FedQuery

Intuitive Machines, LLC

UEI HQHKENU27Y83 · TX · SAM.gov record ↗

$105.3M
FY2025 obligations
24
Contract awards
Nov 28, 2018
First action
Jun 29, 2026
Latest action

Monthly obligations

Nov 24
Dec 24
Jan 25
Feb 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Oct 25
Dec 25
Jan 26
Feb 26
Mar 26
May 26
Jun 26

Contracts ending within 18 months (recompete watch)

PIIDDescriptionAgencyNAICSObligatedStartEnd
80JSC021F0004COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER (TO) POLAR RESOURCE ICE-MINING EXPERIMENT-1 (PRIME-1) LUNAR SURFACE PAYLOAD DELIVERY -LUNAR POLENational Aeronautics And Space Administration481212$-6.2MOct 15, 2020Jul 30, 2026
80HQTR25CA004THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES. THE CONTRACTOR SHALL PERFORM A STUDY WITH THE OBJECTIVE OF DEVELOPING A LOGISTICS HANDLING AND OFFLOADING CONCEPT.National Aeronautics And Space Administration541715$3.7MApr 29, 2025Aug 29, 2026
80GSFC25C0006PHASE E LROC CONTRACT AWARDNational Aeronautics And Space Administration336414$3.6MSep 29, 2025Sep 29, 2026
80HQTR26C0001SUSTAINED OPERATIONS OF THE SHADOWCAM INSTRUMENT ABOARD THE KOREA PATHFINDER LUNAR ORBITER (KPLO) MISSION AS DESCRIBED IN ATTACHMENT A, STATEMENT OF WORK (SOW).National Aeronautics And Space Administration541715$1.9MMar 31, 2026Mar 30, 2027
80JSC022F0022CLPS TASK ORDER CP-11 CLPS PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOONNational Aeronautics And Space Administration481212$-874KNov 16, 2021Mar 30, 2027
80JSC026F7020FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.National Aeronautics And Space Administration481212$13.7MJun 29, 2026Aug 29, 2027

