Barry Williams Electric INC
UEI JKRFPNDSPCD5 · TX · SAM.gov record ↗
Obligations by agency
- Department Of Transportation$6.5M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- 6973GH25F01328 ↗$25K
DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001334, LOC:MKG RTR, MUSKEGON MI. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT MKG RTR.
- Ends
- Sep 9, 2026
- Started
- Sep 10, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH25F01185 ↗$19K
IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:25019738, LOC:PBF VOR, PINE BLUFF AR. FUNDING FOR BATTERY REPLACEMENT AT PBF VOR.
- Ends
- Sep 10, 2026
- Started
- Aug 3, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH25F01211 ↗$24K
DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23004754, LOC:SRQ VOR, SARASOTA FL. FUNDING FOR BATTERY REPLACEMENT AT SRQ VOR.
- Ends
- Sep 13, 2026
- Started
- Aug 20, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH26F00589 ↗$14K
IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23004822, LOC:OTK VOR, VALDOSTA GA. OTK VOR: IIJA DC SYSTEMS BATTERY. JCN: 23004822, LOC: OTK VOR, VALDOSTA, GA. FUNDING FOR PP1 BATTERY REPLACEMENT AT OTK VOR.
- Ends
- Sep 24, 2026
- Started
- Apr 6, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH26F00896 ↗$200K
OPS FUNDED DEMO AND INSTALL FOR ELECTRICAL REFURBISHMENT PROJECT AT (GJT)ARSR IN GRAND JUNCTION, CO., JCN: 18062203 PER NDP, PMO
- Ends
- Sep 29, 2026
- Started
- Jun 8, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00927 ↗$50K
OPS FUNDED (BGR)ATCT - MDPE, ELECTRICAL POWER REPLACEMENT (MDPE), IN BANGOR, ME, JCN:25015948, PER ES, PMO.
- Ends
- Sep 29, 2026
- Started
- Jun 8, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00386 ↗$25K
DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:21002022, LOC:ELX VOR, KEELER MI. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT ELX DME.
- Ends
- Sep 30, 2026
- Started
- Feb 22, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH26F00115 ↗$22K
DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001382, LOC:BQS VOR, BRAYMER MO. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT BQS VOR.
- Ends
- Oct 7, 2026
- Started
- Dec 2, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH26F00151 ↗$23K
DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001381, LOC:BLV RTR, BELLEVILLE IL. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT BLV RTR.
- Ends
- Oct 8, 2026
- Started
- Dec 4, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH26F00872 ↗$292K
IIJA FUNDED THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT WARRENTON, VA (PCT) TRACON WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY OF THE FACILITY. JCN:18065275
- Ends
- Oct 29, 2026
- Started
- May 25, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 6973GH25F01328 ↗ | DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001334, LOC:MKG RTR, MUSKEGON MI. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT MKG RTR. | Federal Aviation Administration | 335910 | $25K | Sep 10, 2025 | Sep 9, 2026 |
| 6973GH25F01185 ↗ | IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:25019738, LOC:PBF VOR, PINE BLUFF AR. FUNDING FOR BATTERY REPLACEMENT AT PBF VOR. | Federal Aviation Administration | 335910 | $19K | Aug 3, 2025 | Sep 10, 2026 |
| 6973GH25F01211 ↗ | DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23004754, LOC:SRQ VOR, SARASOTA FL. FUNDING FOR BATTERY REPLACEMENT AT SRQ VOR. | Federal Aviation Administration | 335910 | $24K | Aug 20, 2025 | Sep 13, 2026 |
