Stone Ridge Construction, INC
UEI JY11MP8CNKD1 · ID · SAM.gov record ↗
Obligations by agency
- Department Of Agriculture$5.0M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- 12363N25F4140 ↗$144K
WASHOUT ROAD REPAIR
- Ends
- Nov 14, 2026
- Started
- Aug 31, 2025
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0003 ↗$1.0M
STORMIN' NORMAN ROAD CONSTRUCTION AND RECONSTRUCTION TASK ORDER - TS WHICH IS A GOOD NEIGHBOR AUTHORITY TIMBER SALE WITHIN THE KOOTENAI WILDFIRE CRISIS STRATEGY AREA.
- Ends
- Nov 29, 2026
- Started
- Apr 30, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU25F0039 ↗$117K
MILLER PEAK BAER
- Ends
- Nov 30, 2026
- Started
- May 28, 2025
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0051 ↗$217K
WELCH-GILLISPIE RECONSTRUCTION
- Ends
- Nov 30, 2026
- Started
- May 14, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0064 ↗$306K
THIS PROJECT REPLACES AN AGING TIMBER BRIDGE ON NFSR 187 AT MILE POST 1.9 WITH A NEW STEEL GIRDER BRIDGE FOUNDED ON REINFORCED CONCRETE GRADE BEAM. IIJA
- Ends
- Sep 29, 2027
- Started
- Jun 19, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0061 ↗$383K
REPLACE AGING TREATED TIMBER BRIDGE WITH NEW CONCRETE BRIDGE
- Ends
- Sep 29, 2027
- Started
- May 28, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0040 ↗$682K
TOPR FOR MOOSE CREEK FISH BARRIER ON THE FLATHEAD NATIONAL FOREST CONSTRUCT CAST-IN-PLACE CONCRETE FISH BARRIER
- Ends
- Oct 29, 2027
- Started
- Jun 14, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0077 ↗$439K
HIAWATHA ACCESS ROAD RECONDITIONING AND SURFACING PROJECT. TASK ORDER TO R1 ROADS & BRIDGE MATOC 1240LU24R0011
- Ends
- Oct 31, 2027
- Started
- Jun 30, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240BD26F0016 ↗$45K
ROAD MAINTENANCE, BONNERS FERRY BRUSHING
- Ends
- Nov 29, 2027
- Started
- Apr 21, 2026
- Agency
- Forest Service
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 12363N25F4140 ↗ | WASHOUT ROAD REPAIR | Forest Service | 237310 | $144K | Aug 31, 2025 | Nov 14, 2026 |
| 1240LU26F0003 ↗ | STORMIN' NORMAN ROAD CONSTRUCTION AND RECONSTRUCTION TASK ORDER - TS WHICH IS A GOOD NEIGHBOR AUTHORITY TIMBER SALE WITHIN THE KOOTENAI WILDFIRE CRISIS STRATEGY AREA. | Forest Service | 237310 | $1.0M | Apr 30, 2026 | Nov 29, 2026 |
| 1240LU25F0039 ↗ | MILLER PEAK BAER | Forest Service | 237310 | $117K | May 28, 2025 | Nov 30, 2026 |
| 1240LU26F0051 ↗ | WELCH-GILLISPIE RECONSTRUCTION | Forest Service | 237310 | $217K | May 14, 2026 | Nov 30, 2026 |
| 1240LU26F0064 ↗ | THIS PROJECT REPLACES AN AGING TIMBER BRIDGE ON NFSR 187 AT MILE POST 1.9 WITH A NEW STEEL GIRDER BRIDGE FOUNDED ON REINFORCED CONCRETE GRADE BEAM. IIJA | Forest Service | 237310 | $306K | Jun 19, 2026 | Sep 29, 2027 |
| 1240LU26F0061 ↗ | REPLACE AGING TREATED TIMBER BRIDGE WITH NEW CONCRETE BRIDGE | Forest Service | 237310 | $383K | May 28, 2026 | Sep 29, 2027 |
| 1240LU26F0040 ↗ | TOPR FOR MOOSE CREEK FISH BARRIER ON THE FLATHEAD NATIONAL FOREST CONSTRUCT CAST-IN-PLACE CONCRETE FISH BARRIER | Forest Service | 237310 | $682K | Jun 14, 2026 | Oct 29, 2027 |
| 1240LU26F0077 ↗ | HIAWATHA ACCESS ROAD RECONDITIONING AND SURFACING PROJECT. TASK ORDER TO R1 ROADS & BRIDGE MATOC 1240LU24R0011 | Forest Service | 237310 | $439K | Jun 30, 2026 | Oct 31, 2027 |
| 1240BD26F0016 ↗ | ROAD MAINTENANCE, BONNERS FERRY BRUSHING | Forest Service | 237310 | $45K | Apr 21, 2026 | Nov 29, 2027 |
Largest awards
- 1240LU26F0003 ↗$1.0M
STORMIN' NORMAN ROAD CONSTRUCTION AND RECONSTRUCTION TASK ORDER - TS WHICH IS A GOOD NEIGHBOR AUTHORITY TIMBER SALE WITHIN THE KOOTENAI WILDFIRE CRISIS STRATEGY AREA.
