Wells Global, LLC
UEI GAWHH13W8WR9 · NC · SAM.gov record ↗
Obligations by agency
- Department Of Transportation$52.9M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- 6973GH19F01291 ↗$576K
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
- Ends
- Sep 9, 2026
- Started
- Jun 26, 2019
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH20F01552 ↗$1.0M
DALLAS TRACON REPLACE OBSOLETE STATIC SWITCHES AND THE TEST UPS AND BATTERIES
- Ends
- Sep 18, 2026
- Started
- Aug 20, 2020
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F00762 ↗$96K
INSTALL ACEPS TYPE II PHASE 1 SYSTEM AT THE ALBUQUERQUE ARTCC (ZAB)
- Ends
- Sep 29, 2026
- Started
- Mar 29, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH20F00619 ↗$7.7M
ENGINEERING AND INSTALLATION SERVICES FOR THE CLEVELAND ARTCC ACEPS II PHASE I
- Ends
- Sep 29, 2026
- Started
- Feb 23, 2020
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH24F00636 ↗$332K
ACEPS II PHASE II - STORAGE AND MAINTENANCE WAREHOUSE. TEMP STORAGE OPTION REV. 1, PER WELLS GLOBAL PROPOSAL# 046-2024.
- Ends
- Sep 29, 2026
- Started
- Apr 11, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01782 ↗$149K
ZLC ACEPS II PHASE 2 SITE SPECIFIC DESIGN - CHANGE ORDER TO UPDATE THE EG SIZING FROM KD1250 TO KD1500
- Ends
- Sep 29, 2026
- Started
- Sep 14, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH19F00563 ↗$1.2M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
- Ends
- Sep 29, 2026
- Started
- Feb 25, 2019
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH24F01487 ↗$-27K
IIJA FUNDS, WELLS GLOBAL IS TO CONDUCT ASBESTOS-CONTAINING MATERIAL (ACM) TESTING IN AREAS THAT WILL BE AFFECTED BY THE DEMOLITION OF THE EG AND FST AT THE JACKSON, TN (MKLA) RCAG. SPECIFICALLY, THE TESTING WILL FOCUS ON THE CAULKING AROUND WALL PENE
- Ends
- Sep 29, 2026
- Started
- Sep 11, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00984 ↗$128K
(ZKC) KANSAS CITY ARTCC - ACEPS II PHASE 2 - F11 FUNDING FOR TEMP POWER DESIGN. PER WELLS GLOBAL PROPOSAL #065-2025, DATED 5/1/2025.
- Ends
- Sep 29, 2026
- Started
- Jun 10, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH18F00730 ↗$1.1M
ACEPS TYPE II PHASE 2 INSTALLATION
- Ends
- Sep 29, 2026
- Started
- Feb 14, 2018
- Agency
- Federal Aviation Administration
- NAICS
- 238210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 6973GH19F01291 ↗ | INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I | Federal Aviation Administration | 238210 | $576K | Jun 26, 2019 | Sep 9, 2026 |
| 6973GH20F01552 ↗ | DALLAS TRACON REPLACE OBSOLETE STATIC SWITCHES AND THE TEST UPS AND BATTERIES | Federal Aviation Administration | 238210 | $1.0M | Aug 20, 2020 | Sep 18, 2026 |
| 6973GH22F00762 ↗ | INSTALL ACEPS TYPE II PHASE 1 SYSTEM AT THE ALBUQUERQUE ARTCC (ZAB) | Federal Aviation Administration | 238210 | $96K | Mar 29, 2022 | Sep 29, 2026 |
| 6973GH20F00619 ↗ | ENGINEERING AND INSTALLATION SERVICES FOR THE CLEVELAND ARTCC ACEPS II PHASE I | Federal Aviation Administration | 238210 | $7.7M | Feb 23, 2020 | Sep 29, 2026 |
