Cci Facility Support Services LLC
UEI GBVUAKJYV1W7 · AL · SAM.gov record ↗
$8.0M
FY2025 obligations
27
Contract awards
Jul 5, 2021
First action
Feb 10, 2026
Latest action
Obligations by agency
- Department Of Defense$8.0M
Obligations by NAICS
Monthly obligations
Nov 24
Dec 24
Jan 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Dec 25
Jan 26
Feb 26
Contracts ending within 18 months (recompete watch)
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W9124P25FA052 ↗ | PROVIDE QUALITY ASSURANCE EVALUATOR (QAE) TO PROVIDE PERFORMANCE ASSURANCE BY MONITORING METERING DATA FOR ALL BUILDINGS ON SITE AND IMPLEMENTING MODIFICATIONS TO VERIFY IMPROVED BUILDING ENERGY USAGE. | Department Of The Army | 541330 | $126K | Jul 31, 2025 | Jul 30, 2026 |
| W912HQ25F0150 ↗ | HQ - POWER RELIABILITY ENHANCEMENT PROGRAM (PREP) - UNINTERRUPTIBLE POWER SUPPLY (UPS) BATTERY REPLACEMENT | Department Of The Army | 237130 | $351K | Aug 14, 2025 | Aug 13, 2026 |
| W9124P25FA111 ↗ | DESIGN AND TECHNICAL SUPPORT SERVICES FOR THE CONSTRUCTION, RENOVATION, MODERNIZATION AND REPURPOSE OF BUILDINGS AND OR STRUCTURES PER VARIOUS DA 4283`S SUBMITTED BY CUSTOMERS ON REDSTONE ARSENAL. | Department Of The Army | 541330 | $1.8M | Sep 7, 2025 | Sep 6, 2026 |
| W9124P25FA125 ↗ | UTILIZE THE TECHNICAL SUPPORT SERVICES CONTRACT TO PERFORM PHYSICAL INSPECTION OF GFEBS REAL PROPERTY ASSET RECORDS AND SOURCE DOCUMENTATION CONTAINED IN THE ASSET FOLDER OF EACH REAL PROPERTY ASSET. | Department Of The Army | 541330 | $750K | Sep 7, 2025 | Sep 6, 2026 |
| W9124P25FA103 ↗ | THE FBI IS LOOKING ASSIST FROM DPW TO CREATE A FEASIBILITY STUDY AND MODEL TO UNDERSTAND THE REQUIREMENTS FOR USING THE SUBSTATION 24 GEN TO POWER THE FBI AT SUBSTATION 10 AND PROVIDE REDUNDANT POWER TO THE FBI CAMPUS IN THE EVENT OF POWER LOSS . | Department Of The Army | 541330 | $85K | Aug 28, 2025 | Sep 27, 2026 |
| W9124P25FA154 ↗ | DEVELOP A SMALL ADP FOR THE 7120 COMPLEX AND HAVE 2 UMMCA 1391S AT THE CONCLUSION ON THIS PLANNING EFFORT. | Department Of The Army | 541330 | $616K | Sep 29, 2025 | Sep 28, 2026 |
| W9124P25FA159 ↗ | 4005 SMS FULL FACILITY INVENTORY INSPECTION. POPULATE AND MAINTAIN ASSET INVENTORY FOR GAS, WASTEWATER, AND STEAM COMPONENTS ON RSA TO ALIGN WITH DOD REQUIREMENTS FOR THE ENTERPRISE SUSTAINMENT MANAGEMENT SYSTEM (ESMS) - BUILDER. | Department Of The Army | 541330 | $148K | Sep 29, 2025 | Sep 28, 2026 |
| W9124P25FA169 ↗ | DESIGN AND TECHNICAL SUPPORT SERVICES FOR THE CONSTRUCTION, RENOVATION, MODERNIZATION AND REPURPOSE OF BUILDINGS AND OR STRUCTURES PER VARIOUS DA 4283`S SUBMITTED BY CUSTOMERS ON REDSTONE ARSENAL. | Department Of The Army | 541330 | $921K | Sep 29, 2025 | Sep 28, 2026 |