Largest awards

PIIDDescriptionAgencyNAICSObligatedStartEnd
80JSC026F7009CLPS TASK ORDER CT-4 PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON.National Aeronautics And Space Administration481212$46.8MMar 24, 2026May 30, 2031
80GSFC24CA018NEAR SPACE NETWORK (NSN) SERVICES (SUBCATEGORY 2.2 GEO TO CIS-LUNAR RELAY)National Aeronautics And Space Administration517410$22.0MSep 30, 2024Sep 29, 2029
80JSC026F7020FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.National Aeronautics And Space Administration481212$13.7MJun 29, 2026Aug 29, 2027
80JSC024F0079COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS), CP-22 REV 5National Aeronautics And Space Administration481212$11.7MAug 28, 2024Aug 30, 2028
FA945323CX010SPACE TECHNOLOGY ADVANCED RESEARCH - FAST-TRACKING INNOVATIVE SOFTWARE AND HARDWARE (STAR-FISH), TOPIC AREA 1, JOINT EMERGENT TECHNOLOGY SUPPLYING ON-ORBIT NUCLEAR POWER (JETSON) LOW POWER MISSION APPLICATION (CALL 007)Department Of The Air Force541715$8.2MSep 28, 2023Mar 28, 2028
80HQTR25CA004THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES. THE CONTRACTOR SHALL PERFORM A STUDY WITH THE OBJECTIVE OF DEVELOPING A LOGISTICS HANDLING AND OFFLOADING CONCEPT.National Aeronautics And Space Administration541715$3.7MApr 29, 2025Aug 29, 2026
80GSFC25C0006PHASE E LROC CONTRACT AWARDNational Aeronautics And Space Administration336414$3.6MSep 29, 2025Sep 29, 2026
80HQTR26C0001SUSTAINED OPERATIONS OF THE SHADOWCAM INSTRUMENT ABOARD THE KOREA PATHFINDER LUNAR ORBITER (KPLO) MISSION AS DESCRIBED IN ATTACHMENT A, STATEMENT OF WORK (SOW).National Aeronautics And Space Administration541715$1.9MMar 31, 2026Mar 30, 2027
80GSFC25CA007NEAR SPACE NETWORK (NSN) SERVICES (SUBCATEGORIES 1.2 (GEO TO CISLUNAR DIRECT TO EARTH (DTE)) AND 1.3 (XCISLUNAR DTE))National Aeronautics And Space Administration517410$690KJan 31, 2025Sep 29, 2029
80JSC024FA180PRE PRICED EVALUATION OF NASA MISSION REQUIREMENTS ASSESSMENTNational Aeronautics And Space Administration336414$680KSep 26, 2024Dec 30, 2025
80JSC025F7060CX-1 INTUITIVE MACHINES MID-SIZED LANDER STUDY BASE AWARDNational Aeronautics And Space Administration481212$492KJul 15, 2025Sep 29, 2025
80JSC025FA135THE SPECIAL STUDY FOR LTVS CAPABILITIES IS INTENDED TO INCREASE NASA UNDERSTANDING THE EXTENT OF CURRENT CAPABILITIES TO SUPPORT THE UNCREWED TRANSFER OF LOGISTICS ITEMS ON THE LTV AND POSSIBLE MODIFICATIONS THAT COULD INCREASE THESE CAPABILITIESNational Aeronautics And Space Administration336414$462KJul 14, 2025Nov 27, 2025
47QRCA25DS434ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC)Federal Acquisition Service541715$3KDec 18, 2024
47QRCA25DU617ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC)Federal Acquisition Service541350$3KDec 16, 2024
HQ085926FG421SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER.Missile Defense Agency541715$500Dec 28, 2025Dec 27, 2035
HQ085926DG207THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MATERIALS, LABOR, EQUIPMENT AND FACILITIES INCIDENTAL TO THE PERFORMANCE OF THIS REQUIREMENT IN ACCORDANCE WITH THE TERMS OF THE ORDER.Missile Defense Agency541715$0Dec 28, 2025
80GSFC24CA073NEXT SPACE TECHNOLOGIES FOR EXPLORATION PARTNERSHIPS 2-(NEXTSTEP-2)National Aeronautics And Space Administration541715$0Sep 30, 2024Apr 29, 2025
80GSFC23CA075NEXT SPACE TECHNOLOGIES FOR EXPLORATION PARTNERSHIPS 2-(NEXTSTEP-2) CIS CAPABILITIES STUDIES FOR WIDEBAND/PHASED ARRAY/CROSSLINKNational Aeronautics And Space Administration541715$0Sep 10, 2023Aug 31, 2025
80HQTR19D0010COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)National Aeronautics And Space Administration481212$0Nov 28, 2018
80JSC024DA020MODIFICATION TO REMOVE DEIA DRD REQUIREMENTS IN ORDER TO COMPLY WITH RECENT EXECUTIVE ORDER.National Aeronautics And Space Administration336414$0Mar 27, 2024
80JSC019F0165LUNAR SURFACE TRANSPORTATION-NASA PROVIDED LUNAR PAYLOAD (NPLP) DELIVERYNational Aeronautics And Space Administration481212$-588KMay 29, 2019Nov 29, 2024
80JSC022F0022CLPS TASK ORDER CP-11 CLPS PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOONNational Aeronautics And Space Administration481212$-874KNov 16, 2021Mar 30, 2027
80LARC21C0007DEPLOYABLE HOPPER FOR EXTREME LUNAR SURFACE ACCESS. DEVELOP AND DEMONSTRATE A SMALL ROBOTIC HOPPER, DEPLOYED AS A SECONDARY PAYLOAD FROM THE NOVA-C LANDER, THAT CAN PROVIDE ACCESS TO EXTREME ENVIRONMENTS AND LOCATIONS OF INTEREST ON THE LUNAR SURFACENational Aeronautics And Space Administration541715$-982KFeb 28, 2021Sep 30, 2025
80JSC021F0004COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER (TO) POLAR RESOURCE ICE-MINING EXPERIMENT-1 (PRIME-1) LUNAR SURFACE PAYLOAD DELIVERY -LUNAR POLENational Aeronautics And Space Administration481212$-6.2MOct 15, 2020Jul 30, 2026