Central Southern Construction Corp.
UEI GKU1XRD7BCX7 · FL · SAM.gov record ↗
Obligations by agency
- Department Of Transportation$85.3M
- Department Of The Interior$-1.3M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- 693C7325F00021N ↗$2.3M
NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO
- Ends
- Oct 30, 2026
- Started
- Dec 22, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325C000014 ↗$7.8M
PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE
- Ends
- Feb 15, 2027
- Started
- Jul 22, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00055N ↗$662K
PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU
- Ends
- Feb 27, 2027
- Started
- Apr 24, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7323C000008 ↗$154K
NP-NATR 3E16, 3F25 693C7323C000008 CM #7 INCREASE CONTRACT AMOUNT BY $153,751.00 EXTEND CONTRACT TIME BY 19 CALENDAR DAYS
- Ends
- Mar 30, 2027
- Started
- Jun 28, 2023
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00034N ↗$3.5M
PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE
- Ends
- May 17, 2027
- Started
- Feb 25, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00080N ↗$477K
PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.
- Ends
- May 30, 2027
- Started
- Jun 30, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00025N ↗$6.8M
PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN
- Ends
- Nov 29, 2027
- Started
- Dec 30, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00023N ↗$14.7M
PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC
- Ends
- Dec 30, 2027
- Started
- Dec 25, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325C000012 ↗$9.1M
MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND
- Ends
- Jan 13, 2028
- Started
- Apr 30, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00007N ↗$1.6M
PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.
- Ends
- Jan 30, 2028
- Started
- Nov 21, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 693C7325F00021N ↗ | NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO | Federal Highway Administration | 237310 | $2.3M | Dec 22, 2024 | Oct 30, 2026 |
| 693C7325C000014 ↗ | PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE | Federal Highway Administration | 237310 | $7.8M | Jul 22, 2025 | Feb 15, 2027 |
| 693C7325F00055N ↗ | PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU | Federal Highway Administration | 237310 | $662K | Apr 24, 2025 | Feb 27, 2027 |
| 693C7323C000008 ↗ | NP-NATR 3E16, 3F25 693C7323C000008 CM #7 INCREASE CONTRACT AMOUNT BY $153,751.00 EXTEND CONTRACT TIME BY 19 CALENDAR DAYS | Federal Highway Administration | 237310 | $154K | Jun 28, 2023 | Mar 30, 2027 |
| 693C7325F00034N ↗ | PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE | Federal Highway Administration | 237310 | $3.5M | Feb 25, 2025 | May 17, 2027 |
| 693C7325F00080N ↗ | PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | Federal Highway Administration | 237310 | $477K | Jun 30, 2025 | May 30, 2027 |
| 693C7325F00025N ↗ | PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | Federal Highway Administration | 237310 | $6.8M | Dec 30, 2024 | Nov 29, 2027 |
| 693C7325F00023N ↗ | PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | Federal Highway Administration | 237310 | $14.7M | Dec 25, 2024 | Dec 30, 2027 |
| 693C7325C000012 ↗ | MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND | Federal Highway Administration | 237310 | $9.1M | Apr 30, 2025 | Jan 13, 2028 |
| 693C7325F00007N ↗ | PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | Federal Highway Administration | 237310 | $1.6M | Nov 21, 2024 | Jan 30, 2028 |
Largest awards
- 693C7325F00023N ↗$14.7M
PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC
- Ends
- Dec 30, 2027
- Started
- Dec 25, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 69056726F00009N ↗$10.5M
FUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.
- Ends
- Sep 2, 2026
- Started
- Dec 7, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325C000012 ↗$9.1M
MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND
- Ends
- Jan 13, 2028
- Started
- Apr 30, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325C000007 ↗$8.9M
PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC
- Ends
- Mar 30, 2028
- Started
- Jan 8, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325C000014 ↗$7.8M
PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE
- Ends
- Feb 15, 2027
- Started
- Jul 22, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00025N ↗$6.8M
PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN
- Ends
- Nov 29, 2027
- Started
- Dec 30, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00075N ↗$6.6M
PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.
- Ends
- Jul 30, 2028
- Started
- May 26, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 69056726F00025N ↗$4.8M
CONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.
- Ends
- Jul 23, 2026
- Started
- Feb 12, 2026
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00085N ↗$4.3M
PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.
