Obligations by agency
- Department Of Health And Human Services$43.8M
- Department Of Defense$18.6M
- General Services Administration$6.2M
- Department Of Agriculture$278K
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- 47PJ0024C0050 ↗$259K
MODIFICATION PS0001 IS ISSUED TO ADD FUNDING FOR THE OPTION II FOR THE WORK TO BE COMPLETED AT BUILDING 710 FOR SOIL EROSION CONTROL AT THE DENVER FEDERAL CENTER IN LAKEWOOD, COLORADO.
- Ends
- Dec 8, 2026
- Started
- Sep 14, 2024
- Agency
- Public Buildings Service
- NAICS
- 236220
C116742 - BLDG 35 REPAIR & REPLACE DEFECTIVE CIRCUIT BREAKER - NO COST TIME EXTENSION (NCTE) TO 12/31/2025
- Ends
- Dec 29, 2026
- Started
- Jul 22, 2024
- Agency
- National Institutes Of Health
- NAICS
- 236220
C116086 - BUILDING 63 MANUFACTURER MAINTENANCE TESTING AND REPAIR OF THREE TRANSFORMERS
- Ends
- Dec 29, 2026
- Started
- Feb 25, 2024
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 75N99026F00004 ↗$466K
C115176 - OY2 FUNDING - 1 MONTH - PROVIDE SERVICES INCLUDING EVALUATION, PREVENTATIVE MAINTENANCE, REPAIR, REPLACEMENT AND CONSTRUCTION WORK SERVICES FOR ALL ASEPTIC PROCESSING FACILITIES (APF) FACILITIES
- Ends
- Dec 30, 2026
- Started
- Dec 31, 2025
- Agency
- National Institutes Of Health
- NAICS
- 238220
- FA487725F0251 ↗$517K
THIS PROJECT WILL CONSIST OF THE FIELD INVESTIGATION, DESIGN, PLANS, SPECIFICATIONS, INSTALLATION, AND TESTING IN CONNECTION WITH THE REPLACE FIRE ALARM PANELS PROJECT IN BLDG 12 AT DAVIS-MONTHAN AFB, ARIZONA.
- Ends
- Jan 15, 2027
- Started
- Jul 31, 2025
- Agency
- Department Of The Air Force
- NAICS
- 236220
- 75N99023C00057 ↗$833K
C104040- DESIGN-BUILD SERVICES B11 COOLING TOWER FAN MOTOR AND VFD REPLACEMENT- THE OBJECTIVE IS TO REPLACE TWELVE (12) COOLING TOWER FAN MOTORS AND ASSOCIATED VARIABLE FREQUENCY DRIVES (VFDS).
- Ends
- Jan 22, 2027
- Started
- Sep 20, 2023
- Agency
- National Institutes Of Health
- NAICS
- 236220
- FA487726F0135 ↗$423K
EOL SPRINKLER REPLACEMENT BLDGS: 4224, 3750, 5029, 304, 4824, AND 79 .
- Ends
- Jan 27, 2027
- Started
- Apr 22, 2026
- Agency
- Department Of The Air Force
- NAICS
- 236220
- 75N99025F00014 ↗$1.1M
C201002-PROJECT TO CREATE TRAINING MATERIALS FOR CUP. BASE DEVELOPS SOTMS, SOPS, TRAINING MATERIAL, AND CLASSROOM TRAINING FOR BOILER PLANT COR: CASEY HUGHES CO: CHRIS POSTEK KTR: DAVE FREDERICK
- Ends
- Feb 1, 2027
- Started
- Aug 4, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 75N99024C00036 ↗$5.8M
C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP FROM 5/31/25 TO 12/31/25 AT NO COST TO THE GOVERNMENT. CS: BRAD ARENSDORF CO: ZACH PRICE COR: CASEY HUGHES
- Ends
- Feb 27, 2027
- Started
- May 31, 2024
- Agency
- National Institutes Of Health
- NAICS
- 236210
- 75N99025C00034 ↗$3.5M
