Yeajin E&C Co.,Ltd.
UEI ED8HLJSALKP4 · SAM.gov record ↗
Obligations by agency
- Department Of Defense$16.3M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- W90VN926FA065 ↗$182K
REPAIR MULTIPLE FAILING FIRE HYDRANTS, CAMP CARROLL
- Ends
- Sep 6, 2026
- Started
- Mar 10, 2026
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN926FA082 ↗$128K
FEWR NO. J1-00089-5J, REPLACE CARBON FILTER MEDIA WITH NEW AT B344, WATER TREATMENT PLANT IN CAMP WALKER
- Ends
- Sep 9, 2026
- Started
- Apr 12, 2026
- Agency
- Department Of The Army
- NAICS
- 236220
MODIFICATION TO CHANGE CCD.
- Ends
- Sep 21, 2026
- Started
- Jul 14, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
CCD EXTENSION
- Ends
- Sep 21, 2026
- Started
- Jul 14, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN725FA014 ↗$563K
MLWR25-1012, REPAIR RUNWAY PAVEMENT MARKINGS MICHAEL A. WEATHERFORD, 1ST LT, USAF(782-5688) PARK, KWANG EUN(782-1062)
- Ends
- Sep 29, 2026
- Started
- May 31, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN926FA080 ↗$835K
REPAVE CONCRETE AT BLDG 938, CAMP CARROLL
- Ends
- Oct 2, 2026
- Started
- Apr 5, 2026
- Agency
- Department Of The Army
- NAICS
- 236220
STATEMENT OF WORK PROJECT NOTITLELOCATIONVA-300000286089 REPLACE VARIABLE AIR VOLUME (VAV) SYSTEMBLDG 6005, USAG HUMPHREYS1. DESCRIPTION: THE WORK TO BE PERFORMED FOR COMPLETION OF THIS PROJECT SHALL BE IN GENERAL AS DESCRIBED BELOW AND EXECUT
- Ends
- Oct 15, 2026
- Started
- Aug 4, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
CCD EXTENSION
- Ends
- Nov 19, 2026
- Started
- Aug 4, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN725FA063 ↗$6.0M
MLWR15-1006, RENOVATE DORMITORY, BLDG342, KUNSAN AB
- Ends
- Dec 13, 2026
- Started
- Oct 14, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN926FA086 ↗$331K
OPERATION AND MAINTENANCE, INSPECTION, MANAGEMENT AND REPAIR SERVICE OF WATER TREATMENT PLANT, WASTEWATER TREATMENT PLANT, HEATING VENTILATION AIR CONDITIONING SYSTEMS, FACILITIES AND UTILITIES LINES AT FORWARD OPERATION SITE, CAMP CARROLL
- Ends
- Dec 30, 2026
- Started
- Mar 31, 2026
- Agency
- Department Of The Army
- NAICS
- 561210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W90VN926FA065 ↗ | REPAIR MULTIPLE FAILING FIRE HYDRANTS, CAMP CARROLL | Department Of The Army | 236220 | $182K | Mar 10, 2026 | Sep 6, 2026 |
| W90VN926FA082 ↗ | FEWR NO. J1-00089-5J, REPLACE CARBON FILTER MEDIA WITH NEW AT B344, WATER TREATMENT PLANT IN CAMP WALKER | Department Of The Army | 236220 | $128K | Apr 12, 2026 | Sep 9, 2026 |
| W91QVN24F0371 ↗ | MODIFICATION TO CHANGE CCD. | Department Of The Army | 236220 | $0 | Jul 14, 2024 | Sep 21, 2026 |
| W91QVN24F0378 ↗ | CCD EXTENSION | Department Of The Army | 236220 | $0 | Jul 14, 2024 | Sep 21, 2026 |
| W90VN725FA014 ↗ | MLWR25-1012, REPAIR RUNWAY PAVEMENT MARKINGS MICHAEL A. WEATHERFORD, 1ST LT, USAF(782-5688) PARK, KWANG EUN(782-1062) | Department Of The Army | 236220 | $563K | May 31, 2025 | Sep 29, 2026 |
| W90VN926FA080 ↗ | REPAVE CONCRETE AT BLDG 938, CAMP CARROLL | Department Of The Army | 236220 | $835K | Apr 5, 2026 | Oct 2, 2026 |
| W91QVN24F0496 ↗ | STATEMENT OF WORK PROJECT NOTITLELOCATIONVA-300000286089 REPLACE VARIABLE AIR VOLUME (VAV) SYSTEMBLDG 6005, USAG HUMPHREYS1. DESCRIPTION: THE WORK TO BE PERFORMED FOR COMPLETION OF THIS PROJECT SHALL BE IN GENERAL AS DESCRIBED BELOW AND EXECUT | Department Of The Army | 236220 | $0 | Aug 4, 2024 | Oct 15, 2026 |
| W91QVN24F0363 ↗ | CCD EXTENSION | Department Of The Army | 236220 | $0 | Aug 4, 2024 | Nov 19, 2026 |
