Sandow Construction INC
UEI JJKPJR3QLCL5 · MD · SAM.gov record ↗
$19.5M
FY2025 obligations
55
Contract awards
Jul 7, 2021
First action
Jun 24, 2026
Latest action
Obligations by agency
- Department Of Veterans Affairs$9.1M
- Department Of Defense$6.0M
- General Services Administration$3.2M
- Department Of Agriculture$856K
- Department Of Commerce$248K
- Department Of Homeland Security$90K
- Department Of The Treasury$24K
- Department Of Health And Human Services$22K
Obligations by NAICS
Monthly obligations
Oct 24
Nov 24
Dec 24
Jan 25
Feb 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Oct 25
Nov 25
Dec 25
Jan 26
Feb 26
Mar 26
Apr 26
Jun 26
Contracts ending within 18 months (recompete watch)
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 47PM0425C0029 ↗ | USGS CHILLER REPLACEMENT AT THE USGS BUILDING 12201 SUNRISE VALLEY DRIVE | Public Buildings Service | 236220 | $3.2M | Sep 17, 2025 | Aug 13, 2026 |
| 36C10F26C0002 ↗ | VACO TURNSTILES PROJECT AT VACO HEADQUARTERS, 810 VERMONT AVE NW, WASHINGTON, D.C. 20420 | Department Of Veterans Affairs | 236220 | $758K | Mar 5, 2026 | Sep 1, 2026 |
| 36C24526P0297 ↗ | TOWER REMOVAL | Department Of Veterans Affairs | 238190 | $236K | Mar 29, 2026 | Sep 29, 2026 |
| N0016726F1051 ↗ | PROJECT TO UPGRADE EXISTING LIGHTNING PROTECTION SYSTEM AND DEMO/ REMOVAL OF BLDG 80 ROOFING SYSTEM DOWN TO ROOF DECK DEMOLITION/REMOVAL OF BLDG 68 ROOFING SYSTEM TO ROOF DECK, IN ACCORDANCE W/ STATEMENT OF WORK AS ATTACHED IN 00 73 00, NUMBER 01 | Department Of The Navy | 236220 | $775K | Mar 2, 2026 | Nov 16, 2026 |
| 36C24523C0137 ↗ | MOD TO ADD MISSED BUILDING DURING SOLICITATION AND REMOVE ITEMS THAT ARE NO LONGER NEEDED. | Department Of Veterans Affairs | 236220 | $3.2M | Sep 28, 2023 | Feb 21, 2027 |
| 12305B23C0011 ↗ | O&M: CHILLER SERVICE/ MAINTENANCE CONDUCT PREVENTIVE MAINTENANCE, AND MINOR SERVICE REPAIRS CONDUCT PREVENTIVE MAINTENANCE, AND MINOR SERVICE REPAIRS | Agricultural Research Service | 561210 | $809K | Jul 11, 2023 | Jul 10, 2027 |
Largest awards
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 36C24523C0137 ↗ | MOD TO ADD MISSED BUILDING DURING SOLICITATION AND REMOVE ITEMS THAT ARE NO LONGER NEEDED. | Department Of Veterans Affairs | 236220 | $3.2M | Sep 28, 2023 | Feb 21, 2027 |
| N0016725F0023 ↗ | BLDG 4 & 5 SMOKE AND FIRE REMEDIATION | Department Of The Navy | 236220 | $3.2M | Nov 19, 2024 | Feb 27, 2025 |
| 47PM0425C0029 ↗ | USGS CHILLER REPLACEMENT AT THE USGS BUILDING 12201 SUNRISE VALLEY DRIVE | Public Buildings Service | 236220 | $3.2M | Sep 17, 2025 | Aug 13, 2026 |
| 36C24525N0183 ↗ | VISN 5 ABATEMENT IDIQ EMERGENCY FLOOD MITIGATION | Department Of Veterans Affairs | 562910 | $3.1M | Dec 30, 2024 | Dec 18, 2025 |
| 36C24526F0127 ↗ | VISN 05 EMERGENCY CLEANUP SERVICES | Department Of Veterans Affairs | 562910 | $1.1M | Dec 25, 2025 | Mar 30, 2026 |
| 12305B23C0011 ↗ | O&M: CHILLER SERVICE/ MAINTENANCE CONDUCT PREVENTIVE MAINTENANCE, AND MINOR SERVICE REPAIRS CONDUCT PREVENTIVE MAINTENANCE, AND MINOR SERVICE REPAIRS | Agricultural Research Service | 561210 | $809K | Jul 11, 2023 | Jul 10, 2027 |
| N0016726F1051 ↗ | PROJECT TO UPGRADE EXISTING LIGHTNING PROTECTION SYSTEM AND DEMO/ REMOVAL OF BLDG 80 ROOFING SYSTEM DOWN TO ROOF DECK DEMOLITION/REMOVAL OF BLDG 68 ROOFING SYSTEM TO ROOF DECK, IN ACCORDANCE W/ STATEMENT OF WORK AS ATTACHED IN 00 73 00, NUMBER 01 | Department Of The Navy | 236220 | $775K | Mar 2, 2026 | Nov 16, 2026 |