- Ends
- Nov 29, 2026
- Started
- Apr 30, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0040 ↗$682K
TOPR FOR MOOSE CREEK FISH BARRIER ON THE FLATHEAD NATIONAL FOREST CONSTRUCT CAST-IN-PLACE CONCRETE FISH BARRIER
- Ends
- Oct 29, 2027
- Started
- Jun 14, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU25F0040 ↗$576K
RUBY CREEK BRIDGES REPLACEMENT ON THE WISDOM RANGER DISTRICT OF THE BDNF THIS PROJECT REPLACES TWO STRUCTURALLY DEFICIENT AND LOAD POSTED BRIDGES. THE CROSSINGS ARE LOCATED NFSR 624 AT MILEPOST 4.4 AND MILEPOST 5.4, RESPECTIVELY. ALL TERMS, CONDITI
- Ends
- Aug 31, 2026
- Started
- Jun 8, 2025
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU25F0033 ↗$465K
BIL PROJECT: STARK-CROMWELL CULVERT REPLACEMENTS. REPLACEMENT OF THREE DETERIORATING UNDERSIZED CULVERTS WITH STRUCTURES THAT ALLOW FOR AQUATIC ORGANISM PASSAGE (AOP). STRUCTURES INCLUDED: 2 BOTTOMLESS ARCH CULVERTS, 1 LARGE ROUND CORRUGATED METAL PI
- Ends
- Nov 14, 2025
- Started
- Jun 30, 2025
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0077 ↗$439K
HIAWATHA ACCESS ROAD RECONDITIONING AND SURFACING PROJECT. TASK ORDER TO R1 ROADS & BRIDGE MATOC 1240LU24R0011
- Ends
- Oct 31, 2027
- Started
- Jun 30, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0061 ↗$383K
REPLACE AGING TREATED TIMBER BRIDGE WITH NEW CONCRETE BRIDGE
- Ends
- Sep 29, 2027
- Started
- May 28, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0064 ↗$306K
THIS PROJECT REPLACES AN AGING TIMBER BRIDGE ON NFSR 187 AT MILE POST 1.9 WITH A NEW STEEL GIRDER BRIDGE FOUNDED ON REINFORCED CONCRETE GRADE BEAM. IIJA
- Ends
- Sep 29, 2027
- Started
- Jun 19, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU25F0062 ↗$228K
FLATHEAD NF GAOA FNF 38-35.235 SF LOGAN CREEK CULVERT
- Ends
- Oct 30, 2026
- Started
- Jul 14, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0051 ↗$217K
WELCH-GILLISPIE RECONSTRUCTION
- Ends
- Nov 30, 2026
- Started
- May 14, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU26F0036 ↗$170K
TASK ORDER UNDER R1 ROAD & BRIDGE MATOC FOR ST. JOE ROAD REPAIRS AND MAINTENANCE BASE ITEM WORK INCLUDES SELECTIVE CLEARING (ROADSIDE BRUSH CUTTING), ROAD RECONDITIONING, CLEANING DITCHES, CLEANING CULVERTS, INSTALLING AND MAINTAINING DRAIN DIP
- Ends
- Oct 30, 2026
- Started
- Apr 30, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 12363N25F4140 ↗$144K
WASHOUT ROAD REPAIR
- Ends
- Nov 14, 2026
- Started
- Aug 31, 2025
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU25F0039 ↗$117K
MILLER PEAK BAER
