Obligations by agency
- Department Of Defense$18.0M
- General Services Administration$51K
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- N6247325F0460 ↗$3.2M
FFP FOR ALL LABOR, EQUIPMENT, MATERIALS AND BONDING TO ROOF REPLACEMENT OF BLDG. 2 , BLDG. 194, AND BLDG. 249.
- Ends
- Dec 6, 2026
- Started
- Aug 19, 2025
- Agency
- Department Of The Navy
- NAICS
- 238160
- W912BV25FA027 ↗$4.1M
W44XGQ52063481 THE INTENT OF THE PROJECT IS TO REPLACE THE EXISTING FLAT ROOFING SYSTEMS ON BUILDING 840 AND 1490, AND TO REPLACE THE EXISTING LAMINATED SHINGLE ROOFING SYSTEM AT BUILDING 1279.
- Ends
- Dec 17, 2026
- Started
- Jul 29, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W912BV25FA033 ↗$2.2M
THE INTENT OF THE PROJECT IS TO REPAIR THE CLAY BARREL TILE AND TPO ROOF ON BUILDING 2025, TO REPLACE THE EXISTING TPO ROOFS WITH A NEW WITH135 MIL FLEECE BACK
- Ends
- Apr 4, 2027
- Started
- Aug 25, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W912BV25FA031 ↗$4.1M
FORT SILL FY25 ROOF PACKAGE 5 - W44XGQ52123814
- Ends
- Oct 7, 2027
- Started
- Aug 6, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W912BV25FA036 ↗$3.5M
THE INTENT OF THE PROJECT IS TO REPAIR THE LAMINATED SHINGLE ROOFING SYSTEMS ON BUILDING 1950, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM CONSISTING OF ASPHALT SHINGLE AND TPO ON BUILDING 1948, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM
- Ends
- Nov 24, 2027
- Started
- Aug 27, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| N6247325F0460 ↗ | FFP FOR ALL LABOR, EQUIPMENT, MATERIALS AND BONDING TO ROOF REPLACEMENT OF BLDG. 2 , BLDG. 194, AND BLDG. 249. | Department Of The Navy | 238160 | $3.2M | Aug 19, 2025 | Dec 6, 2026 |
| W912BV25FA027 ↗ | W44XGQ52063481 THE INTENT OF THE PROJECT IS TO REPLACE THE EXISTING FLAT ROOFING SYSTEMS ON BUILDING 840 AND 1490, AND TO REPLACE THE EXISTING LAMINATED SHINGLE ROOFING SYSTEM AT BUILDING 1279. | Department Of The Army | 236220 | $4.1M | Jul 29, 2025 | Dec 17, 2026 |
| W912BV25FA033 ↗ | THE INTENT OF THE PROJECT IS TO REPAIR THE CLAY BARREL TILE AND TPO ROOF ON BUILDING 2025, TO REPLACE THE EXISTING TPO ROOFS WITH A NEW WITH135 MIL FLEECE BACK | Department Of The Army | 236220 | $2.2M | Aug 25, 2025 | Apr 4, 2027 |
| W912BV25FA031 ↗ | FORT SILL FY25 ROOF PACKAGE 5 - W44XGQ52123814 | Department Of The Army | 236220 | $4.1M | Aug 6, 2025 | Oct 7, 2027 |
| W912BV25FA036 ↗ | THE INTENT OF THE PROJECT IS TO REPAIR THE LAMINATED SHINGLE ROOFING SYSTEMS ON BUILDING 1950, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM CONSISTING OF ASPHALT SHINGLE AND TPO ON BUILDING 1948, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM | Department Of The Army | 236220 | $3.5M | Aug 27, 2025 | Nov 24, 2027 |
Largest awards
- W912BV25FA031 ↗$4.1M
FORT SILL FY25 ROOF PACKAGE 5 - W44XGQ52123814
- Ends
- Oct 7, 2027
- Started
- Aug 6, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W912BV25FA027 ↗$4.1M
W44XGQ52063481 THE INTENT OF THE PROJECT IS TO REPLACE THE EXISTING FLAT ROOFING SYSTEMS ON BUILDING 840 AND 1490, AND TO REPLACE THE EXISTING LAMINATED SHINGLE ROOFING SYSTEM AT BUILDING 1279.