| 6973GH26F00589 ↗ | IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23004822, LOC:OTK VOR, VALDOSTA GA. OTK VOR: IIJA DC SYSTEMS BATTERY. JCN: 23004822, LOC: OTK VOR, VALDOSTA, GA. FUNDING FOR PP1 BATTERY REPLACEMENT AT OTK VOR. | Federal Aviation Administration | 335910 | $14K | Apr 6, 2026 | Sep 24, 2026 |
| 6973GH26F00896 ↗ | OPS FUNDED DEMO AND INSTALL FOR ELECTRICAL REFURBISHMENT PROJECT AT (GJT)ARSR IN GRAND JUNCTION, CO., JCN: 18062203 PER NDP, PMO | Federal Aviation Administration | 238210 | $200K | Jun 8, 2026 | Sep 29, 2026 |
| 6973GH26F00927 ↗ | OPS FUNDED (BGR)ATCT - MDPE, ELECTRICAL POWER REPLACEMENT (MDPE), IN BANGOR, ME, JCN:25015948, PER ES, PMO. | Federal Aviation Administration | 238210 | $50K | Jun 8, 2026 | Sep 29, 2026 |
| 6973GH26F00386 ↗ | DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:21002022, LOC:ELX VOR, KEELER MI. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT ELX DME. | Federal Aviation Administration | 335910 | $25K | Feb 22, 2026 | Sep 30, 2026 |
| 6973GH26F00115 ↗ | DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001382, LOC:BQS VOR, BRAYMER MO. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT BQS VOR. | Federal Aviation Administration | 335910 | $22K | Dec 2, 2025 | Oct 7, 2026 |
| 6973GH26F00151 ↗ | DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:23001381, LOC:BLV RTR, BELLEVILLE IL. FUNDING BWC FOR BATTERY REPLACEMENT PROJECT AT BLV RTR. | Federal Aviation Administration | 335910 | $23K | Dec 4, 2025 | Oct 8, 2026 |
| 6973GH26F00872 ↗ | IIJA FUNDED THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT WARRENTON, VA (PCT) TRACON WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY OF THE FACILITY. JCN:18065275 | Federal Aviation Administration | 238210 | $292K | May 25, 2026 | Oct 29, 2026 |
Largest awards
- 6973GH25F01106 ↗$818K
IIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS INSTALLATION AND FULL POWER SYSTEM STUDY AT OILTON, TX (QZA) ARSR JCN:23007873
- Ends
- Oct 30, 2026
- Started
- Jul 16, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00257 ↗$439K
REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTALL THE ERMS WIRING, UPDATE THE EXISTING UNINTERRUPTED POWER SYSTEM (UPS) WITH AN EATON 93PM-L UPS, MODIFY THE LIGHTNING PROTECTION GROUNDING BONDING SYSTEM (LPGBS), AND CO
- Ends
- Oct 30, 2026
- Started
- Jan 20, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00542 ↗$398K
IIJA FUNDS. EG INSTALL, FULL POWER SYSTEM STUDY AND ERMS FUNDING AT CHELSEA, OK (QAF) ATCBI JCN:23007870
- Ends
- Mar 1, 2027
- Started
- Mar 24, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01839 ↗$344K
BIL FUNDING, ADDITIONAL DESIGNS TO INCORPORATE ADVANCED METERING AT LUBBOCK, TX (LBBC) ATCT JCN: 19003435
- Ends
- Jun 29, 2026
- Started
- Sep 11, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F01432 ↗$312K
TO FUND THE FUEL STORAGE TANK (FST) REPLACEMENT AT LCH ASR.
- Ends
- May 30, 2026
- Started
- Sep 23, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00338 ↗$300K
IIJA FUNDED. NASHWAUK, MN (QJD) ARSR JCN:19004780 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AND ELECTRICAL, LIGHTING, AND SERVICE SUPPLY EQUIPMENT UPGRADE AT NASHWAUK, MN (QJD)
- Ends
- Oct 30, 2026
- Started
- Jan 27, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01699 ↗$294K
IIJA FUNDS. SITE SPECIFIC FUNDING FOR THE OUTDOOR EG WITH SUBBASE TANK INSTALLATION, ERMS INSTALLATION AND FULL POWER SYSTEM STUDIES AT ALBUQUERQUE, NM (ABQF) ASR JCN:22002452
- Ends
- Mar 30, 2026
- Started
- Sep 11, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00872 ↗$292K
IIJA FUNDED THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT WARRENTON, VA (PCT) TRACON WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY OF THE FACILITY. JCN:18065275