- Ends
- Nov 30, 2026
- Started
- May 28, 2025
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU25F0001 ↗$110K
BRUSH CREEK CURVE WIDENING
- Ends
- Sep 14, 2025
- Started
- Dec 16, 2024
- Agency
- Forest Service
- NAICS
- 237310
- 1240BD26F0016 ↗$45K
ROAD MAINTENANCE, BONNERS FERRY BRUSHING
- Ends
- Nov 29, 2027
- Started
- Apr 21, 2026
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU24F0085 ↗$27K
DURING EXCAVATION OF THE SEPTIC TANK, THE LINES WERE DISCOVERED TO BE NEEDING REPLACED AS SOON AS POSSIBLE. DURING EXCAVATION, A TEMPORARY REPAIR WAS PLACED BETWEEN THE TANK AND THE LINES. DUE TO THE AMOUNT OF EXCAVATION NEEDED FOR THE LINES, ASPHALT
- Ends
- Jun 19, 2025
- Started
- Sep 25, 2024
- Agency
- Forest Service
- NAICS
- 237310
GAOA TRAIL CONSTRUCTION AND BRIDGE CONTRUCTION ON THE ROSS CREEK TRAIL OF THE THREE RIVERS RANGER DISTRICT. SEE MOD 0001 CLIN 0002
- Ends
- Oct 14, 2026
- Started
- Jun 2, 2024
- Agency
- Forest Service
- NAICS
- 237310
- 1240LQ26F0019 ↗$500
EFFICIENT CONTRACT VEHICLE TO ACCOMPLISH ROAD MAINTENANCE IN REGION 1 GUARANTEE MINIMUM
- Ends
- Sep 28, 2026
- Started
- Dec 14, 2025
- Agency
- Forest Service
- NAICS
- 237310
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE MANDATORY CONTRACT CLAUSE FAR 52.222 90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS, AS REQUIRED BY EXECUTIVE ORDER 14398.
- Ends
- —
- Started
- Jul 9, 2023
- Agency
- Forest Service
- NAICS
- 115310
LITTLE JOE BRIDGE
- Ends
- Jul 31, 2025
- Started
- Sep 18, 2022
- Agency
- Forest Service
- NAICS
- 237310
LOST CREEK AOP CULVERT REPLACEMENT 5.77 AND 5.99.
- Ends
- Oct 29, 2025
- Started
- Sep 8, 2024
- Agency
- Forest Service
- NAICS
- 237310
2 NEW AOPS ON CLEMMER GULCH. REPLACEMENT OF TWO UNDER-SIZED CULVERTS ON TELEGRAPH ROAD 495 (MP 4.78 & 5.4) TO AOPS. ITEMS AWARDED DESCRIBED BELOW: M.P 4.78 - BASE M.P 4.78 - OPTION ITEM 1 M.P 4.78 - OPTION ITEM 2 M.P 5.35 - BASE PRICE
- Ends
- Sep 30, 2026
- Started
- Sep 30, 2024
- Agency
- Forest Service
- NAICS
- 237310
REGION 1 ROAD MAINTENANCE AND FOREST MAINTENANCE/SUPPORT SERVICES
- Ends
- —
- Started
- Sep 29, 2025
- Agency
- Forest Service
- NAICS
- 237310
USFS, REGION 1, ROAD AND BRIDGE CONSTRUCTION MATOC
- Ends
- —
- Started
- Dec 15, 2024
- Agency
- Forest Service
- NAICS
- 237310
- 1240LU22F0081 ↗$-12
THE INTENT OF THIS ITEM IS TO RECONDITION AND INSTALL BMPS ON THE ROADS IN THE THORNE CREEK FIRE AREA. THE LOCATION IS ACCESSIBLE MAY - OCTOBER. THE WORK ASSOCIATED WITH THIS PROJECT INCLUDES BUT IS NOT LIMITED TO CONSTRUCTING ROAD DRAINAGE STRUCTURE