GROUNDWATER INTRUSION REPAIRS AT BLDG 11 CO: CHRIS POSTEK COR: VANESSA ARGOTE MACIA CONTRACTOR: DAVE FREDERICK
- Ends
- Feb 28, 2027
- Started
- Sep 28, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 47PJ0024C0050 ↗ | MODIFICATION PS0001 IS ISSUED TO ADD FUNDING FOR THE OPTION II FOR THE WORK TO BE COMPLETED AT BUILDING 710 FOR SOIL EROSION CONTROL AT THE DENVER FEDERAL CENTER IN LAKEWOOD, COLORADO. | Public Buildings Service | 236220 | $259K | Sep 14, 2024 | Dec 8, 2026 |
| 75N99024C00040 ↗ | C116742 - BLDG 35 REPAIR & REPLACE DEFECTIVE CIRCUIT BREAKER - NO COST TIME EXTENSION (NCTE) TO 12/31/2025 | National Institutes Of Health | 236220 | $0 | Jul 22, 2024 | Dec 29, 2026 |
| 75N99024C00003 ↗ | C116086 - BUILDING 63 MANUFACTURER MAINTENANCE TESTING AND REPAIR OF THREE TRANSFORMERS | National Institutes Of Health | 236220 | $0 | Feb 25, 2024 | Dec 29, 2026 |
| 75N99026F00004 ↗ | C115176 - OY2 FUNDING - 1 MONTH - PROVIDE SERVICES INCLUDING EVALUATION, PREVENTATIVE MAINTENANCE, REPAIR, REPLACEMENT AND CONSTRUCTION WORK SERVICES FOR ALL ASEPTIC PROCESSING FACILITIES (APF) FACILITIES | National Institutes Of Health | 238220 | $466K | Dec 31, 2025 | Dec 30, 2026 |
| FA487725F0251 ↗ | THIS PROJECT WILL CONSIST OF THE FIELD INVESTIGATION, DESIGN, PLANS, SPECIFICATIONS, INSTALLATION, AND TESTING IN CONNECTION WITH THE REPLACE FIRE ALARM PANELS PROJECT IN BLDG 12 AT DAVIS-MONTHAN AFB, ARIZONA. | Department Of The Air Force | 236220 | $517K | Jul 31, 2025 | Jan 15, 2027 |
| 75N99023C00057 ↗ | C104040- DESIGN-BUILD SERVICES B11 COOLING TOWER FAN MOTOR AND VFD REPLACEMENT- THE OBJECTIVE IS TO REPLACE TWELVE (12) COOLING TOWER FAN MOTORS AND ASSOCIATED VARIABLE FREQUENCY DRIVES (VFDS). | National Institutes Of Health | 236220 | $833K | Sep 20, 2023 | Jan 22, 2027 |
| FA487726F0135 ↗ | EOL SPRINKLER REPLACEMENT BLDGS: 4224, 3750, 5029, 304, 4824, AND 79 . | Department Of The Air Force | 236220 | $423K | Apr 22, 2026 | Jan 27, 2027 |
| 75N99025F00014 ↗ | C201002-PROJECT TO CREATE TRAINING MATERIALS FOR CUP. BASE DEVELOPS SOTMS, SOPS, TRAINING MATERIAL, AND CLASSROOM TRAINING FOR BOILER PLANT COR: CASEY HUGHES CO: CHRIS POSTEK KTR: DAVE FREDERICK | National Institutes Of Health | 236220 | $1.1M | Aug 4, 2025 | Feb 1, 2027 |
| 75N99024C00036 ↗ | C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP FROM 5/31/25 TO 12/31/25 AT NO COST TO THE GOVERNMENT. CS: BRAD ARENSDORF CO: ZACH PRICE COR: CASEY HUGHES | National Institutes Of Health | 236210 | $5.8M | May 31, 2024 | Feb 27, 2027 |
| 75N99025C00034 ↗ | GROUNDWATER INTRUSION REPAIRS AT BLDG 11 CO: CHRIS POSTEK COR: VANESSA ARGOTE MACIA CONTRACTOR: DAVE FREDERICK | National Institutes Of Health | 236220 | $3.5M | Sep 28, 2025 | Feb 28, 2027 |
Largest awards
- 75N99025C00024 ↗$6.6M
C115971-BUILDING 49 REPLACEMENT OF REHEAT WATER PIPING & ASSOCIATED COMPONENTS PROJECT - PHASES III