- Ends
- Oct 29, 2026
- Started
- May 25, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01650 ↗$209K
IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 175KW INDOOR EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW OUTDOOR WITH SUBBASE EG 277/480V, 3PH IAW THE APPROVED DRAWINGS DATED 1/10/2025 AND THE 2022 125KW EG OUTDOOR BASELINE, ER
- Ends
- Jan 29, 2026
- Started
- Sep 7, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00896 ↗$200K
OPS FUNDED DEMO AND INSTALL FOR ELECTRICAL REFURBISHMENT PROJECT AT (GJT)ARSR IN GRAND JUNCTION, CO., JCN: 18062203 PER NDP, PMO
- Ends
- Sep 29, 2026
- Started
- Jun 8, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01841 ↗$190K
BIL FUNDS. ADDING ADVANCED METERING INTO THE EG DESIGN FOR SALINA, KS (SLNC) ATCT JCN: 19003449
- Ends
- Oct 30, 2026
- Started
- Sep 11, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01709 ↗$187K
IIJA FUNDS. SITE SPECIFIC INSTALLATION, ERMS AND POWER SYSTEMS STUDIES FOR SAN ANTONIO, TX (ANT) ALS JCN:22002701
- Ends
- Sep 29, 2025
- Started
- Sep 11, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01655 ↗$164K
BIL FUNDING, SITE SPECIFIC COSTS FOR THE 100KW EG INSTALLATION, ERMS INSTALL, UPGRADE TO A FULL POWER SYSTEM STUDY AND THE INSTALLATION OF THE ADVANCED METERING AT LONGVIEW, TX (GGGA) ATCT. JCN:22001757
- Ends
- Sep 29, 2025
- Started
- Sep 7, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01641 ↗$146K
SITE SPECIFIC INSTALLATION COST REQUIREMENTS, INCLUDING THE REMOVAL OF THE EXISTING 1,000-GALLON ABOVEGROUND STORAGE TANK (AST), ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, AND DEMOLITION OF THE EXISTING CONCRETE
- Ends
- Aug 16, 2026
- Started
- Aug 8, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00237 ↗$137K
FST 2024 DC BUS DEMO BASELINE SITE SURVEY TRAVEL & REPORT, DESIGN AND INSTALL FUNDING AT GAGE, OK (GAGA) RCAG JCN:24016524
- Ends
- Oct 29, 2026
- Started
- Jan 5, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00244 ↗$137K
FST FUNDED. 2024 DC BUS DEMO BASELINE SCOPE: SITE SURVEY TRAVEL AND REPORT, DESIGN AND INSTALL FUNDING AT LYNCHBURG, VA (LYHA) RCAG JCN:24016521
- Ends
- May 29, 2026
- Started
- Jan 5, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00246 ↗$137K
FST FUNDS. 2024 DC BUS DEMO BASELINE SCOPE: SITE SURVEY TRAVEL AND REPORT, DESIGN AND INSTALL FUNDING AT CEDAR RAPIDS, IA (CID) RCAG JCN: 24016529
- Ends
- Oct 30, 2026
- Started
- Jan 11, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F01253 ↗$125K
IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:25016040 & LOC:QSJ RCLR, JCN:25015952 & LOC:QXW RCLR, JCN:25016042 & LOC:QSG RCLR, JCN:25016039 & LOC:QLH RCLR, JCN:25016041 & LOC:QSK.
- Ends
- Aug 3, 2026
- Started
- Aug 25, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 335910
- 6973GH25F00044 ↗$108K
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE TEXARKANA, AR (TXK) ARSR PER THE RFQ-24-24 (AR1) BID PACKAGE. JCN: 18066399 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILIT
- Ends
- Feb 10, 2026
- Started
- Nov 11, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00280 ↗$102K
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE FAYETTEVILLE (FYV) ASR (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 21000078 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY.
- Ends
- Jul 10, 2025
- Started
- Jan 12, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00307 ↗$98K
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE AMARILLO, TX (AMA) ASR PER THE RFQ-25-03 BID PACKAGE. JCN: 18066403 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY.