| W9124P25FA170 ↗ | THIS DIGEST CONSOLIDATES EXECUTIVE SUMMARIES AND KEY TAKEAWAYS FROM THE VISION PLAN, INSTALLATION PLANNING STANDARDS, INSTALLATION DEVELOPMENT PLAN, AND CAPITAL INVESTMENT STRATEGY. | Department Of The Army | 541330 | $317K | Sep 29, 2025 | Sep 28, 2026 |
Largest awards
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W9124P25FA111 ↗ | DESIGN AND TECHNICAL SUPPORT SERVICES FOR THE CONSTRUCTION, RENOVATION, MODERNIZATION AND REPURPOSE OF BUILDINGS AND OR STRUCTURES PER VARIOUS DA 4283`S SUBMITTED BY CUSTOMERS ON REDSTONE ARSENAL. | Department Of The Army | 541330 | $1.8M | Sep 7, 2025 | Sep 6, 2026 |
| W9124P25FA169 ↗ | DESIGN AND TECHNICAL SUPPORT SERVICES FOR THE CONSTRUCTION, RENOVATION, MODERNIZATION AND REPURPOSE OF BUILDINGS AND OR STRUCTURES PER VARIOUS DA 4283`S SUBMITTED BY CUSTOMERS ON REDSTONE ARSENAL. | Department Of The Army | 541330 | $921K | Sep 29, 2025 | Sep 28, 2026 |
| W9124P25FA125 ↗ | UTILIZE THE TECHNICAL SUPPORT SERVICES CONTRACT TO PERFORM PHYSICAL INSPECTION OF GFEBS REAL PROPERTY ASSET RECORDS AND SOURCE DOCUMENTATION CONTAINED IN THE ASSET FOLDER OF EACH REAL PROPERTY ASSET. | Department Of The Army | 541330 | $750K | Sep 7, 2025 | Sep 6, 2026 |
| W9124P25FA154 ↗ | DEVELOP A SMALL ADP FOR THE 7120 COMPLEX AND HAVE 2 UMMCA 1391S AT THE CONCLUSION ON THIS PLANNING EFFORT. | Department Of The Army | 541330 | $616K | Sep 29, 2025 | Sep 28, 2026 |
| W912HQ25F0136 ↗ | PREP PROGRAM OFFICE-THIS IS A NON-PERSONNEL SERVICES TASK ORDER TO PROVIDE ENGINEERING SUPPORT TO PERFORM GROUNDING PROTECTION SYSTEM ASSESSMENTS ON FIVE BUILDINGS ON THE SECURITY OPERATIONS TRAINING FACILITY (SOTF) COMPOUND ON FORT BRAGG, NC. | Department Of The Army | 237130 | $453K | Jun 3, 2025 | Jun 2, 2026 |
| W9124P25F0315 ↗ | NEPA TECH SUPPORT | Department Of The Army | 541620 | $450K | Apr 6, 2025 | Apr 5, 2026 |
| W9124P25F0388 ↗ | HAZARDOUS WASTE MANAGEMENT | Department Of The Army | 541620 | $400K | May 8, 2025 | May 7, 2026 |
| W912HQ25F0150 ↗ | HQ - POWER RELIABILITY ENHANCEMENT PROGRAM (PREP) - UNINTERRUPTIBLE POWER SUPPLY (UPS) BATTERY REPLACEMENT | Department Of The Army | 237130 | $351K | Aug 14, 2025 | Aug 13, 2026 |
| W9124P25F0484 ↗ | SCIENTIFIC STUDIES, SURVEYS, AND REPORTS | Department Of The Army | 541620 | $340K | Jun 29, 2025 | Jun 28, 2026 |
| W912HQ25F0075 ↗ | HQ - POWER RELIABILITY ENHANCEMENT PROGRAM (PREP) - BLACK START EXERCISE (BSE) TASK ORDER | Department Of The Army | 237130 | $324K | May 26, 2025 | May 25, 2026 |
| W9124P25FA170 ↗ | THIS DIGEST CONSOLIDATES EXECUTIVE SUMMARIES AND KEY TAKEAWAYS FROM THE VISION PLAN, INSTALLATION PLANNING STANDARDS, INSTALLATION DEVELOPMENT PLAN, AND CAPITAL INVESTMENT STRATEGY. | Department Of The Army | 541330 | $317K | Sep 29, 2025 | Sep 28, 2026 |