| W90VN725FA063 ↗ | MLWR15-1006, RENOVATE DORMITORY, BLDG342, KUNSAN AB | Department Of The Army | 236220 | $6.0M | Oct 14, 2025 | Dec 13, 2026 |
| W90VN926FA086 ↗ | OPERATION AND MAINTENANCE, INSPECTION, MANAGEMENT AND REPAIR SERVICE OF WATER TREATMENT PLANT, WASTEWATER TREATMENT PLANT, HEATING VENTILATION AIR CONDITIONING SYSTEMS, FACILITIES AND UTILITIES LINES AT FORWARD OPERATION SITE, CAMP CARROLL | Department Of The Army | 561210 | $331K | Mar 31, 2026 | Dec 30, 2026 |
Largest awards
- W90VN725FA063 ↗$6.0M
MLWR15-1006, RENOVATE DORMITORY, BLDG342, KUNSAN AB
- Ends
- Dec 13, 2026
- Started
- Oct 14, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN825F0019 ↗$2.2M
MAXIMUM CONTRACT AMOUNT - K WORK
- Ends
- Jun 10, 2026
- Started
- Mar 16, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN926FA080 ↗$835K
REPAVE CONCRETE AT BLDG 938, CAMP CARROLL
- Ends
- Oct 2, 2026
- Started
- Apr 5, 2026
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN725FA069 ↗$659K
FY25 F18PF 374421 CES PLANNING FM 9 MLWR22-1020B, REPAIR AIRFIELD PAVEMENT MARKINGS, KUNSAN AB.
- Ends
- May 18, 2026
- Started
- Oct 19, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN725FA014 ↗$563K
MLWR25-1012, REPAIR RUNWAY PAVEMENT MARKINGS MICHAEL A. WEATHERFORD, 1ST LT, USAF(782-5688) PARK, KWANG EUN(782-1062)
- Ends
- Sep 29, 2026
- Started
- May 31, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN725FA017 ↗$558K
LCS CY25 MLWR24-1009, REPAIR TAXIWAY AND APRON PAVEMENT MARKING, REMOVE AND DISPOSE EXISTING ENTIRE TAXIWAY AND APRON MARKINGS WITH WATERJET BLASTING REMOVAL EQUIPMENT. INSTALL NEW JOINT SEALANT AT THE AC SHOULDER/PCC SLAB INTERFACE ON TAXIWAY/APRON.
- Ends
- Aug 12, 2026
- Started
- May 16, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA106 ↗$462K
(MATOC) REPAIR FAILED OR FAILING B1385, BSF
- Ends
- Dec 14, 2025
- Started
- Jun 11, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925F0001 ↗$367K
REPLACE EXISTING DETERIORATED LIGHT FIXTURES AT VARIOUS FACILITIES AT CFA CHINHAE AND CNFK HQ BUSAN
- Ends
- Oct 30, 2025
- Started
- Oct 21, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN926FA086 ↗$331K
OPERATION AND MAINTENANCE, INSPECTION, MANAGEMENT AND REPAIR SERVICE OF WATER TREATMENT PLANT, WASTEWATER TREATMENT PLANT, HEATING VENTILATION AIR CONDITIONING SYSTEMS, FACILITIES AND UTILITIES LINES AT FORWARD OPERATION SITE, CAMP CARROLL
- Ends
- Dec 30, 2026
- Started
- Mar 31, 2026
- Agency
- Department Of The Army
- NAICS
- 561210
- W90VN925FA047 ↗$279K
REPLACE WATER LINES AND INSTALL DEHUMIDIFIERS AT B142 AND B143, CAMP CARROLL
- Ends
- Dec 17, 2025
- Started
- Apr 21, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA052 ↗$272K
REPAIR FAILING PAVEMENT AND REARRANGE PARKING AREA AROUND B706, CAMP WALKER
- Ends
- Oct 27, 2025
- Started
- Apr 30, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA097 ↗$264K
(MATOC) REMOVE FAILED UNDERGROUND HOT WATER LINE WITH ASBESTOS CONTAINED MATERIAL, CAMP CARROLL
- Ends
- May 30, 2026
- Started
- Jun 4, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA070 ↗$262K
REPAIR FAILING BREAK ROOM AND SHOWER ROOM AT B468, CAMP WALKER (PROJECT NO. J1-00062-4J)
- Ends
- Jan 14, 2026
- Started
- May 15, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA095 ↗$259K
(MATOC) REPLACE LEAKING WATER PIPELINES FOR HVAC SYSTEM, CAMP WALKER
- Ends
- Jan 1, 2026
- Started
- Jun 4, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN924F0119 ↗$255K
PLEASE REFER TO ATTACHMENTS 1 AND 2 FOR THE REVISED STATEMENT OF WORK AND DRAWINGS RELATED TO MODIFICATION P00001.