- Ends
- Dec 17, 2026
- Started
- Jul 29, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- W912BV25FA036 ↗$3.5M
THE INTENT OF THE PROJECT IS TO REPAIR THE LAMINATED SHINGLE ROOFING SYSTEMS ON BUILDING 1950, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM CONSISTING OF ASPHALT SHINGLE AND TPO ON BUILDING 1948, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM
- Ends
- Nov 24, 2027
- Started
- Aug 27, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- N6247325F0460 ↗$3.2M
FFP FOR ALL LABOR, EQUIPMENT, MATERIALS AND BONDING TO ROOF REPLACEMENT OF BLDG. 2 , BLDG. 194, AND BLDG. 249.
- Ends
- Dec 6, 2026
- Started
- Aug 19, 2025
- Agency
- Department Of The Navy
- NAICS
- 238160
- W912BV25FA033 ↗$2.2M
THE INTENT OF THE PROJECT IS TO REPAIR THE CLAY BARREL TILE AND TPO ROOF ON BUILDING 2025, TO REPLACE THE EXISTING TPO ROOFS WITH A NEW WITH135 MIL FLEECE BACK
- Ends
- Apr 4, 2027
- Started
- Aug 25, 2025
- Agency
- Department Of The Army
- NAICS
- 236220
- N6247324F4789 ↗$837K
N62473-19-D-1234/N6247324F4789 B-94 B-379 B-458 ROOF REPLACEMENT PCS 1-7
- Ends
- Oct 13, 2025
- Started
- Jun 27, 2024
- Agency
- Department Of The Navy
- NAICS
- 238160
- 47PH0525F0040 ↗$44K
EMERGENCY REPAIR OF THE TWO EXPANSION JOINTS ON THE REAR (NORTH SIDE) OF THE USBC IN LITTLE ROCK AR300 WEST 2ND ST., LITTLE ROCK, AR 72201.
- Ends
- Jun 5, 2025
- Started
- Dec 19, 2024
- Agency
- Public Buildings Service
- NAICS
- 236220
NO COST TIME EXTENSION FOR CONTRACTOR TO COMPLETE FINAL WEEK OF WORK ON LANHAM FEDERAL BUILDING ROOF REPLACEMENT PROJECT AT 819 TAYLOR STREET, FORT WORTH, TEXAS 76102
- Ends
- Apr 6, 2025
- Started
- Mar 27, 2023
- Agency
- Public Buildings Service
- NAICS
- 236220
ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC)
- Ends
- —
- Started
- Dec 16, 2024
- Agency
- Federal Acquisition Service
- NAICS
- 541320
B1602 CONSTRUCTION
- Ends
- Oct 14, 2025
- Started
- Oct 13, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
ROOFING MACC
- Ends
- —
- Started
- Aug 26, 2019
- Agency
- Department Of The Navy
- NAICS
- 238160
ADDITION OF CLASS DEVIATIONS (CD) CD-2025-04 AND CD-2025-05 INTERIM RULE IMPLEMENTING FAR 52.240-1, PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES.
- Ends
- —
- Started
- Jan 26, 2021
- Agency
- Public Buildings Service
- NAICS
- 236220
ADMINISTRATIVE MOD IN ACCORDANCE WITH EXECUTIVE ORDERS
- Ends
- —
- Started
- Oct 25, 2023
- Agency
- Department Of The Army
- NAICS
- 236220
MODIFICATION TO ADD END DATE TO CONTRACT FROM DATE OF NTP.
- Ends
- Sep 18, 2026
- Started
- Oct 22, 2024
- Agency
- Department Of The Army
- NAICS
- 236220
DPW-CMB POP EXTENSION MOD
- Ends
- —
- Started
- Feb 28, 2019
- Agency
- Department Of The Army
- NAICS
- 236220
- W912BV24F0002 ↗$-3K
MINIMUM GUARANTEE. MODIFICATION TO DEOBLIGATE MINIMUM GUARANTEE AS IT HAS BEEN MET THROUGH ANOTHER TASK ORDER.