- Ends
- Feb 26, 2026
- Started
- Dec 22, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00278 ↗$89K
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LITC) ATCT (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 18065822 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACI
- Ends
- Jun 8, 2025
- Started
- Jan 12, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00670 ↗$85K
IIJA FUNDED. CORPUS CHRISTI, TX (CRPA) ASR JCN:18066426 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT CORPUS CHRISTI, TX (CRPA) ASR WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY
- Ends
- Oct 30, 2026
- Started
- Apr 27, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00279 ↗$81K
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LIT) ASR (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 19004777 INCLUDES OPTION #1 PARTIAL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FAC
- Ends
- Jun 8, 2025
- Started
- Jan 12, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00043 ↗$77K
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE FORT SMITH, AR (FSM) ASR PER THE RFQ-24-24 (AR1) BID PACKAGE. JCN: 18065318 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILIT
- Ends
- Apr 29, 2025
- Started
- Nov 11, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 6973GH25F01106 ↗ | IIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS INSTALLATION AND FULL POWER SYSTEM STUDY AT OILTON, TX (QZA) ARSR JCN:23007873 | Federal Aviation Administration | 238210 | $818K | Jul 16, 2025 | Oct 30, 2026 |
| 6973GH26F00257 ↗ | REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTALL THE ERMS WIRING, UPDATE THE EXISTING UNINTERRUPTED POWER SYSTEM (UPS) WITH AN EATON 93PM-L UPS, MODIFY THE LIGHTNING PROTECTION GROUNDING BONDING SYSTEM (LPGBS), AND CO | Federal Aviation Administration | 238210 | $439K | Jan 20, 2026 | Oct 30, 2026 |
| 6973GH26F00542 ↗ | IIJA FUNDS. EG INSTALL, FULL POWER SYSTEM STUDY AND ERMS FUNDING AT CHELSEA, OK (QAF) ATCBI JCN:23007870 | Federal Aviation Administration | 238210 | $398K | Mar 24, 2026 | Mar 1, 2027 |
| 6973GH23F01839 ↗ | BIL FUNDING, ADDITIONAL DESIGNS TO INCORPORATE ADVANCED METERING AT LUBBOCK, TX (LBBC) ATCT JCN: 19003435 | Federal Aviation Administration | 238210 | $344K | Sep 11, 2023 | Jun 29, 2026 |
| 6973GH25F01432 ↗ | TO FUND THE FUEL STORAGE TANK (FST) REPLACEMENT AT LCH ASR. | Federal Aviation Administration | 238210 | $312K | Sep 23, 2025 | May 30, 2026 |
| 6973GH26F00338 ↗ | IIJA FUNDED. NASHWAUK, MN (QJD) ARSR JCN:19004780 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AND ELECTRICAL, LIGHTING, AND SERVICE SUPPLY EQUIPMENT UPGRADE AT NASHWAUK, MN (QJD) | Federal Aviation Administration | 238210 | $300K | Jan 27, 2026 | Oct 30, 2026 |
| 6973GH22F01699 ↗ | IIJA FUNDS. SITE SPECIFIC FUNDING FOR THE OUTDOOR EG WITH SUBBASE TANK INSTALLATION, ERMS INSTALLATION AND FULL POWER SYSTEM STUDIES AT ALBUQUERQUE, NM (ABQF) ASR JCN:22002452 | Federal Aviation Administration | 238210 | $294K | Sep 11, 2022 | Mar 30, 2026 |
| 6973GH26F00872 ↗ | IIJA FUNDED THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT WARRENTON, VA (PCT) TRACON WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY OF THE FACILITY. JCN:18065275 | Federal Aviation Administration | 238210 | $292K | May 25, 2026 | Oct 29, 2026 |
| 6973GH22F01650 ↗ | IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 175KW INDOOR EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW OUTDOOR WITH SUBBASE EG 277/480V, 3PH IAW THE APPROVED DRAWINGS DATED 1/10/2025 AND THE 2022 125KW EG OUTDOOR BASELINE, ER | Federal Aviation Administration | 238210 | $209K | Sep 7, 2022 | Jan 29, 2026 |
| 6973GH26F00896 ↗ | OPS FUNDED DEMO AND INSTALL FOR ELECTRICAL REFURBISHMENT PROJECT AT (GJT)ARSR IN GRAND JUNCTION, CO., JCN: 18062203 PER NDP, PMO | Federal Aviation Administration | 238210 | $200K | Jun 8, 2026 | Sep 29, 2026 |
| 6973GH23F01841 ↗ | BIL FUNDS. ADDING ADVANCED METERING INTO THE EG DESIGN FOR SALINA, KS (SLNC) ATCT JCN: 19003449 | Federal Aviation Administration | 238210 | $190K | Sep 11, 2023 | Oct 30, 2026 |
