUTOMATED BULK WATER FILLING SYSTEM HAS BEEN IN MANUAL OPERATION DUE TO MISSING OR DAMAGE PARTS. OPERATING IN MANUAL MODE REQUIRES USER TO INTER THE BACK FLOW PREVENTION HOT BOX TO MANUAL OPEN VALVE TO TURN ON WATER. | Department Of The Army | 236220 | $38K | Feb 19, 2025 | Jun 14, 2025 |
| W912EQ24C0007 ↗ | REFERENCE NO. R00001 CA001 ADDITIONAL SLUICE GATE WEDGESCONTRACT AMOUNT: $2,755,432.74 (INCREASED)CONTRACT COMPLETION DATE: 18 FEBRUARY 2026 (INCREASED) | Department Of The Army | 237990 | $15K | Jul 8, 2024 | Dec 14, 2026 |
| W9124D24F0459 ↗ | NOTICE TO PROCEED - ANNUAL BRIDGE REPAIRS - FT. KNOX | Department Of The Army | 236220 | $9K | Sep 23, 2024 | Apr 29, 2026 |
| W912QR23F0072 ↗ | CR 2-2, ROAD BED MATS PT. 2 | Department Of The Army | 236220 | $3K | Feb 6, 2023 | Aug 29, 2024 |
| N0016425FC019 ↗ | UNSPECIFIED MINOR CONSTRUCTION PROJECTS | Department Of The Navy | 236220 | $500 | Jun 4, 2025 | Jun 18, 2025 |
| W5168W26FA007 ↗ | THE POST-AWARD CONFERENCE INFORMATION WILL BE SENT VIA EMAIL. THIS TASK ORDER MEETS THE MINIMUM GUARANTEE REQUIREMENT. | Department Of The Army | 236220 | $500 | Mar 2, 2026 | Apr 1, 2026 |
| W5168W26DA008 ↗ | THIS CONTRACT IS FOR A BROAD RANGE OF REAL PROPERTY REPAIR AND MINOR CONSTRUCTION AT FORT KNOX, KY. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, SUPERVISION, LABOR, SUPPLIES/MATERIALS AND TOOLS/EQUIPMENT NECESSARY TO PROVIDE CONSTRUCTION SERVICES. | Department Of The Army | 236220 | $0 | Apr 15, 2026 | — |
| W9124D24F0379 ↗ | NOTICE TO PROCEED - HISTORIC WATER TOWERS DEMOLITION | Department Of The Army | 236220 | $0 | Aug 28, 2024 | Jan 30, 2025 |
| W912QR24P0113 ↗ | REMOVE AND REPLACE TRANSITIONAL RAMP-NTP | Department Of The Army | 237310 | $0 | Sep 24, 2024 | May 1, 2025 |
| W912QR24P0095 ↗ | FRENCH DRAIN SYSTEM - POP MOD | Department Of The Army | 237990 | $0 | Sep 5, 2024 | Aug 7, 2025 |