K & K Industries INC
UEI FFMXL1D1LLR4 · KS · subsidiary of Kk Industries · SAM.gov record ↗
$11.1M
FY2025 obligations
39
Contract awards
Jun 9, 2021
First action
Mar 31, 2026
Latest action
Obligations by agency
- Department Of Defense$11.1M
Obligations by NAICS
Monthly obligations
Nov 24
Dec 24
Feb 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Oct 25
Nov 25
Dec 25
Jan 26
Feb 26
Mar 26
Apr 26
Contracts ending within 18 months (recompete watch)
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| FA441826F0021 ↗ | THE CONTRACTOR SHALL PROVIDE FLOOR COVERING AND PROTECTIVE COATING MAINTENANCE FOR WEAPONS STATION DORMS AT JOINT BASE CHARLESTON - WEAPONS STATION IN ACCORDANCE WITH STATEMENT OF WORK DATED 14 NOV 25. | Department Of The Air Force | 236210 | $599K | Dec 14, 2025 | Jul 15, 2026 |
| FA441826F0030 ↗ | THE CONTRACTOR SHALL PROVIDE PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, AND SUPERVISION TO ACCOMPLISH REMOVAL AND REPLACEMENT OF THE EXISTING KITCHEN AHU AND REPLACEMENT OF RE-HEAT COILS IN THE EXHAUST SYSTEM MAKE-UP FANS AT JOINT BASE CHARLESTON, SC. | Department Of The Air Force | 236210 | $148K | Jan 28, 2026 | Jul 27, 2026 |
| FA441826F0048 ↗ | THIS PROJECT WILL REFRESH THE DESIGNATED AREAS BY REMOVING THE CURRENT FLOOR COVERING AND INSTALLING NEW FLOORING WITH A MOISTURE BARRIER AND A COVE BASE. THE PAINTING SCOPE INCLUDES PREPPING SURFACES AND APPLYING PAINT TO THE WALLS AND TRIM. | Department Of The Air Force | 236210 | $134K | Mar 19, 2026 | Sep 15, 2026 |
| FA441825C0003 ↗ | THIS PROJECT INCLUDES THE REPAIR OF A 27K SF AIRCRAFT MAINTENANCE DOCK BUILDING. IT ALSO INCLUDES THE REPLACEMENT OF EXISTING ASPHALT AND CONCRETE PAVEMENTS WITH A NEW CONCRETE PAVEMENT SECTION, NEW PAVEMENT MARKINGS, AND INCIDENTAL WORK. | Department Of The Air Force | 236220 | $6.4M | Aug 31, 2025 | Oct 2, 2026 |
Largest awards
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| FA441825C0003 ↗ | THIS PROJECT INCLUDES THE REPAIR OF A 27K SF AIRCRAFT MAINTENANCE DOCK BUILDING. IT ALSO INCLUDES THE REPLACEMENT OF EXISTING ASPHALT AND CONCRETE PAVEMENTS WITH A NEW CONCRETE PAVEMENT SECTION, NEW PAVEMENT MARKINGS, AND INCIDENTAL WORK. | Department Of The Air Force | 236220 | $6.4M | Aug 31, 2025 | Oct 2, 2026 |
| FA462525F0011 ↗ | BUILDING 14 HEATING VENTILATION AIR CONDITIONING | Department Of The Air Force | 236220 | $1.5M | Nov 11, 2024 | Mar 10, 2026 |
| FA441826F0021 ↗ | THE CONTRACTOR SHALL PROVIDE FLOOR COVERING AND PROTECTIVE COATING MAINTENANCE FOR WEAPONS STATION DORMS AT JOINT BASE CHARLESTON - WEAPONS STATION IN ACCORDANCE WITH STATEMENT OF WORK DATED 14 NOV 25. | Department Of The Air Force | 236210 | $599K | Dec 14, 2025 | Jul 15, 2026 |