| 6973GH24F00636 ↗ | ACEPS II PHASE II - STORAGE AND MAINTENANCE WAREHOUSE. TEMP STORAGE OPTION REV. 1, PER WELLS GLOBAL PROPOSAL# 046-2024. | Federal Aviation Administration | 238210 | $332K | Apr 11, 2024 | Sep 29, 2026 |
| 6973GH22F01782 ↗ | ZLC ACEPS II PHASE 2 SITE SPECIFIC DESIGN - CHANGE ORDER TO UPDATE THE EG SIZING FROM KD1250 TO KD1500 | Federal Aviation Administration | 238210 | $149K | Sep 14, 2022 | Sep 29, 2026 |
| 6973GH19F00563 ↗ | ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC | Federal Aviation Administration | 238210 | $1.2M | Feb 25, 2019 | Sep 29, 2026 |
| 6973GH24F01487 ↗ | IIJA FUNDS, WELLS GLOBAL IS TO CONDUCT ASBESTOS-CONTAINING MATERIAL (ACM) TESTING IN AREAS THAT WILL BE AFFECTED BY THE DEMOLITION OF THE EG AND FST AT THE JACKSON, TN (MKLA) RCAG. SPECIFICALLY, THE TESTING WILL FOCUS ON THE CAULKING AROUND WALL PENE | Federal Aviation Administration | 238210 | $-27K | Sep 11, 2024 | Sep 29, 2026 |
| 6973GH25F00984 ↗ | (ZKC) KANSAS CITY ARTCC - ACEPS II PHASE 2 - F11 FUNDING FOR TEMP POWER DESIGN. PER WELLS GLOBAL PROPOSAL #065-2025, DATED 5/1/2025. | Federal Aviation Administration | 238210 | $128K | Jun 10, 2025 | Sep 29, 2026 |
| 6973GH18F00730 ↗ | ACEPS TYPE II PHASE 2 INSTALLATION | Federal Aviation Administration | 238210 | $1.1M | Feb 14, 2018 | Sep 29, 2026 |
Largest awards
- 6973GH20F01180 ↗$8.1M
ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN
- Ends
- Feb 17, 2027
- Started
- Jun 17, 2020
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH20F00619 ↗$7.7M
ENGINEERING AND INSTALLATION SERVICES FOR THE CLEVELAND ARTCC ACEPS II PHASE I
- Ends
- Sep 29, 2026
- Started
- Feb 23, 2020
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00480 ↗$5.1M
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC
- Ends
- Dec 30, 2026
- Started
- Feb 9, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00812 ↗$3.9M
ACEPS II PHASE II - FABRICATION AND TESTING OF MOBILE STANDBY SWITCHGEAR TRAILER, PER VENDOR QUOTE #016-2025 DATED 2/7/25.
- Ends
- Sep 29, 2025
- Started
- May 18, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00715 ↗$2.4M
IIJA FUNDED POWER CABLE REPLACEMENT AND INSTALLATION, SITE SPECIFIC: (STT) ELD, ST. THOMAS, VI, JCN: 19007437, PER ELD.
- Ends
- Sep 29, 2026
- Started
- Apr 21, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00897 ↗$1.9M
WELLS GLOBAL WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 2 PERMANENT POWER SYSTEMS INSTALLATION DESIGN SCOPE OF WORK AT THE ATLANT
- Ends
- Jan 24, 2027
- Started
- May 26, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00467 ↗$1.9M
F11 - (F&E) FUNDED INSTALLATION/CONSTRUCTION, SITE SPECIFIC: NORFOLK, VA (ORF)ELD, JCN: 1302445, PER ELD, PMO.
- Ends
- Sep 29, 2026
- Started
- Feb 25, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00784 ↗$1.8M
DEVELOP A SITE-SPECIFIC PERMANENT POWER SYSTEMS INSTALLATION DESIGN PACKAGE FOR THE CLEVELAND ARTCC (ZOB), UTILIZING THE FAA ACEPS TYPE II, PHASE 2 NATIONAL STANDARD DESIGN AS A TEMPLATE, IN ACCORDANCE WITH THE SCOPE OF WORK TITLED "ACEPS II PH
- Ends
- Dec 29, 2026
- Started
- May 6, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F00602 ↗$1.4M
EG REPLACEMENT AND CPDS INSTALLATION AT ATLN NEMC. JCN 1700177.