- Ends
- Aug 31, 2022
- Started
- Jul 11, 2022
- Agency
- Forest Service
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 1240LU26F0003 ↗ | STORMIN' NORMAN ROAD CONSTRUCTION AND RECONSTRUCTION TASK ORDER - TS WHICH IS A GOOD NEIGHBOR AUTHORITY TIMBER SALE WITHIN THE KOOTENAI WILDFIRE CRISIS STRATEGY AREA. | Forest Service | 237310 | $1.0M | Apr 30, 2026 | Nov 29, 2026 |
| 1240LU26F0040 ↗ | TOPR FOR MOOSE CREEK FISH BARRIER ON THE FLATHEAD NATIONAL FOREST CONSTRUCT CAST-IN-PLACE CONCRETE FISH BARRIER | Forest Service | 237310 | $682K | Jun 14, 2026 | Oct 29, 2027 |
| 1240LU25F0040 ↗ | RUBY CREEK BRIDGES REPLACEMENT ON THE WISDOM RANGER DISTRICT OF THE BDNF THIS PROJECT REPLACES TWO STRUCTURALLY DEFICIENT AND LOAD POSTED BRIDGES. THE CROSSINGS ARE LOCATED NFSR 624 AT MILEPOST 4.4 AND MILEPOST 5.4, RESPECTIVELY. ALL TERMS, CONDITI | Forest Service | 237310 | $576K | Jun 8, 2025 | Aug 31, 2026 |
| 1240LU25F0033 ↗ | BIL PROJECT: STARK-CROMWELL CULVERT REPLACEMENTS. REPLACEMENT OF THREE DETERIORATING UNDERSIZED CULVERTS WITH STRUCTURES THAT ALLOW FOR AQUATIC ORGANISM PASSAGE (AOP). STRUCTURES INCLUDED: 2 BOTTOMLESS ARCH CULVERTS, 1 LARGE ROUND CORRUGATED METAL PI | Forest Service | 237310 | $465K | Jun 30, 2025 | Nov 14, 2025 |
| 1240LU26F0077 ↗ | HIAWATHA ACCESS ROAD RECONDITIONING AND SURFACING PROJECT. TASK ORDER TO R1 ROADS & BRIDGE MATOC 1240LU24R0011 | Forest Service | 237310 | $439K | Jun 30, 2026 | Oct 31, 2027 |
| 1240LU26F0061 ↗ | REPLACE AGING TREATED TIMBER BRIDGE WITH NEW CONCRETE BRIDGE | Forest Service | 237310 | $383K | May 28, 2026 | Sep 29, 2027 |
| 1240LU26F0064 ↗ | THIS PROJECT REPLACES AN AGING TIMBER BRIDGE ON NFSR 187 AT MILE POST 1.9 WITH A NEW STEEL GIRDER BRIDGE FOUNDED ON REINFORCED CONCRETE GRADE BEAM. IIJA | Forest Service | 237310 | $306K | Jun 19, 2026 | Sep 29, 2027 |
| 1240LU25F0062 ↗ | FLATHEAD NF GAOA FNF 38-35.235 SF LOGAN CREEK CULVERT | Forest Service | 237310 | $228K | Jul 14, 2026 | Oct 30, 2026 |
| 1240LU26F0051 ↗ | WELCH-GILLISPIE RECONSTRUCTION | Forest Service | 237310 | $217K | May 14, 2026 | Nov 30, 2026 |
| 1240LU26F0036 ↗ | TASK ORDER UNDER R1 ROAD & BRIDGE MATOC FOR ST. JOE ROAD REPAIRS AND MAINTENANCE BASE ITEM WORK INCLUDES SELECTIVE CLEARING (ROADSIDE BRUSH CUTTING), ROAD RECONDITIONING, CLEANING DITCHES, CLEANING CULVERTS, INSTALLING AND MAINTAINING DRAIN DIP | Forest Service | 237310 | $170K | Apr 30, 2026 | Oct 30, 2026 |
| 12363N25F4140 ↗ | WASHOUT ROAD REPAIR | Forest Service | 237310 | $144K | Aug 31, 2025 | Nov 14, 2026 |