- Ends
- Jun 29, 2028
- Started
- Jun 30, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00034N ↗$3.5M
PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE
- Ends
- May 17, 2027
- Started
- Feb 25, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00021N ↗$2.3M
NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO
- Ends
- Oct 30, 2026
- Started
- Dec 22, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00093N ↗$1.8M
GA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG
- Ends
- May 30, 2028
- Started
- Jul 17, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00008N ↗$1.7M
PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.
- Ends
- Mar 30, 2028
- Started
- Jan 2, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00007N ↗$1.6M
PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.
- Ends
- Jan 30, 2028
- Started
- Nov 21, 2024
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00055N ↗$662K
PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU
- Ends
- Feb 27, 2027
- Started
- Apr 24, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7325F00080N ↗$477K
PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.
- Ends
- May 30, 2027
- Started
- Jun 30, 2025
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7323C000008 ↗$154K
NP-NATR 3E16, 3F25 693C7323C000008 CM #7 INCREASE CONTRACT AMOUNT BY $153,751.00 EXTEND CONTRACT TIME BY 19 CALENDAR DAYS
- Ends
- Mar 30, 2027
- Started
- Jun 28, 2023
- Agency
- Federal Highway Administration
- NAICS
- 237310
- 693C7326P000005 ↗$150K
PROJECT - VA NP GWMP MVT(4) - STIPEND FEE FOR UNSUCCESSFUL FIRM
- Ends
- Feb 26, 2026
- Started
- Jan 6, 2026
- Agency
- Federal Highway Administration
- NAICS
- 237310
MIDWEST REGIONAL CONSTRUCTION IDIQ MATOC THE PURPOSE OF THIS NO-COST MODIFICATION IS TO: 1. IN ACCORDANCE WITH FAR CLAUSE 52.217-8, TITLED "OPTION TO EXTEND SERVICES," CITED CONTRACT IS HEREBY MODIFIED TO EXTEND THE CONTRACT PERIOD OF PER
- Ends
- —
- Started
- Sep 18, 2020
- Agency
- Federal Highway Administration
- NAICS
- 237310
THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO CLOSE THIS CONTRACT CONTRACTUALLY AND FINANCIALLY IN THE TOTAL AMOUNT OF $471,902.00.
- Ends
- Jun 21, 2020
- Started
- Nov 13, 2018
- Agency
- Federal Highway Administration
- NAICS
- 237310
THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $489,380.00.
- Ends
- Jun 29, 2023
- Started
- Mar 3, 2021
- Agency
- Federal Highway Administration
- NAICS
- 237310
PROJECT FL ERFO NPS GUIS 2020-1(1): THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO RECLASSIFY FUNDS FOR REIMBURSING FLTP FUNDS WITH ERFO FUNDS USING NEW ACCOUNTING INFORMATION 151512ER20001 540.CN.ER02.12 1512000000 AS FOLLOWS: 1. C
- Ends
- Sep 29, 2023
- Started
- Jul 27, 2021
- Agency
- Federal Highway Administration
- NAICS
- 237310
NP-EVER 219(1), 222(1) THE PURPOSE OF MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $2,276,874.70.
- Ends
- Mar 30, 2024
- Started
- Sep 15, 2021
- Agency
- Federal Highway Administration
- NAICS
- 237310
THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $2,555,354.15.