| FA441826F0034 ↗ | THE CONTRACTOR SHALL PROVIDE PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, AND SUPERVISION TO PERFORM PROTECTIVE COATING, FLOOR COVERING, AND MISCELLANEOUS REPAIR SERVICES IN SUPPORT OF 628 CES AT JOINT BASE CHARLESTON, SC. | Department Of The Air Force | 236210 | $324K | Feb 25, 2026 | Feb 25, 2026 |
| FA441825F0108 ↗ | THE REPLACEMENT OF EXISTING PARTITIONS, COUNTERTOP, SINKS, AND RESTROOM FIXTURES. | Department Of The Air Force | 236210 | $228K | Oct 19, 2025 | Mar 18, 2026 |
| FA441825F0045 ↗ | THE CONTRACTOR SHALL PROVIDE ALL LABOR, VEHICLES, EQUIPMENT, TOOL, MATERIALS, SUPERVISION TO REMOVE CARPET ONLY IN IDENTIFIED AREAS (INCLUDE FURNITURE RELOCATION), PREP/LEVEL FLOOR, INSTALL CARPET TILE IN AREAS, PREP AND PAINT INTERIOR. | Department Of The Air Force | 236210 | $214K | Apr 6, 2025 | Oct 5, 2025 |
| FA441824F0112 ↗ | TASK ORDER FOR GALLEY KITCHEN REPLACEMENT AT B2402 JOINT BASE CHARLESTON - WEAPONS STATION, GOOSE CREEK, SC. | Department Of The Air Force | 236210 | $148K | Aug 13, 2024 | Oct 16, 2025 |
| FA441826F0030 ↗ | THE CONTRACTOR SHALL PROVIDE PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, AND SUPERVISION TO ACCOMPLISH REMOVAL AND REPLACEMENT OF THE EXISTING KITCHEN AHU AND REPLACEMENT OF RE-HEAT COILS IN THE EXHAUST SYSTEM MAKE-UP FANS AT JOINT BASE CHARLESTON, SC. | Department Of The Air Force | 236210 | $148K | Jan 28, 2026 | Jul 27, 2026 |
| FA441825F0053 ↗ | INSTALL HIGH WEAR ARMOR TOP EPOXY FLOOR SYSTEM WITH QUARTZ BROADCAST IN NPTU FACILITY ROOMS, POWER WASH/PREP/PRIME AND PAINT IDENTIFIED VENTS, AND INSTALLATION OF A NEW 50A, 120V/240V SERVICE AND EXTERIOR OUTLET INTO EXISTING 3 PHASE 277V/480V PANEL. | Department Of The Air Force | 236210 | $140K | May 11, 2025 | Jan 27, 2026 |
| FA441826F0039 ↗ | NNPTC B206 CRAC REPLACEMENT (FEM) | Department Of The Air Force | 236210 | $140K | Mar 4, 2026 | Jul 2, 2026 |
| FA441826F0048 ↗ | THIS PROJECT WILL REFRESH THE DESIGNATED AREAS BY REMOVING THE CURRENT FLOOR COVERING AND INSTALLING NEW FLOORING WITH A MOISTURE BARRIER AND A COVE BASE. THE PAINTING SCOPE INCLUDES PREPPING SURFACES AND APPLYING PAINT TO THE WALLS AND TRIM. | Department Of The Air Force | 236210 | $134K | Mar 19, 2026 | Sep 15, 2026 |
| FA441826F0044 ↗ | THE SCOPE OF WORK INCLUDES THE PROVISION OF ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, TRANSPORTATION, STORAGE, AND DISPOSAL NECESSARY FOR THE REPLACEMENT OF THE HVAC CONTROLS. | Department Of The Air Force | 236210 | $121K | Mar 10, 2026 | Jun 8, 2026 |
| FA441825F0091 ↗ | REMOVAL/INSTALLATION OF FLOOR COVERING, PATCH AND PAINT WALLS, DOORS, AND TRIM, AND POWER WASH COVERED ENTRY AREA. | Department Of The Air Force | 236210 | $114K | Sep 14, 2025 | Apr 29, 2026 |
| FA441825F0030 ↗ | AB B705 FLOOR AND PAINT | Department Of The Air Force | 236210 | $107K | Jan 12, 2025 | Jul 11, 2025 |