- Ends
- Jul 9, 2026
- Started
- Feb 9, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00487 ↗$1.3M
CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) INSTALLATION AT SAN JAUN, PR (ZSU) CERAP ARTCC
- Ends
- Feb 25, 2027
- Started
- Feb 25, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH19F00563 ↗$1.2M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
- Ends
- Sep 29, 2026
- Started
- Feb 25, 2019
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01853 ↗$1.2M
INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II JCN# 1401417
- Ends
- Dec 29, 2026
- Started
- Sep 14, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01934 ↗$1.2M
F35 BIL FUNDING FOR INSTALLATION AT ANDREWS AFB ADW CPDS JCN 1700009
- Ends
- Mar 29, 2026
- Started
- Sep 24, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00612 ↗$1.2M
TO FUND THE INSTALLATION OF SUPER CAPACITOR INSTALLATION
- Ends
- Jan 15, 2027
- Started
- Mar 26, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F01402 ↗$1.2M
(IIJA) FUNDED SITE SURVEY AND TRAVEL, SITE SPECIFIC: MULTIPLE SITES AND JCNS, PER LPGBS PMO. MADISON, WI (MSN)ASR9 JCN:23000686 MADISON, WI (MSN)ATCT JCN:23008395 MADISON, WI (MSN)GS JCN:23008439 MADISON, WI (DSZ)LOC JCN:23009357 MADISON, WI (MS
- Ends
- Jun 29, 2026
- Started
- Sep 11, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH18F00730 ↗$1.1M
ACEPS TYPE II PHASE 2 INSTALLATION
- Ends
- Sep 29, 2026
- Started
- Feb 14, 2018
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH20F01552 ↗$1.0M
DALLAS TRACON REPLACE OBSOLETE STATIC SWITCHES AND THE TEST UPS AND BATTERIES
- Ends
- Sep 18, 2026
- Started
- Aug 20, 2020
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH24F01016 ↗$989K
BIL FUNDS. SITE SPECIFIC FUNDING FOR INDOOR EG, FST, ERMS AND POWER SYSTEM STUDY FOR WASHINGTON DC (DCAF) ATCT JCN:23007744
- Ends
- Oct 29, 2026
- Started
- Jun 16, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F01203 ↗$807K
F&E FUNDED ENGINE GENERATOR INSTALLATION, SITE SPECIFIC: SOUTH BIMINI (ZBV) VOR, BAHAMAS-BHS, JCN:22005476, PER ELD PMO.
- Ends
- Jan 14, 2026
- Started
- Aug 4, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00051 ↗$725K
MODIFICATION OF PHASE I AND PHASE II TEMP SYSTEM INCORPORATING TPSCMS - TEMPORARY POWER MONITORING AND CONTROL SYSTEM, PER VENDOR PROPOSAL #101-2024, DTD 9/12/24.
- Ends
- Oct 29, 2026
- Started
- Oct 29, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00822 ↗$598K
MOBILE POWER SYSTEM-TRAILER FABRICATION MPSU-5 FOR CPDS PROGRAM OFFICE
- Ends
- Oct 29, 2025
- Started
- May 5, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH19F01291 ↗$576K
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
- Ends
- Sep 9, 2026
- Started
- Jun 26, 2019
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01392 ↗$518K
IIJA FUNDS. ADD FUNDING FOR THE OUTDOOR EG W/SUB-BASE TANK, ERMS AND ADVANCE METERING INSTALLATION WITH A FULL POWER SYSTEM STUDY AT THE FAR ATCT JCN: 19003424
- Ends
- Oct 30, 2025
- Started
- Jun 11, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F01294 ↗$476K
QEA ARSR ELECTRICAL REFURBISHMENT
- Ends
- May 14, 2026
- Started
- Aug 24, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH24F00636 ↗$332K
ACEPS II PHASE II - STORAGE AND MAINTENANCE WAREHOUSE. TEMP STORAGE OPTION REV. 1, PER WELLS GLOBAL PROPOSAL# 046-2024.