- Ends
- May 22, 2025
- Started
- Oct 25, 2023
- Agency
- Department Of The Army
- NAICS
- 236220
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W912BV25FA031 ↗ | FORT SILL FY25 ROOF PACKAGE 5 - W44XGQ52123814 | Department Of The Army | 236220 | $4.1M | Aug 6, 2025 | Oct 7, 2027 |
| W912BV25FA027 ↗ | W44XGQ52063481 THE INTENT OF THE PROJECT IS TO REPLACE THE EXISTING FLAT ROOFING SYSTEMS ON BUILDING 840 AND 1490, AND TO REPLACE THE EXISTING LAMINATED SHINGLE ROOFING SYSTEM AT BUILDING 1279. | Department Of The Army | 236220 | $4.1M | Jul 29, 2025 | Dec 17, 2026 |
| W912BV25FA036 ↗ | THE INTENT OF THE PROJECT IS TO REPAIR THE LAMINATED SHINGLE ROOFING SYSTEMS ON BUILDING 1950, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM CONSISTING OF ASPHALT SHINGLE AND TPO ON BUILDING 1948, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM | Department Of The Army | 236220 | $3.5M | Aug 27, 2025 | Nov 24, 2027 |
| N6247325F0460 ↗ | FFP FOR ALL LABOR, EQUIPMENT, MATERIALS AND BONDING TO ROOF REPLACEMENT OF BLDG. 2 , BLDG. 194, AND BLDG. 249. | Department Of The Navy | 238160 | $3.2M | Aug 19, 2025 | Dec 6, 2026 |
| W912BV25FA033 ↗ | THE INTENT OF THE PROJECT IS TO REPAIR THE CLAY BARREL TILE AND TPO ROOF ON BUILDING 2025, TO REPLACE THE EXISTING TPO ROOFS WITH A NEW WITH135 MIL FLEECE BACK | Department Of The Army | 236220 | $2.2M | Aug 25, 2025 | Apr 4, 2027 |
| N6247324F4789 ↗ | N62473-19-D-1234/N6247324F4789 B-94 B-379 B-458 ROOF REPLACEMENT PCS 1-7 | Department Of The Navy | 238160 | $837K | Jun 27, 2024 | Oct 13, 2025 |
| 47PH0525F0040 ↗ | EMERGENCY REPAIR OF THE TWO EXPANSION JOINTS ON THE REAR (NORTH SIDE) OF THE USBC IN LITTLE ROCK AR300 WEST 2ND ST., LITTLE ROCK, AR 72201. | Public Buildings Service | 236220 | $44K | Dec 19, 2024 | Jun 5, 2025 |
| 47PH0923F0015 ↗ | NO COST TIME EXTENSION FOR CONTRACTOR TO COMPLETE FINAL WEEK OF WORK ON LANHAM FEDERAL BUILDING ROOF REPLACEMENT PROJECT AT 819 TAYLOR STREET, FORT WORTH, TEXAS 76102 | Public Buildings Service | 236220 | $5K | Mar 27, 2023 | Apr 6, 2025 |
| 47QRCA25DU602 ↗ | ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC) | Federal Acquisition Service | 541320 | $3K | Dec 16, 2024 | — |
| W912BV24F0393 ↗ | B1602 CONSTRUCTION | Department Of The Army | 236220 | $0 | Oct 13, 2024 | Oct 14, 2025 |
| N6247319D1234 ↗ | ROOFING MACC | Department Of The Navy | 238160 | $0 | Aug 26, 2019 | — |
| 47PH0821D0002 ↗ | ADDITION OF CLASS DEVIATIONS (CD) CD-2025-04 AND CD-2025-05 INTERIM RULE IMPLEMENTING FAR 52.240-1, PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES. | Public Buildings Service | 236220 | $0 | Jan 26, 2021 | — |
| W912BV24D0001 ↗ | ADMINISTRATIVE MOD IN ACCORDANCE WITH EXECUTIVE ORDERS | Department Of The Army | 236220 | $0 | Oct 25, 2023 | — |
| W912BV24F0390 ↗ | MODIFICATION TO ADD END DATE TO CONTRACT FROM DATE OF NTP. | Department Of The Army | 236220 | $0 | Oct 22, 2024 | Sep 18, 2026 |
| W911RQ19D0014 ↗ | DPW-CMB POP EXTENSION MOD | Department Of The Army | 236220 | $0 | Feb 28, 2019 | — |
| W912BV24F0002 ↗ | MINIMUM GUARANTEE. MODIFICATION TO DEOBLIGATE MINIMUM GUARANTEE AS IT HAS BEEN MET THROUGH ANOTHER TASK ORDER. | Department Of The Army | 236220 | $-3K | Oct 25, 2023 | May 22, 2025 |