- Ends
- Aug 20, 2026
- Started
- Jun 30, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
- W91QVN25FA686 ↗$225K
REPLACE SEWAGE LIFT STATION S-1090
- Ends
- Jul 11, 2026
- Started
- Sep 14, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN924F0140 ↗$189K
MODIFICATION P00001
- Ends
- May 24, 2026
- Started
- Jul 30, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN926FA065 ↗$182K
REPAIR MULTIPLE FAILING FIRE HYDRANTS, CAMP CARROLL
- Ends
- Sep 6, 2026
- Started
- Mar 10, 2026
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA107 ↗$181K
REPAIR FAILED OR FAILING ELEVATED WATER TANK AT PIER #8
- Ends
- Dec 12, 2025
- Started
- Jun 15, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN625FA078 ↗$157K
REPAIR FIRE ALARM, DETECTION AND MNS SYSTEM, B995 AT OSAN AB (PROJECT# SMYU25-1011)
- Ends
- Dec 30, 2026
- Started
- Aug 14, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN926FA082 ↗$128K
FEWR NO. J1-00089-5J, REPLACE CARBON FILTER MEDIA WITH NEW AT B344, WATER TREATMENT PLANT IN CAMP WALKER
- Ends
- Sep 9, 2026
- Started
- Apr 12, 2026
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA073 ↗$126K
RENOVATE COMMAND CONFERENCE ROOM, MSC-K HQ BLDG. 388, CAMP CARROLL (PROJECT NO. HA-00001-3J)
- Ends
- Apr 18, 2026
- Started
- May 12, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA169 ↗$112K
OPERATION AND MAINTENANCE SERVICES FOR CAMP CARROLL FOS, USAG DAEGU
- Ends
- Jan 30, 2026
- Started
- Sep 29, 2025
- Agency
- Department Of The Army
- NAICS
- 238220
- W90VN625FA049 ↗$107K
DEMO STORM DAMAGED GOLF EQUIPMENT STORAGE, B1357, B1358 OSAN AIR BASE
- Ends
- Jul 12, 2026
- Started
- Jul 17, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W90VN925FA184 ↗$107K
UNACCOMPANIED HOUSING COMMON AREA AND DAY ROOM RENOVATION DAEGU/GWANGJU AB
- Ends
- Nov 30, 2025
- Started
- Aug 31, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W90VN725FA063 ↗ | MLWR15-1006, RENOVATE DORMITORY, BLDG342, KUNSAN AB | Department Of The Army | 236220 | $6.0M | Oct 14, 2025 | Dec 13, 2026 |
| W90VN825F0019 ↗ | MAXIMUM CONTRACT AMOUNT - K WORK | Department Of The Army | 236220 | $2.2M | Mar 16, 2025 | Jun 10, 2026 |
| W90VN926FA080 ↗ | REPAVE CONCRETE AT BLDG 938, CAMP CARROLL | Department Of The Army | 236220 | $835K | Apr 5, 2026 | Oct 2, 2026 |
| W90VN725FA069 ↗ | FY25 F18PF 374421 CES PLANNING FM 9 MLWR22-1020B, REPAIR AIRFIELD PAVEMENT MARKINGS, KUNSAN AB. | Department Of The Army | 236220 | $659K | Oct 19, 2025 | May 18, 2026 |
| W90VN725FA014 ↗ | MLWR25-1012, REPAIR RUNWAY PAVEMENT MARKINGS MICHAEL A. WEATHERFORD, 1ST LT, USAF(782-5688) PARK, KWANG EUN(782-1062) | Department Of The Army | 236220 | $563K | May 31, 2025 | Sep 29, 2026 |
| W90VN725FA017 ↗ | LCS CY25 MLWR24-1009, REPAIR TAXIWAY AND APRON PAVEMENT MARKING, REMOVE AND DISPOSE EXISTING ENTIRE TAXIWAY AND APRON MARKINGS WITH WATERJET BLASTING REMOVAL EQUIPMENT. INSTALL NEW JOINT SEALANT AT THE AC SHOULDER/PCC SLAB INTERFACE ON TAXIWAY/APRON. | Department Of The Army | 236220 | $558K | May 16, 2025 | Aug 12, 2026 |
| W90VN925FA106 ↗ | (MATOC) REPAIR FAILED OR FAILING B1385, BSF | Department Of The Army | 236220 | $462K | Jun 11, 2025 | Dec 14, 2025 |