- Ends
- Sep 29, 2026
- Started
- Apr 11, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 6973GH20F01180 ↗ | ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN | Federal Aviation Administration | 238210 | $8.1M | Jun 17, 2020 | Feb 17, 2027 |
| 6973GH20F00619 ↗ | ENGINEERING AND INSTALLATION SERVICES FOR THE CLEVELAND ARTCC ACEPS II PHASE I | Federal Aviation Administration | 238210 | $7.7M | Feb 23, 2020 | Sep 29, 2026 |
| 6973GH25F00480 ↗ | F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC | Federal Aviation Administration | 238210 | $5.1M | Feb 9, 2025 | Dec 30, 2026 |
| 6973GH25F00812 ↗ | ACEPS II PHASE II - FABRICATION AND TESTING OF MOBILE STANDBY SWITCHGEAR TRAILER, PER VENDOR QUOTE #016-2025 DATED 2/7/25. | Federal Aviation Administration | 238210 | $3.9M | May 18, 2025 | Sep 29, 2025 |
| 6973GH26F00715 ↗ | IIJA FUNDED POWER CABLE REPLACEMENT AND INSTALLATION, SITE SPECIFIC: (STT) ELD, ST. THOMAS, VI, JCN: 19007437, PER ELD. | Federal Aviation Administration | 238210 | $2.4M | Apr 21, 2026 | Sep 29, 2026 |
| 6973GH26F00897 ↗ | WELLS GLOBAL WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 2 PERMANENT POWER SYSTEMS INSTALLATION DESIGN SCOPE OF WORK AT THE ATLANT | Federal Aviation Administration | 238210 | $1.9M | May 26, 2026 | Jan 24, 2027 |
| 6973GH26F00467 ↗ | F11 - (F&E) FUNDED INSTALLATION/CONSTRUCTION, SITE SPECIFIC: NORFOLK, VA (ORF)ELD, JCN: 1302445, PER ELD, PMO. | Federal Aviation Administration | 238210 | $1.9M | Feb 25, 2026 | Sep 29, 2026 |
| 6973GH26F00784 ↗ | DEVELOP A SITE-SPECIFIC PERMANENT POWER SYSTEMS INSTALLATION DESIGN PACKAGE FOR THE CLEVELAND ARTCC (ZOB), UTILIZING THE FAA ACEPS TYPE II, PHASE 2 NATIONAL STANDARD DESIGN AS A TEMPLATE, IN ACCORDANCE WITH THE SCOPE OF WORK TITLED "ACEPS II PH | Federal Aviation Administration | 238210 | $1.8M | May 6, 2026 | Dec 29, 2026 |
| 6973GH23F00602 ↗ | EG REPLACEMENT AND CPDS INSTALLATION AT ATLN NEMC. JCN 1700177. | Federal Aviation Administration | 238210 | $1.4M | Feb 9, 2023 | Jul 9, 2026 |
| 6973GH26F00487 ↗ | CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) INSTALLATION AT SAN JAUN, PR (ZSU) CERAP ARTCC | Federal Aviation Administration | 238210 | $1.3M | Feb 25, 2026 | Feb 25, 2027 |
| 6973GH19F00563 ↗ | ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC | Federal Aviation Administration | 238210 | $1.2M | Feb 25, 2019 | Sep 29, 2026 |
| 6973GH23F01853 ↗ | INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II JCN# 1401417 | Federal Aviation Administration | 238210 | $1.2M | Sep 14, 2023 | Dec 29, 2026 |