- Ends
- Aug 26, 2026
- Started
- Aug 31, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 75N99024C00036 ↗$5.8M
C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP FROM 5/31/25 TO 12/31/25 AT NO COST TO THE GOVERNMENT. CS: BRAD ARENSDORF CO: ZACH PRICE COR: CASEY HUGHES
- Ends
- Feb 27, 2027
- Started
- May 31, 2024
- Agency
- National Institutes Of Health
- NAICS
- 236210
- 75N99025F00015 ↗$5.0M
ANNUAL PREVENTIVE MAINTENANCE FOR THE CENTRAL UTILITY PLANT CHILLERS, COOLING TOWERS, CHILLER PLANT GAS DETECTION, AND CHILLER PLANT MEDIUM & LOW VOLTAGE VFD INSPECTIONS COR: ELIZABETH OLUWAFEMI CO: CHRIS POSTEK KTR: DAVID FREDERICK
- Ends
- Sep 2, 2026
- Started
- Sep 3, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
- FA487725F0250 ↗$4.6M
RENOVATE B1550 FOR WBS FOR 34 WPS 88 TES 355 AMXS BEDDOWN
- Ends
- Jun 5, 2026
- Started
- Aug 7, 2025
- Agency
- Department Of The Air Force
- NAICS
- 236220
- 75N99025C00034 ↗$3.5M
GROUNDWATER INTRUSION REPAIRS AT BLDG 11 CO: CHRIS POSTEK COR: VANESSA ARGOTE MACIA CONTRACTOR: DAVE FREDERICK
- Ends
- Feb 28, 2027
- Started
- Sep 28, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 75N99026C00004 ↗$3.4M
C201732 FEEDER 7 REPLACEMENT - CONTRACT AWARD IS CRITICAL TO NHI MAIN CAMPUS OPERATIONS TO SUPPORT ELECTRICAL INFRASTRUCTURE.
- Ends
- Oct 18, 2026
- Started
- Apr 21, 2026
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 75N99024C00026 ↗$2.7M
C108104 - BLDG 11, CUP, COOLING TOWER DECKING REPLACEMENT COR: ELIZABETH OLUWAFEMI CO: CHRIS POSTEK KTR: DAVID FREDERICK
- Ends
- Jul 8, 2027
- Started
- Jun 17, 2024
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 47PJ0025C0036 ↗$2.7M
B710 FEMA GENERATOR REPLACEMENT D-B, DENVER FEDERAL CENTER, LAKEWOOD, CO
- Ends
- Aug 31, 2027
- Started
- Sep 29, 2025
- Agency
- Public Buildings Service
- NAICS
- 236220
- 75N99025C00037 ↗$2.1M
C116084 REPAIR TWO TRANSFORMERS, TEST 45 BREAKERS AND INSTALL METER ISOLATION POINT
- Ends
- Sep 13, 2026
- Started
- Sep 14, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
- FA487725F0249 ↗$2.0M
REPAIR OF B1634 492ND SOW WRM AND 355TH MDG
- Ends
- Jul 23, 2026
- Started
- Aug 7, 2025
- Agency
- Department Of The Air Force
- NAICS
- 236220
- 75N99025C00011 ↗$2.0M
C201181 CHILLER 21 REPAIRS DESIGN-BUILD
- Ends
- Oct 17, 2026
- Started
- Jun 4, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 75N99023C00048 ↗$1.7M
C115298 - CUP CHILLER REPAIRS 2023-2024. CS: BRAD ARENSDORF CO: ZACH PRICE COR: ELIZABETH OLUWAFEMI
- Ends
- Jul 28, 2026
- Started
- Sep 17, 2023
- Agency
- National Institutes Of Health
- NAICS
- 238220
- W9127S26FA045 ↗$1.4M
SITE PREPARATION FOR TEMPORARY BUILDING, UCIC-MCX COMPOUND, TANEY COUNTY, MISSOURI. ALL SHALL BE COMPLETE WITHIN SIXTY (60) CALENDAR DAYS OF RECEIPT OF NOTICE TO PROCEED.