| 6973GH22F01709 ↗ | IIJA FUNDS. SITE SPECIFIC INSTALLATION, ERMS AND POWER SYSTEMS STUDIES FOR SAN ANTONIO, TX (ANT) ALS JCN:22002701 | Federal Aviation Administration | 238210 | $187K | Sep 11, 2022 | Sep 29, 2025 |
| 6973GH22F01655 ↗ | BIL FUNDING, SITE SPECIFIC COSTS FOR THE 100KW EG INSTALLATION, ERMS INSTALL, UPGRADE TO A FULL POWER SYSTEM STUDY AND THE INSTALLATION OF THE ADVANCED METERING AT LONGVIEW, TX (GGGA) ATCT. JCN:22001757 | Federal Aviation Administration | 238210 | $164K | Sep 7, 2022 | Sep 29, 2025 |
| 6973GH23F01641 ↗ | SITE SPECIFIC INSTALLATION COST REQUIREMENTS, INCLUDING THE REMOVAL OF THE EXISTING 1,000-GALLON ABOVEGROUND STORAGE TANK (AST), ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, AND DEMOLITION OF THE EXISTING CONCRETE | Federal Aviation Administration | 238210 | $146K | Aug 8, 2023 | Aug 16, 2026 |
| 6973GH26F00237 ↗ | FST 2024 DC BUS DEMO BASELINE SITE SURVEY TRAVEL & REPORT, DESIGN AND INSTALL FUNDING AT GAGE, OK (GAGA) RCAG JCN:24016524 | Federal Aviation Administration | 238210 | $137K | Jan 5, 2026 | Oct 29, 2026 |
| 6973GH26F00244 ↗ | FST FUNDED. 2024 DC BUS DEMO BASELINE SCOPE: SITE SURVEY TRAVEL AND REPORT, DESIGN AND INSTALL FUNDING AT LYNCHBURG, VA (LYHA) RCAG JCN:24016521 | Federal Aviation Administration | 238210 | $137K | Jan 5, 2026 | May 29, 2026 |
| 6973GH26F00246 ↗ | FST FUNDS. 2024 DC BUS DEMO BASELINE SCOPE: SITE SURVEY TRAVEL AND REPORT, DESIGN AND INSTALL FUNDING AT CEDAR RAPIDS, IA (CID) RCAG JCN: 24016529 | Federal Aviation Administration | 238210 | $137K | Jan 11, 2026 | Oct 30, 2026 |
| 6973GH25F01253 ↗ | IIJA DC SYSTEMS BATTERY EQUIPMENT PURCHASE AND INSTALLATION. JCN:25016040 & LOC:QSJ RCLR, JCN:25015952 & LOC:QXW RCLR, JCN:25016042 & LOC:QSG RCLR, JCN:25016039 & LOC:QLH RCLR, JCN:25016041 & LOC:QSK. | Federal Aviation Administration | 335910 | $125K | Aug 25, 2025 | Aug 3, 2026 |
| 6973GH25F00044 ↗ | BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE TEXARKANA, AR (TXK) ARSR PER THE RFQ-24-24 (AR1) BID PACKAGE. JCN: 18066399 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILIT | Federal Aviation Administration | 238210 | $108K | Nov 11, 2024 | Feb 10, 2026 |
| 6973GH25F00280 ↗ | BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE FAYETTEVILLE (FYV) ASR (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 21000078 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY. | Federal Aviation Administration | 238210 | $102K | Jan 12, 2025 | Jul 10, 2025 |
| 6973GH25F00307 ↗ | BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE AMARILLO, TX (AMA) ASR PER THE RFQ-25-03 BID PACKAGE. JCN: 18066403 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY. | Federal Aviation Administration | 238210 | $98K | Dec 22, 2024 | Feb 26, 2026 |
| 6973GH25F00278 ↗ | BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LITC) ATCT (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 18065822 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACI | Federal Aviation Administration | 238210 | $89K | Jan 12, 2025 | Jun 8, 2025 |
| 6973GH26F00670 ↗ | IIJA FUNDED. CORPUS CHRISTI, TX (CRPA) ASR JCN:18066426 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT CORPUS CHRISTI, TX (CRPA) ASR WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY | Federal Aviation Administration | 238210 | $85K | Apr 27, 2026 | Oct 30, 2026 |
| 6973GH25F00279 ↗ | BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE LITTLE ROCK, AR (LIT) ASR (AR2) PER THE RFQ-25-02 BID PACKAGE. JCN: 19004777 INCLUDES OPTION #1 PARTIAL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FAC | Federal Aviation Administration | 238210 | $81K | Jan 12, 2025 | Jun 8, 2025 |
| 6973GH25F00043 ↗ | BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE FORT SMITH, AR (FSM) ASR PER THE RFQ-24-24 (AR1) BID PACKAGE. JCN: 18065318 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILIT | Federal Aviation Administration | 238210 | $77K | Nov 11, 2024 | Apr 29, 2025 |