| 6973GH23F01934 ↗ | F35 BIL FUNDING FOR INSTALLATION AT ANDREWS AFB ADW CPDS JCN 1700009 | Federal Aviation Administration | 238210 | $1.2M | Sep 24, 2023 | Mar 29, 2026 |
| 6973GH26F00612 ↗ | TO FUND THE INSTALLATION OF SUPER CAPACITOR INSTALLATION | Federal Aviation Administration | 238210 | $1.2M | Mar 26, 2026 | Jan 15, 2027 |
| 6973GH25F01402 ↗ | (IIJA) FUNDED SITE SURVEY AND TRAVEL, SITE SPECIFIC: MULTIPLE SITES AND JCNS, PER LPGBS PMO. MADISON, WI (MSN)ASR9 JCN:23000686 MADISON, WI (MSN)ATCT JCN:23008395 MADISON, WI (MSN)GS JCN:23008439 MADISON, WI (DSZ)LOC JCN:23009357 MADISON, WI (MS | Federal Aviation Administration | 238210 | $1.2M | Sep 11, 2025 | Jun 29, 2026 |
| 6973GH18F00730 ↗ | ACEPS TYPE II PHASE 2 INSTALLATION | Federal Aviation Administration | 238210 | $1.1M | Feb 14, 2018 | Sep 29, 2026 |
| 6973GH20F01552 ↗ | DALLAS TRACON REPLACE OBSOLETE STATIC SWITCHES AND THE TEST UPS AND BATTERIES | Federal Aviation Administration | 238210 | $1.0M | Aug 20, 2020 | Sep 18, 2026 |
| 6973GH24F01016 ↗ | BIL FUNDS. SITE SPECIFIC FUNDING FOR INDOOR EG, FST, ERMS AND POWER SYSTEM STUDY FOR WASHINGTON DC (DCAF) ATCT JCN:23007744 | Federal Aviation Administration | 238210 | $989K | Jun 16, 2024 | Oct 29, 2026 |
| 6973GH25F01203 ↗ | F&E FUNDED ENGINE GENERATOR INSTALLATION, SITE SPECIFIC: SOUTH BIMINI (ZBV) VOR, BAHAMAS-BHS, JCN:22005476, PER ELD PMO. | Federal Aviation Administration | 238210 | $807K | Aug 4, 2025 | Jan 14, 2026 |
| 6973GH25F00051 ↗ | MODIFICATION OF PHASE I AND PHASE II TEMP SYSTEM INCORPORATING TPSCMS - TEMPORARY POWER MONITORING AND CONTROL SYSTEM, PER VENDOR PROPOSAL #101-2024, DTD 9/12/24. | Federal Aviation Administration | 238210 | $725K | Oct 29, 2024 | Oct 29, 2026 |
| 6973GH25F00822 ↗ | MOBILE POWER SYSTEM-TRAILER FABRICATION MPSU-5 FOR CPDS PROGRAM OFFICE | Federal Aviation Administration | 238210 | $598K | May 5, 2025 | Oct 29, 2025 |
| 6973GH19F01291 ↗ | INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I | Federal Aviation Administration | 238210 | $576K | Jun 26, 2019 | Sep 9, 2026 |
| 6973GH23F01392 ↗ | IIJA FUNDS. ADD FUNDING FOR THE OUTDOOR EG W/SUB-BASE TANK, ERMS AND ADVANCE METERING INSTALLATION WITH A FULL POWER SYSTEM STUDY AT THE FAR ATCT JCN: 19003424 | Federal Aviation Administration | 238210 | $518K | Jun 11, 2023 | Oct 30, 2025 |
| 6973GH25F01294 ↗ | QEA ARSR ELECTRICAL REFURBISHMENT | Federal Aviation Administration | 238210 | $476K | Aug 24, 2025 | May 14, 2026 |
| 6973GH24F00636 ↗ | ACEPS II PHASE II - STORAGE AND MAINTENANCE WAREHOUSE. TEMP STORAGE OPTION REV. 1, PER WELLS GLOBAL PROPOSAL# 046-2024. | Federal Aviation Administration | 238210 | $332K | Apr 11, 2024 | Sep 29, 2026 |