| 36C10F26C0002 ↗ | VACO TURNSTILES PROJECT AT VACO HEADQUARTERS, 810 VERMONT AVE NW, WASHINGTON, D.C. 20420 | Department Of Veterans Affairs | 236220 | $758K | Mar 5, 2026 | Sep 1, 2026 |
| W912DR22C0031 ↗ | CHANGE AH TEMPORARY CHILLER BUILDING 250 MODIFICATION | Department Of The Army | 236220 | $451K | Jun 23, 2022 | Jul 15, 2025 |
| N0016726F0001 ↗ | REMOVAL OF THE EXISTING ROOFING SYSTEM DOWN TO THE ROOF DECK AND INSTALL A NEW THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE SYSTEM OVER THE ROOF DECK AND NEW INSULATION THAT COMPLIES WITH THICKNESS REQUIREMENTS LAID OUT IN THE UFCS. | Department Of The Navy | 236220 | $445K | Nov 20, 2025 | May 31, 2026 |
| 36C24526N0304 ↗ | VISN 05 EMERGENCY CLEANUP SERVICES | Department Of Veterans Affairs | 562910 | $370K | Feb 4, 2026 | Apr 30, 2026 |
| 36C24526P0297 ↗ | TOWER REMOVAL | Department Of Veterans Affairs | 238190 | $236K | Mar 29, 2026 | Sep 29, 2026 |
| N0016725F1066 ↗ | THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND INCIDENTALS NECESSARY TO RENOVATE APPROXIMATELY 14,450 SQ FT OF OFFICE SPACE IN BUILDING 4E, 2ND FLOOR OFFICES. WORK INCLUDES DEMOLITION, ELECTRICAL, CARPENTRY, PAINTING. | Department Of The Navy | 236220 | $177K | Jun 3, 2025 | Oct 6, 2025 |
| N0016725F1002 ↗ | INSTALL ARGON GAS LINE AND GRAVEL BASE PAD | Department Of The Navy | 236220 | $172K | Apr 16, 2025 | Sep 29, 2025 |
| 36C24525N0687 ↗ | VISN 5 ABATEMENT IDIQ | Department Of Veterans Affairs | 562910 | $162K | Jul 13, 2025 | Sep 11, 2025 |
| 1333ND25FNB190115 ↗ | FUME HOODS & EXHAUST FANS | National Institute Of Standards And Technology | 236220 | $157K | Jul 9, 2025 | Apr 23, 2026 |
| HQ003425PE124 ↗ | DISASSEMBLE, DISMANTLE, AND DISPOSE MOBILE TRAILERS AT THE PENTAGON IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED JULY 7, 2025. | Washington Headquarters Services | 238910 | $150K | Sep 28, 2025 | Jan 29, 2026 |
| N0016725F1159 ↗ | CONTRACTOR SHALL INSPECT, TEST, AND REPAIR THE DAMAGED, INTERNAL, ELECTRICAL COMPONENTS OF THE ENCLOSED, MEDIUM-VOLTAGE SWITCHGEAR ASSEMBLY LOCATED ADJACENT TO BUILDING 42. | Department Of The Navy | 236220 | $104K | Aug 24, 2025 | Jun 14, 2026 |
| N0016725F1131 ↗ | THE CONTRACTOR SHALL SUPPLY ALL MATERIAL, LABOR AND SUPERVISION NECESSARY TO ADD TWO MEZZANINE PIVOT GATES, ONE FALL ARREST SYSTEM, AND ONE TRAVEL RESTRAINT ON FOUR ELEVATED PLATFORMS COMPLETE AND READY FOR USE AT THE NSWC CARDEROCK DIVISION | Department Of The Navy | 236220 | $93K | Jul 31, 2025 | Oct 30, 2025 |
| 36C24525N0935 ↗ | VISN 05 EMERGENCY CLEANUP SERVICES | Department Of Veterans Affairs | 562910 | $92K | Aug 20, 2025 | Sep 19, 2025 |
| 70Z02726PPORT0024 ↗ | HAZMAT BUILDING OVERHAULS AT USCG STATION INDIAN RIVER | U.S. Coast Guard | 238990 | $90K | Mar 10, 2026 | May 9, 2026 |
| N0016725F1147 ↗ | CONTRACTOR SHALL REMOVE THE EXISTING VAULT DOOR AND REPLACE WITH A NEW DOOR. | Department Of The Navy | 236220 | $79K | Aug 26, 2025 | Mar 5, 2026 |
| 1333ND25FNB190138 ↗ | SITE WATER FOUNTAINS REPLACEMENT OU19-25-NEW-281 | National Institute Of Standards And Technology | 236220 | $78K | Aug 14, 2025 | Jun 2, 2026 |
| N0016724F0215 ↗ | B1 ROOF REPLACEMENT | Department Of The Navy | 236220 | $74K | Jul 30, 2024 | Jan 7, 2025 |
| N0016725F1082 ↗ | THE CONTRACTOR SHALL PROVIDE THE NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPAIR A PORTION OF THE BUILDING 4 EAST CONCRETE SLAB WHICH WAS DAMAGED DURING A FIRE ON 17 NOVEMBER 2024 CAUSED BY A SHORTED-OUT MOTOR. | Department Of The Navy | 236220 | $69K | Jun 26, 2025 | Sep 4, 2025 |