- Ends
- Apr 29, 2026
- Started
- Feb 28, 2026
- Agency
- Department Of The Army
- NAICS
- 237990
- 75N99025F00014 ↗$1.1M
C201002-PROJECT TO CREATE TRAINING MATERIALS FOR CUP. BASE DEVELOPS SOTMS, SOPS, TRAINING MATERIAL, AND CLASSROOM TRAINING FOR BOILER PLANT COR: CASEY HUGHES CO: CHRIS POSTEK KTR: DAVE FREDERICK
- Ends
- Feb 1, 2027
- Started
- Aug 4, 2025
- Agency
- National Institutes Of Health
- NAICS
- 236220
- 47PJ0025C0031 ↗$1.1M
DEMO AND REPLACE ALL VALVES, FITTINGS, FLANGES, AND PUMPS IDENTIFIED BY AE STUDY, WITH THE EXCEPTION OF THOSE ASSOCIATED WITH THE CHILLED BEAM WATER SUPPLY SYSTEM AT THE BYRON ROGERS FOB, 1961 STOUT STREET DENVER, CO 80294-1961
- Ends
- Oct 21, 2026
- Started
- Sep 2, 2025
- Agency
- Public Buildings Service
- NAICS
- 236220
- 47PJ0025C0015 ↗$973K
THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL ASPECTS OF DESIGN AND CONSTRUCTION TO COMPLETE THE PROJECT OBJECTIVES. ALL REQUIRED ARCHITECT AND ENGINEERING (A/E) SERVICES ARE TO BE PROVIDED BY A STATE-LICENSED A/E
- Ends
- Sep 4, 2026
- Started
- Sep 29, 2025
- Agency
- Public Buildings Service
- NAICS
- 236220
- 75N99023C00080 ↗$922K
C100114 BLDG. 6 AQUATICS FACILITY PUMP UPGRADES PHASE II. CHANGE ORDER #5 COR: EARL JOHNSON
- Ends
- Apr 29, 2026
- Started
- Oct 1, 2023
- Agency
- National Institutes Of Health
- NAICS
- 238220
- W912DQ26CA005 ↗$894K
THIS PROJECT CONSISTS OF PROVIDING ALL LABOR, EQUIPMENT, AND MATERIAL TO REPAIR METAL OF PT BUILDING 6026, TA 106, LOCATED AT 6839 INDIANA AVE FORT LEONARD WOOD, MO.
- Ends
- Aug 24, 2026
- Started
- Nov 27, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W912DQ26CA006 ↗$879K
THIS PROJECT CONSISTS OF PROVIDING ALL LABOR, EQUIPMENT, AND MATERIAL TO REPAIR METAL OF PT BUILDING 767, TA 108, LOCATED ON FORT LEONARD WOOD, MO.
- Ends
- Aug 24, 2026
- Started
- Nov 27, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- FA487725F0152 ↗$875K
THE PURPOSE OF THIS DESIGN BUILD EFFORT IS TO PROVIDE ALL FIELD INVESTIGATION, DESIGN, LABOR, MATERIALS AND SUPERVISION NECESSARY TO COMPLETE REPAIR OF THE ENGINE SHOP AT DAVIS MONTHAN AIR FORCE BASE, BUILDING 5230 IN ACCORDANCE WITH THE SOW.
- Ends
- Jul 19, 2026
- Started
- Apr 17, 2025
- Agency
- Department Of The Air Force
- NAICS
- 236220
- 75N99024C00051 ↗$853K
C115877 REPLACE BUILDING 35 4TH FLOOR HVAC HYDRONICS - SUPPLEMENTAL WORK WITHIN SCOPE PER CO#1 SOW DATED 5/14/2025 - BRIAN WEINMEISTER
- Ends
- Jun 29, 2026
- Started
- Sep 2, 2024
- Agency
- National Institutes Of Health
- NAICS
- 236220
- W912DQ25CA023 ↗$847K
CONSTRUCT PHYSICAL TRAINING (PT) PIT #815
- Ends
- Jul 27, 2026
- Started
- Sep 30, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W912DQ25CA019 ↗$837K
CONSTRUCT PT PIT BUILDING 757
- Ends
- Jul 27, 2026
- Started
- Sep 30, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- 75N99023C00057 ↗$833K
C104040- DESIGN-BUILD SERVICES B11 COOLING TOWER FAN MOTOR AND VFD REPLACEMENT- THE OBJECTIVE IS TO REPLACE TWELVE (12) COOLING TOWER FAN MOTORS AND ASSOCIATED VARIABLE FREQUENCY DRIVES (VFDS).