- Ends
- Nov 13, 2024
- Started
- May 11, 2022
- Agency
- Federal Highway Administration
- NAICS
- 237310
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO AUGUST 15, 2025 SO THE CONTRACTOR CAN SUBMIT THEIR FINAL INVOICE AND THE CONTRACT CAN BE CLOSED OUT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- Ends
- Aug 14, 2025
- Started
- Aug 22, 2024
- Agency
- National Park Service
- NAICS
- 238910
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 693C7325F00023N ↗ | PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | Federal Highway Administration | 237310 | $14.7M | Dec 25, 2024 | Dec 30, 2027 |
| 69056726F00009N ↗ | FUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | Federal Highway Administration | 237310 | $10.5M | Dec 7, 2025 | Sep 2, 2026 |
| 693C7325C000012 ↗ | MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND | Federal Highway Administration | 237310 | $9.1M | Apr 30, 2025 | Jan 13, 2028 |
| 693C7325C000007 ↗ | PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC | Federal Highway Administration | 237310 | $8.9M | Jan 8, 2025 | Mar 30, 2028 |
| 693C7325C000014 ↗ | PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE | Federal Highway Administration | 237310 | $7.8M | Jul 22, 2025 | Feb 15, 2027 |
| 693C7325F00025N ↗ | PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | Federal Highway Administration | 237310 | $6.8M | Dec 30, 2024 | Nov 29, 2027 |
| 693C7325F00075N ↗ | PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | Federal Highway Administration | 237310 | $6.6M | May 26, 2025 | Jul 30, 2028 |
| 69056726F00025N ↗ | CONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | Federal Highway Administration | 237310 | $4.8M | Feb 12, 2026 | Jul 23, 2026 |
| 693C7325F00085N ↗ | PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | Federal Highway Administration | 237310 | $4.3M | Jun 30, 2025 | Jun 29, 2028 |
| 693C7325F00034N ↗ | PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE | Federal Highway Administration | 237310 | $3.5M | Feb 25, 2025 | May 17, 2027 |
| 693C7325F00021N ↗ | NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO | Federal Highway Administration | 237310 | $2.3M | Dec 22, 2024 | Oct 30, 2026 |
| 693C7325F00093N ↗ | GA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG | Federal Highway Administration | 237310 | $1.8M | Jul 17, 2025 | May 30, 2028 |
| 693C7325F00008N ↗ | PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | Federal Highway Administration | 237310 | $1.7M | Jan 2, 2025 | Mar 30, 2028 |
| 693C7325F00007N ↗ | PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | Federal Highway Administration | 237310 | $1.6M | Nov 21, 2024 | Jan 30, 2028 |
| 693C7325F00055N ↗ | PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU | Federal Highway Administration | 237310 | $662K | Apr 24, 2025 | Feb 27, 2027 |
| 693C7325F00080N ↗ | PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | Federal Highway Administration | 237310 | $477K | Jun 30, 2025 | May 30, 2027 |
| 693C7323C000008 ↗ | NP-NATR 3E16, 3F25 693C7323C000008 CM #7 INCREASE CONTRACT AMOUNT BY $153,751.00 EXTEND CONTRACT TIME BY 19 CALENDAR DAYS | Federal Highway Administration | 237310 | $154K | Jun 28, 2023 | Mar 30, 2027 |
| 693C7326P000005 ↗ | PROJECT - VA NP GWMP MVT(4) - STIPEND FEE FOR UNSUCCESSFUL FIRM | Federal Highway Administration | 237310 | $150K | Jan 6, 2026 | Feb 26, 2026 |
| 693C7320D000022 ↗ | MIDWEST REGIONAL CONSTRUCTION IDIQ MATOC THE PURPOSE OF THIS NO-COST MODIFICATION IS TO: 1. IN ACCORDANCE WITH FAR CLAUSE 52.217-8, TITLED "OPTION TO EXTEND SERVICES," CITED CONTRACT IS HEREBY MODIFIED TO EXTEND THE CONTRACT PERIOD OF PER | Federal Highway Administration | 237310 | $0 | Sep 18, 2020 | — |
| 693C7319C000001 ↗ | THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO CLOSE THIS CONTRACT CONTRACTUALLY AND FINANCIALLY IN THE TOTAL AMOUNT OF $471,902.00. | Federal Highway Administration | 237310 | $0 | Nov 13, 2018 | Jun 21, 2020 |
| 693C7321F000048 ↗ | THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $489,380.00. | Federal Highway Administration | 237310 | $0 | Mar 3, 2021 | Jun 29, 2023 |
| 693C7321F000087 ↗ | PROJECT FL ERFO NPS GUIS 2020-1(1): THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO RECLASSIFY FUNDS FOR REIMBURSING FLTP FUNDS WITH ERFO FUNDS USING NEW ACCOUNTING INFORMATION 151512ER20001 540.CN.ER02.12 1512000000 AS FOLLOWS: 1. C | Federal Highway Administration | 237310 | $0 | Jul 27, 2021 | Sep 29, 2023 |
| 693C7321F000109 ↗ | NP-EVER 219(1), 222(1) THE PURPOSE OF MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $2,276,874.70. | Federal Highway Administration | 237310 | $0 | Sep 15, 2021 | Mar 30, 2024 |
| 693C7322C000013 ↗ | THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $2,555,354.15. | Federal Highway Administration | 237310 | $0 | May 11, 2022 | Nov 13, 2024 |
| 140P5424C0019 ↗ | THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO AUGUST 15, 2025 SO THE CONTRACTOR CAN SUBMIT THEIR FINAL INVOICE AND THE CONTRACT CAN BE CLOSED OUT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. | National Park Service | 238910 | $0 | Aug 22, 2024 | Aug 14, 2025 |