| W9124P25F0385 ↗ | ENVIRONMENTAL RESTORATION SUPPORT | Department Of The Army | 541620 | $300K | May 8, 2025 | May 7, 2026 |
| W9124P25FA097 ↗ | PROVIDE A REM TO MONITOR METERING DATA AND RECOMMEND MODIFICATIONS TO IMPROVE BUILDING ENERGY USAGE, AND IDENTIFY BUILDINGS FOR RETRO-COMMISSIONING/ DEVELOPING STRATEGIES TO MAXIMIZE SAVINGS. | Department Of The Army | 541330 | $210K | Sep 14, 2025 | Sep 21, 2025 |
| W9124P25F0134 ↗ | DRAFTING | Department Of The Army | 541330 | $209K | Jan 16, 2025 | Jan 15, 2026 |
| W9124P25FA159 ↗ | 4005 SMS FULL FACILITY INVENTORY INSPECTION. POPULATE AND MAINTAIN ASSET INVENTORY FOR GAS, WASTEWATER, AND STEAM COMPONENTS ON RSA TO ALIGN WITH DOD REQUIREMENTS FOR THE ENTERPRISE SUSTAINMENT MANAGEMENT SYSTEM (ESMS) - BUILDER. | Department Of The Army | 541330 | $148K | Sep 29, 2025 | Sep 28, 2026 |
| W9124P25F0386 ↗ | ENVIRONMENTAL BIOLOGICAL SUPPORT | Department Of The Army | 541620 | $143K | May 8, 2025 | May 7, 2026 |
| W9124P25FA052 ↗ | PROVIDE QUALITY ASSURANCE EVALUATOR (QAE) TO PROVIDE PERFORMANCE ASSURANCE BY MONITORING METERING DATA FOR ALL BUILDINGS ON SITE AND IMPLEMENTING MODIFICATIONS TO VERIFY IMPROVED BUILDING ENERGY USAGE. | Department Of The Army | 541330 | $126K | Jul 31, 2025 | Jul 30, 2026 |
| W9124P25F0136 ↗ | CLIN 3010 - ENGINEERING SUPPORT | Department Of The Army | 541330 | $86K | Nov 3, 2024 | Nov 2, 2025 |
| W9124P25FA103 ↗ | THE FBI IS LOOKING ASSIST FROM DPW TO CREATE A FEASIBILITY STUDY AND MODEL TO UNDERSTAND THE REQUIREMENTS FOR USING THE SUBSTATION 24 GEN TO POWER THE FBI AT SUBSTATION 10 AND PROVIDE REDUNDANT POWER TO THE FBI CAMPUS IN THE EVENT OF POWER LOSS . | Department Of The Army | 541330 | $85K | Aug 28, 2025 | Sep 27, 2026 |
| W9124P25FA095 ↗ | GEOGRAPHIC INFORMATION SYSTEM (GIS) IS A COMPUTER SYSTEM THAT ANALYZES AND DISPLAYS GEOGRAPHICALLY REFERENCED INFORMATION. IT USES DATA THAT IS ATTACHED TO A UNIQUE LOCATION. | Department Of The Army | 541330 | $13K | Aug 28, 2025 | Sep 4, 2025 |
| W912HQ24D0004 ↗ | HQ - SUPPORT SERVICES SATOC - POWER RELIABILITY ENHANCEMENT PROGRAM (PREP) - CHANGE THE CAGE CODE | Department Of The Army | 237130 | $0 | Sep 25, 2024 | — |
| W9124P23F0657 ↗ | SCIENTIFIC STUDIES, SURVEYS, AND REPORTS | Department Of The Army | 541620 | $0 | Jul 30, 2023 | Jan 13, 2025 |
| W9124P24F0641 ↗ | MODIFICATION | Department Of The Army | 541330 | $0 | Aug 29, 2024 | Jun 30, 2025 |
| W9124P24F0280 ↗ | SCIENTIFIC STUDIES, SURVEYS, AND REPORTS | Department Of The Army | 541620 | $0 | Jul 11, 2024 | Jul 11, 2025 |
| W9124P21D0002 ↗ | ENGINEERING SUPPORT | Department Of The Army | 541330 | $0 | Jul 5, 2021 | — |