- Ends
- Jan 22, 2027
- Started
- Sep 20, 2023
- Agency
- National Institutes Of Health
- NAICS
- 236220
- W912DQ25CA017 ↗$792K
CONSTRUCT PHYSICAL TRAINING (PT) PIT #819
- Ends
- Jul 27, 2026
- Started
- Sep 30, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 75N99025C00024 ↗ | C115971-BUILDING 49 REPLACEMENT OF REHEAT WATER PIPING & ASSOCIATED COMPONENTS PROJECT - PHASES III | National Institutes Of Health | 236220 | $6.6M | Aug 31, 2025 | Aug 26, 2026 |
| 75N99024C00036 ↗ | C116280 DESIGN BUILD FOR REPLACEMENT OF CHILLER PLANT VALVES THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP FROM 5/31/25 TO 12/31/25 AT NO COST TO THE GOVERNMENT. CS: BRAD ARENSDORF CO: ZACH PRICE COR: CASEY HUGHES | National Institutes Of Health | 236210 | $5.8M | May 31, 2024 | Feb 27, 2027 |
| 75N99025F00015 ↗ | ANNUAL PREVENTIVE MAINTENANCE FOR THE CENTRAL UTILITY PLANT CHILLERS, COOLING TOWERS, CHILLER PLANT GAS DETECTION, AND CHILLER PLANT MEDIUM & LOW VOLTAGE VFD INSPECTIONS COR: ELIZABETH OLUWAFEMI CO: CHRIS POSTEK KTR: DAVID FREDERICK | National Institutes Of Health | 236220 | $5.0M | Sep 3, 2025 | Sep 2, 2026 |
| FA487725F0250 ↗ | RENOVATE B1550 FOR WBS FOR 34 WPS 88 TES 355 AMXS BEDDOWN | Department Of The Air Force | 236220 | $4.6M | Aug 7, 2025 | Jun 5, 2026 |
| 75N99025C00034 ↗ | GROUNDWATER INTRUSION REPAIRS AT BLDG 11 CO: CHRIS POSTEK COR: VANESSA ARGOTE MACIA CONTRACTOR: DAVE FREDERICK | National Institutes Of Health | 236220 | $3.5M | Sep 28, 2025 | Feb 28, 2027 |
| 75N99026C00004 ↗ | C201732 FEEDER 7 REPLACEMENT - CONTRACT AWARD IS CRITICAL TO NHI MAIN CAMPUS OPERATIONS TO SUPPORT ELECTRICAL INFRASTRUCTURE. | National Institutes Of Health | 236220 | $3.4M | Apr 21, 2026 | Oct 18, 2026 |
| 75N99024C00026 ↗ | C108104 - BLDG 11, CUP, COOLING TOWER DECKING REPLACEMENT COR: ELIZABETH OLUWAFEMI CO: CHRIS POSTEK KTR: DAVID FREDERICK | National Institutes Of Health | 236220 | $2.7M | Jun 17, 2024 | Jul 8, 2027 |
| 47PJ0025C0036 ↗ | B710 FEMA GENERATOR REPLACEMENT D-B, DENVER FEDERAL CENTER, LAKEWOOD, CO | Public Buildings Service | 236220 | $2.7M | Sep 29, 2025 | Aug 31, 2027 |
| 75N99025C00037 ↗ | C116084 REPAIR TWO TRANSFORMERS, TEST 45 BREAKERS AND INSTALL METER ISOLATION POINT | National Institutes Of Health | 236220 | $2.1M | Sep 14, 2025 | Sep 13, 2026 |
| FA487725F0249 ↗ | REPAIR OF B1634 492ND SOW WRM AND 355TH MDG | Department Of The Air Force | 236220 | $2.0M | Aug 7, 2025 | Jul 23, 2026 |
| 75N99025C00011 ↗ | C201181 CHILLER 21 REPAIRS DESIGN-BUILD | National Institutes Of Health | 236220 | $2.0M | Jun 4, 2025 | Oct 17, 2026 |
| 75N99023C00048 ↗ | C115298 - CUP CHILLER REPAIRS 2023-2024. CS: BRAD ARENSDORF CO: ZACH PRICE COR: ELIZABETH OLUWAFEMI | National Institutes Of Health | 238220 | $1.7M | Sep 17, 2023 | Jul 28, 2026 |
| W9127S26FA045 ↗ | SITE PREPARATION FOR TEMPORARY BUILDING, UCIC-MCX COMPOUND, TANEY COUNTY, MISSOURI. ALL SHALL BE COMPLETE WITHIN SIXTY (60) CALENDAR DAYS OF RECEIPT OF NOTICE TO PROCEED. | Department Of The Army | 237990 | $1.4M | Feb 28, 2026 | Apr 29, 2026 |