| FA441825F0098 ↗ | AB B112 FLOORING | Department Of The Air Force | 236210 | $100K | Sep 3, 2025 | Jan 1, 2026 |
| FA441825F0096 ↗ | THE CONTRACTOR WILL PROVIDE MANAGEMENT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, SUPERVISION FOR INTERIOR PAINTING AND FLOORING REPLACEMENT. | Department Of The Air Force | 236210 | $83K | Sep 30, 2025 | Dec 29, 2025 |
| FA441826F0037 ↗ | THE WORK TO BE PERFORMED IS TO CLEAN WHOLE SYSTEM DUCT WORK, REMOVE WALLPAPER, REPAIR WALLS AND APPLY PROTECTIVE COATING. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND TRANSPORTATION TO PERFORM WORK. | Department Of The Air Force | 236210 | $73K | Mar 3, 2026 | Jun 1, 2026 |
| FA441826F0054 ↗ | THIS PROJECT WILL INVOLVE POWER WASHING, SURFACE PREPARATION, PAINTING, PROCUREMENT AND INSTALLATION OF SIX EXTERIOR BUILDING IDENTIFICATION SIGNS AND ONE INTERIOR DIRECTIONAL SIGN. | Department Of The Air Force | 236210 | $63K | Mar 24, 2026 | Apr 23, 2026 |
| FA441826F0057 ↗ | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPERVISION, AND TRANSPORTATION NECESSARY TO PERFORM THIS WORK AS STATED IN THE SOW, REVISION 2, DATED 10 MARCH 2026. | Department Of The Air Force | 236210 | $61K | Mar 31, 2026 | May 31, 2026 |
| FA441825F0059 ↗ | THIS REQUIREMENT IS FOR AFSBN WS B318 SECOND FLOOR PAINT AND FLOORING. CONTRACTOR WILL PROVIDE WORK ACCORDING TO SOW. | Department Of The Air Force | 236210 | $55K | Jun 22, 2025 | Aug 21, 2025 |
| FA441826F0032 ↗ | THE CONTRACTOR SHALL PROVIDE ALL TOOLS, LABOR, MATERIALS, AND SUPERVISION NECESSARY TO REMOVE/INSTALL EXISTING ITEMS FOR TWO LIVING QUARTERS AND TWO RESTROOMS. INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS INSTALLATION REQUIREMENTS. | Department Of The Air Force | 236210 | $52K | Feb 16, 2026 | May 17, 2026 |
| FA441825F0036 ↗ | THIS REQUIREMENT IS FOR INSTALLATION OF A DIGITAL ANALYZER MONITORING SYSTEM AT JOINT BASE CHARLESTON WASTEWATER TREATMENT PLANT. THE CONTRACTOR SHALL PROVIDE PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, AND SUPERVISION TO ACCOMPLISH THE REQUIRED WORK . | Department Of The Air Force | 236210 | $50K | Feb 19, 2025 | Apr 24, 2025 |
| FA441826F0051 ↗ | AB B58 EXHAUST FANS | Department Of The Air Force | 236210 | $43K | Mar 23, 2026 | Jun 21, 2026 |
| FA441825F0092 ↗ | THIS REQUIREMENT IS FOR AFSBN WS B318 PAINT AND FLOORING. CONTRACTOR WILL PROVIDE WORK ACCORDING TO SOW. | Department Of The Air Force | 236210 | $39K | Sep 1, 2025 | Nov 3, 2025 |
| FA441825F0040 ↗ | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, LABOR, TOOLS, MATERIALS, AND EQUIPMENT NECESSARY TO PROVIDE FLOORING IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK DATED 7 FEBRUARY 2025 FOR THE INSTALLATION OF TURF CARPETING AND LVT, JBC SC (AB B221). | Department Of The Air Force | 236210 | $31K | Mar 11, 2025 | May 10, 2025 |