| 1240LU25F0039 ↗ | MILLER PEAK BAER | Forest Service | 237310 | $117K | May 28, 2025 | Nov 30, 2026 |
| 1240LU25F0001 ↗ | BRUSH CREEK CURVE WIDENING | Forest Service | 237310 | $110K | Dec 16, 2024 | Sep 14, 2025 |
| 1240BD26F0016 ↗ | ROAD MAINTENANCE, BONNERS FERRY BRUSHING | Forest Service | 237310 | $45K | Apr 21, 2026 | Nov 29, 2027 |
| 1240LU24F0085 ↗ | DURING EXCAVATION OF THE SEPTIC TANK, THE LINES WERE DISCOVERED TO BE NEEDING REPLACED AS SOON AS POSSIBLE. DURING EXCAVATION, A TEMPORARY REPAIR WAS PLACED BETWEEN THE TANK AND THE LINES. DUE TO THE AMOUNT OF EXCAVATION NEEDED FOR THE LINES, ASPHALT | Forest Service | 237310 | $27K | Sep 25, 2024 | Jun 19, 2025 |
| 1240LU24F0039 ↗ | GAOA TRAIL CONSTRUCTION AND BRIDGE CONTRUCTION ON THE ROSS CREEK TRAIL OF THE THREE RIVERS RANGER DISTRICT. SEE MOD 0001 CLIN 0002 | Forest Service | 237310 | $8K | Jun 2, 2024 | Oct 14, 2026 |
| 1240LQ26F0019 ↗ | EFFICIENT CONTRACT VEHICLE TO ACCOMPLISH ROAD MAINTENANCE IN REGION 1 GUARANTEE MINIMUM | Forest Service | 237310 | $500 | Dec 14, 2025 | Sep 28, 2026 |
| 1284LL23D0006 ↗ | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE MANDATORY CONTRACT CLAUSE FAR 52.222 90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS, AS REQUIRED BY EXECUTIVE ORDER 14398. | Forest Service | 115310 | $0 | Jul 9, 2023 | — |
| 1240LU22F0132 ↗ | LITTLE JOE BRIDGE | Forest Service | 237310 | $0 | Sep 18, 2022 | Jul 31, 2025 |
| 1240LU24F0065 ↗ | LOST CREEK AOP CULVERT REPLACEMENT 5.77 AND 5.99. | Forest Service | 237310 | $0 | Sep 8, 2024 | Oct 29, 2025 |
| 1240LU24F0080 ↗ | 2 NEW AOPS ON CLEMMER GULCH. REPLACEMENT OF TWO UNDER-SIZED CULVERTS ON TELEGRAPH ROAD 495 (MP 4.78 & 5.4) TO AOPS. ITEMS AWARDED DESCRIBED BELOW: M.P 4.78 - BASE M.P 4.78 - OPTION ITEM 1 M.P 4.78 - OPTION ITEM 2 M.P 5.35 - BASE PRICE | Forest Service | 237310 | $0 | Sep 30, 2024 | Sep 30, 2026 |
| 1240LQ25D0041 ↗ | REGION 1 ROAD MAINTENANCE AND FOREST MAINTENANCE/SUPPORT SERVICES | Forest Service | 237310 | $0 | Sep 29, 2025 | — |
| 1240LU25D0001 ↗ | USFS, REGION 1, ROAD AND BRIDGE CONSTRUCTION MATOC | Forest Service | 237310 | $0 | Dec 15, 2024 | — |
| 1240LU22F0081 ↗ | THE INTENT OF THIS ITEM IS TO RECONDITION AND INSTALL BMPS ON THE ROADS IN THE THORNE CREEK FIRE AREA. THE LOCATION IS ACCESSIBLE MAY - OCTOBER. THE WORK ASSOCIATED WITH THIS PROJECT INCLUDES BUT IS NOT LIMITED TO CONSTRUCTING ROAD DRAINAGE STRUCTURE | Forest Service | 237310 | $-12 | Jul 11, 2022 | Aug 31, 2022 |