| 75N99025F00014 ↗ | C201002-PROJECT TO CREATE TRAINING MATERIALS FOR CUP. BASE DEVELOPS SOTMS, SOPS, TRAINING MATERIAL, AND CLASSROOM TRAINING FOR BOILER PLANT COR: CASEY HUGHES CO: CHRIS POSTEK KTR: DAVE FREDERICK | National Institutes Of Health | 236220 | $1.1M | Aug 4, 2025 | Feb 1, 2027 |
| 47PJ0025C0031 ↗ | DEMO AND REPLACE ALL VALVES, FITTINGS, FLANGES, AND PUMPS IDENTIFIED BY AE STUDY, WITH THE EXCEPTION OF THOSE ASSOCIATED WITH THE CHILLED BEAM WATER SUPPLY SYSTEM AT THE BYRON ROGERS FOB, 1961 STOUT STREET DENVER, CO 80294-1961 | Public Buildings Service | 236220 | $1.1M | Sep 2, 2025 | Oct 21, 2026 |
| 47PJ0025C0015 ↗ | THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL ASPECTS OF DESIGN AND CONSTRUCTION TO COMPLETE THE PROJECT OBJECTIVES. ALL REQUIRED ARCHITECT AND ENGINEERING (A/E) SERVICES ARE TO BE PROVIDED BY A STATE-LICENSED A/E | Public Buildings Service | 236220 | $973K | Sep 29, 2025 | Sep 4, 2026 |
| 75N99023C00080 ↗ | C100114 BLDG. 6 AQUATICS FACILITY PUMP UPGRADES PHASE II. CHANGE ORDER #5 COR: EARL JOHNSON | National Institutes Of Health | 238220 | $922K | Oct 1, 2023 | Apr 29, 2026 |
| W912DQ26CA005 ↗ | THIS PROJECT CONSISTS OF PROVIDING ALL LABOR, EQUIPMENT, AND MATERIAL TO REPAIR METAL OF PT BUILDING 6026, TA 106, LOCATED AT 6839 INDIANA AVE FORT LEONARD WOOD, MO. | Department Of The Army | 236220 | $894K | Nov 27, 2025 | Aug 24, 2026 |
| W912DQ26CA006 ↗ | THIS PROJECT CONSISTS OF PROVIDING ALL LABOR, EQUIPMENT, AND MATERIAL TO REPAIR METAL OF PT BUILDING 767, TA 108, LOCATED ON FORT LEONARD WOOD, MO. | Department Of The Army | 236220 | $879K | Nov 27, 2025 | Aug 24, 2026 |
| FA487725F0152 ↗ | THE PURPOSE OF THIS DESIGN BUILD EFFORT IS TO PROVIDE ALL FIELD INVESTIGATION, DESIGN, LABOR, MATERIALS AND SUPERVISION NECESSARY TO COMPLETE REPAIR OF THE ENGINE SHOP AT DAVIS MONTHAN AIR FORCE BASE, BUILDING 5230 IN ACCORDANCE WITH THE SOW. | Department Of The Air Force | 236220 | $875K | Apr 17, 2025 | Jul 19, 2026 |
| 75N99024C00051 ↗ | C115877 REPLACE BUILDING 35 4TH FLOOR HVAC HYDRONICS - SUPPLEMENTAL WORK WITHIN SCOPE PER CO#1 SOW DATED 5/14/2025 - BRIAN WEINMEISTER | National Institutes Of Health | 236220 | $853K | Sep 2, 2024 | Jun 29, 2026 |
| W912DQ25CA023 ↗ | CONSTRUCT PHYSICAL TRAINING (PT) PIT #815 | Department Of The Army | 236220 | $847K | Sep 30, 2025 | Jul 27, 2026 |
| W912DQ25CA019 ↗ | CONSTRUCT PT PIT BUILDING 757 | Department Of The Army | 236220 | $837K | Sep 30, 2025 | Jul 27, 2026 |
| 75N99023C00057 ↗ | C104040- DESIGN-BUILD SERVICES B11 COOLING TOWER FAN MOTOR AND VFD REPLACEMENT- THE OBJECTIVE IS TO REPLACE TWELVE (12) COOLING TOWER FAN MOTORS AND ASSOCIATED VARIABLE FREQUENCY DRIVES (VFDS). | National Institutes Of Health | 236220 | $833K | Sep 20, 2023 | Jan 22, 2027 |
| W912DQ25CA017 ↗ | CONSTRUCT PHYSICAL TRAINING (PT) PIT #819 | Department Of The Army | 236220 | $792K | Sep 30, 2025 | Jul 27, 2026 |
Subsidiaries under this parent
- Olgoonik Innovations, LLC ($21.5M)
- Olgoonik Specialty Contractors LLC ($3.5M)