Central Southern Construction Corp.

UEI GKU1XRD7BCX7 · FL · SAM.gov record ↗

$84.0M
FY2025 obligations
32
Contract awards
Nov 4, 2018
First action
Jun 2, 2026
Latest action

Obligations by agency

  • Department Of Transportation$85.3M
  • Department Of The Interior$-1.3M

Obligations by NAICS

Monthly obligations

Oct 24
Nov 24
Dec 24
Jan 25
Feb 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Oct 25
Nov 25
Dec 25
Jan 26
Feb 26
Mar 26
May 26
Jun 26

Contracts ending within 18 months (recompete watch)

PIIDDescriptionAgencyNAICSObligatedStartEnd
69056726F00025NCONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.Federal Highway Administration237310$4.8MFeb 12, 2026Jul 23, 2026
69056726F00009NFUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.Federal Highway Administration237310$10.5MDec 7, 2025Sep 2, 2026
693C7325F00021NNC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TOFederal Highway Administration237310$2.3MDec 22, 2024Oct 30, 2026
693C7325C000014PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVEFederal Highway Administration237310$7.8MJul 22, 2025Feb 15, 2027
693C7325F00055NPROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOUFederal Highway Administration237310$662KApr 24, 2025Feb 27, 2027
693C7323C000008NP-NATR 3E16, 3F25 693C7323C000008 CM #7 INCREASE CONTRACT AMOUNT BY $153,751.00 EXTEND CONTRACT TIME BY 19 CALENDAR DAYSFederal Highway Administration237310$154KJun 28, 2023Mar 30, 2027
693C7325F00034NPROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED AREFederal Highway Administration237310$3.5MFeb 25, 2025May 17, 2027
693C7325F00080NPROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.Federal Highway Administration237310$477KJun 30, 2025May 30, 2027
693C7325F00025NPROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONINFederal Highway Administration237310$6.8MDec 30, 2024Nov 29, 2027
693C7325F00023NPROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITCFederal Highway Administration237310$14.7MDec 25, 2024Dec 30, 2027

Largest awards

PIIDDescriptionAgencyNAICSObligatedStartEnd
693C7325F00023NPROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITCFederal Highway Administration237310$14.7MDec 25, 2024Dec 30, 2027
69056726F00009NFUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.Federal Highway Administration237310$10.5MDec 7, 2025Sep 2, 2026
693C7325C000012MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING ANDFederal Highway Administration237310$9.1MApr 30, 2025Jan 13, 2028
693C7325C000007PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPACFederal Highway Administration237310$8.9MJan 8, 2025Mar 30, 2028
693C7325C000014PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVEFederal Highway Administration237310$7.8MJul 22, 2025Feb 15, 2027
693C7325F00025NPROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONINFederal Highway Administration237310$6.8MDec 30, 2024Nov 29, 2027
693C7325F00075NPROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.Federal Highway Administration237310$6.6MMay 26, 2025Jul 30, 2028
69056726F00025NCONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.Federal Highway Administration237310$4.8MFeb 12, 2026Jul 23, 2026
693C7325F00085NPROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.Federal Highway Administration237310$4.3MJun 30, 2025Jun 29, 2028
693C7325F00034NPROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED AREFederal Highway Administration237310$3.5MFeb 25, 2025May 17, 2027
693C7325F00021NNC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TOFederal Highway Administration237310$2.3MDec 22, 2024Oct 30, 2026
693C7325F00093NGA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREGFederal Highway Administration237310$1.8MJul 17, 2025May 30, 2028
693C7325F00008NPROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.Federal Highway Administration237310$1.7MJan 2, 2025Mar 30, 2028
693C7325F00007NPROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.Federal Highway Administration237310$1.6MNov 21, 2024Jan 30, 2028
693C7325F00055NPROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOUFederal Highway Administration237310$662KApr 24, 2025Feb 27, 2027
693C7325F00080NPROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.Federal Highway Administration237310$477KJun 30, 2025May 30, 2027
693C7323C000008NP-NATR 3E16, 3F25 693C7323C000008 CM #7 INCREASE CONTRACT AMOUNT BY $153,751.00 EXTEND CONTRACT TIME BY 19 CALENDAR DAYSFederal Highway Administration237310$154KJun 28, 2023Mar 30, 2027
693C7326P000005PROJECT - VA NP GWMP MVT(4) - STIPEND FEE FOR UNSUCCESSFUL FIRMFederal Highway Administration237310$150KJan 6, 2026Feb 26, 2026
693C7320D000022MIDWEST REGIONAL CONSTRUCTION IDIQ MATOC THE PURPOSE OF THIS NO-COST MODIFICATION IS TO: 1. IN ACCORDANCE WITH FAR CLAUSE 52.217-8, TITLED "OPTION TO EXTEND SERVICES," CITED CONTRACT IS HEREBY MODIFIED TO EXTEND THE CONTRACT PERIOD OF PERFederal Highway Administration237310$0Sep 18, 2020
693C7319C000001THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO CLOSE THIS CONTRACT CONTRACTUALLY AND FINANCIALLY IN THE TOTAL AMOUNT OF $471,902.00.Federal Highway Administration237310$0Nov 13, 2018Jun 21, 2020
693C7321F000048THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $489,380.00.Federal Highway Administration237310$0Mar 3, 2021Jun 29, 2023
693C7321F000087PROJECT FL ERFO NPS GUIS 2020-1(1): THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO RECLASSIFY FUNDS FOR REIMBURSING FLTP FUNDS WITH ERFO FUNDS USING NEW ACCOUNTING INFORMATION 151512ER20001 540.CN.ER02.12 1512000000 AS FOLLOWS: 1. CFederal Highway Administration237310$0Jul 27, 2021Sep 29, 2023
693C7321F000109NP-EVER 219(1), 222(1) THE PURPOSE OF MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $2,276,874.70.Federal Highway Administration237310$0Sep 15, 2021Mar 30, 2024
693C7322C000013THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $2,555,354.15.Federal Highway Administration237310$0May 11, 2022Nov 13, 2024
140P5424C0019THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO AUGUST 15, 2025 SO THE CONTRACTOR CAN SUBMIT THEIR FINAL INVOICE AND THE CONTRACT CAN BE CLOSED OUT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.National Park Service238910$0Aug 22, 2024Aug 14, 2025