| W90VN925F0001 ↗ | REPLACE EXISTING DETERIORATED LIGHT FIXTURES AT VARIOUS FACILITIES AT CFA CHINHAE AND CNFK HQ BUSAN | Department Of The Army | 236220 | $367K | Oct 21, 2024 | Oct 30, 2025 |
| W90VN926FA086 ↗ | OPERATION AND MAINTENANCE, INSPECTION, MANAGEMENT AND REPAIR SERVICE OF WATER TREATMENT PLANT, WASTEWATER TREATMENT PLANT, HEATING VENTILATION AIR CONDITIONING SYSTEMS, FACILITIES AND UTILITIES LINES AT FORWARD OPERATION SITE, CAMP CARROLL | Department Of The Army | 561210 | $331K | Mar 31, 2026 | Dec 30, 2026 |
| W90VN925FA047 ↗ | REPLACE WATER LINES AND INSTALL DEHUMIDIFIERS AT B142 AND B143, CAMP CARROLL | Department Of The Army | 236220 | $279K | Apr 21, 2025 | Dec 17, 2025 |
| W90VN925FA052 ↗ | REPAIR FAILING PAVEMENT AND REARRANGE PARKING AREA AROUND B706, CAMP WALKER | Department Of The Army | 236220 | $272K | Apr 30, 2025 | Oct 27, 2025 |
| W90VN925FA097 ↗ | (MATOC) REMOVE FAILED UNDERGROUND HOT WATER LINE WITH ASBESTOS CONTAINED MATERIAL, CAMP CARROLL | Department Of The Army | 236220 | $264K | Jun 4, 2025 | May 30, 2026 |
| W90VN925FA070 ↗ | REPAIR FAILING BREAK ROOM AND SHOWER ROOM AT B468, CAMP WALKER (PROJECT NO. J1-00062-4J) | Department Of The Army | 236220 | $262K | May 15, 2025 | Jan 14, 2026 |
| W90VN925FA095 ↗ | (MATOC) REPLACE LEAKING WATER PIPELINES FOR HVAC SYSTEM, CAMP WALKER | Department Of The Army | 236220 | $259K | Jun 4, 2025 | Jan 1, 2026 |
| W90VN924F0119 ↗ | PLEASE REFER TO ATTACHMENTS 1 AND 2 FOR THE REVISED STATEMENT OF WORK AND DRAWINGS RELATED TO MODIFICATION P00001. | Department Of The Army | 236220 | $255K | Jun 30, 2024 | Aug 20, 2026 |
| W91QVN25FA686 ↗ | REPLACE SEWAGE LIFT STATION S-1090 | Department Of The Army | 236220 | $225K | Sep 14, 2025 | Jul 11, 2026 |
| W90VN924F0140 ↗ | MODIFICATION P00001 | Department Of The Army | 236220 | $189K | Jul 30, 2024 | May 24, 2026 |
| W90VN926FA065 ↗ | REPAIR MULTIPLE FAILING FIRE HYDRANTS, CAMP CARROLL | Department Of The Army | 236220 | $182K | Mar 10, 2026 | Sep 6, 2026 |
| W90VN925FA107 ↗ | REPAIR FAILED OR FAILING ELEVATED WATER TANK AT PIER #8 | Department Of The Army | 236220 | $181K | Jun 15, 2025 | Dec 12, 2025 |
| W90VN625FA078 ↗ | REPAIR FIRE ALARM, DETECTION AND MNS SYSTEM, B995 AT OSAN AB (PROJECT# SMYU25-1011) | Department Of The Army | 236220 | $157K | Aug 14, 2025 | Dec 30, 2026 |
| W90VN926FA082 ↗ | FEWR NO. J1-00089-5J, REPLACE CARBON FILTER MEDIA WITH NEW AT B344, WATER TREATMENT PLANT IN CAMP WALKER | Department Of The Army | 236220 | $128K | Apr 12, 2026 | Sep 9, 2026 |
| W90VN925FA073 ↗ | RENOVATE COMMAND CONFERENCE ROOM, MSC-K HQ BLDG. 388, CAMP CARROLL (PROJECT NO. HA-00001-3J) | Department Of The Army | 236220 | $126K | May 12, 2025 | Apr 18, 2026 |
| W90VN925FA169 ↗ | OPERATION AND MAINTENANCE SERVICES FOR CAMP CARROLL FOS, USAG DAEGU | Department Of The Army | 238220 | $112K | Sep 29, 2025 | Jan 30, 2026 |
| W90VN625FA049 ↗ | DEMO STORM DAMAGED GOLF EQUIPMENT STORAGE, B1357, B1358 OSAN AIR BASE | Department Of The Army | 236220 | $107K | Jul 17, 2025 | Jul 12, 2026 |
| W90VN925FA184 ↗ | UNACCOMPANIED HOUSING COMMON AREA AND DAY ROOM RENOVATION DAEGU/GWANGJU AB | Department Of The Army | 236220 | $107K | Aug 31, 2025 | Nov 30, 2025 |