C.N.S. Communications, LLC
UEI MTLZBCUL6Y61 · AZ · SAM.gov record ↗
Obligations by agency
- Department Of Transportation$3.2M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- 6973GH22F01623 ↗$90K
IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 75KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 80KW EG 208/120V, 3PH IAW THE APPROVED DRAWINGS DATED 2/26/2025 AND THE 2022 125KW EG OUTDOOR BASELINE WITH ERMS INSTALLATION SOW AND ERM
- Ends
- Nov 29, 2026
- Started
- Sep 5, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH18F00701 ↗$-3K
DE-OBLIGATE ERMS LINE ITEM 00006 AT HINCH MTN, TN (HCH) VOR JCN: 1600954
- Ends
- Dec 29, 2026
- Started
- Feb 14, 2018
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00766 ↗$40K
SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT AT KENAI, AK (ENAD) NXRAD JCN:18032204
- Ends
- Apr 26, 2027
- Started
- May 5, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F01076 ↗$360K
F11 CPDS FUNDING IS ALLOCATED FOR A TEMPORARY LOGISTICS SITE DEDICATED TO STAGING, INSPECTING, AND REPAIRING CPDS PROJECT EQUIPMENT EXCLUSIVELY. JCN: N/A
- Ends
- Jul 30, 2027
- Started
- Jul 6, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 6973GH22F01623 ↗ | IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 75KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 80KW EG 208/120V, 3PH IAW THE APPROVED DRAWINGS DATED 2/26/2025 AND THE 2022 125KW EG OUTDOOR BASELINE WITH ERMS INSTALLATION SOW AND ERM | Federal Aviation Administration | 238210 | $90K | Sep 5, 2022 | Nov 29, 2026 |
| 6973GH18F00701 ↗ | DE-OBLIGATE ERMS LINE ITEM 00006 AT HINCH MTN, TN (HCH) VOR JCN: 1600954 | Federal Aviation Administration | 238210 | $-3K | Feb 14, 2018 | Dec 29, 2026 |
| 6973GH26F00766 ↗ | SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT AT KENAI, AK (ENAD) NXRAD JCN:18032204 | Federal Aviation Administration | 238210 | $40K | May 5, 2026 | Apr 26, 2027 |
| 6973GH25F01076 ↗ | F11 CPDS FUNDING IS ALLOCATED FOR A TEMPORARY LOGISTICS SITE DEDICATED TO STAGING, INSPECTING, AND REPAIRING CPDS PROJECT EQUIPMENT EXCLUSIVELY. JCN: N/A | Federal Aviation Administration | 238210 | $360K | Jul 6, 2025 | Jul 30, 2027 |
Largest awards
- 6973GH22F00936 ↗$446K
ADDITIONAL BIL FUNDING FOR TEMPORARY UPS TRAILER MOVES REQUIRED FOR THE FAAS UPS REPLACEMENTS THROUGHOUT THE NAS.
- Ends
- Oct 30, 2026
- Started
- May 4, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F00282 ↗$384K
BIL FUNDS: OKLAHOMA CITY, OK (RGRB) ALSF JCN:22000685 FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT
- Ends
- Sep 29, 2026
- Started
- Dec 19, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH25F01076 ↗$360K
F11 CPDS FUNDING IS ALLOCATED FOR A TEMPORARY LOGISTICS SITE DEDICATED TO STAGING, INSPECTING, AND REPAIRING CPDS PROJECT EQUIPMENT EXCLUSIVELY. JCN: N/A
- Ends
- Jul 30, 2027
- Started
- Jul 6, 2025
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01027 ↗$338K
ADDING THE 2024 OUTDOOR EG AND ERMS INSTALLATION BASELINE FOR SHREVEPORT, LA (SHV) ALS JCN: 18026816
- Ends
- Dec 8, 2025
- Started
- Apr 26, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01015 ↗$329K
ADDING THE 2024 OUTDOOR EG INSTALLATION FUNDING FOR DECATUR, IL (DECA) ATCT JCN: 1500551
- Ends
- Dec 8, 2025
- Started
- Apr 18, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F00196 ↗$292K
ALLOCATES FUNDING FOR THE FEDERAL AVIATION ADMINISTRATION'S UPS TEMPORARY TRAILER RELOCATIONS THROUGHOUT THE NATIONAL AIRSPACE SYSTEM, THE UPS CHARGING STATION MONTHLY RENTAL IN CNS'S WAREHOUSE, AND THE UPS TEMPORARY TRAILER UPDATES, MAINTE
- Ends
- Oct 30, 2026
- Started
- Dec 7, 2021
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH24F00810 ↗$260K
2024 FST DIESEL INSTALL BASELINE FUNDING AT TRAVERSE CITY, MI (TVC) RCAG, JCN: 1501315
- Ends
- Oct 30, 2026
- Started
- May 2, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F00175 ↗$243K
IIJA FUNDS. SITE SPECIFIC INSTALLATION COST TO REMOVE THE 1,000-GALLON AST, 50' OF UNDERGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, TRANSITION BOX, SOIL SAMPLES, FUEL MONITORING SYSTEM, (6) BOLLARDS, AND CONCRETE CONTAINMENT FST PAD; AN
- Ends
- Sep 29, 2025
- Started
- Nov 17, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01676 ↗$227K
IIJA FUNDS, SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 135KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 125KW EG 480Y/277V, 3PH IAW THE APPROVED DRAWINGS DATED 2/6/2025 AND THE 2022 125KW EG OUTDOOR BASELINE WITH ERMS INSTALLATION SOW, ER
- Ends
- Jun 29, 2026
- Started
- Sep 11, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01443 ↗$214K
SITE SPECIFIC INSTALLATION AT MOFFETT, CA (NUQ) ASR JCN: 1404131
- Ends
- Oct 29, 2025
- Started
- Jun 20, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F00276 ↗$202K
IIJA FUNDS, SITE SPECIFIC FUNDING TO REMOVAL OF 1,000-GALLON AST AND INSTALLATION OF 1,000-GALLON AST AT OWENS VALLEY, CA (QOV) JCN 18027398
- Ends
- Jun 29, 2025
- Started
- Dec 6, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F00273 ↗$201K
IIJA (INFRASTRUCTURE INVESTMENT AND JOBS ACT). SITE SPECIFIC INSTALLATION FOR LOS ANGELES, CA (LAXI) JCN: 18027124
- Ends
- Mar 29, 2025
- Started
- Dec 6, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01442 ↗$186K
SITE SPECIFIC INSTALLATION FUNDING AT MARYSVILLE, CA (BAB) ASR JCN: 1501593
- Ends
- Jun 29, 2025
- Started
- Jun 20, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F00179 ↗$185K
IIJA FUNDS, SITE SPECIFIC INSTALLATION AT MCCLELLAN, CA (MCC) ASR, JCN: 18027163
- Ends
- Sep 29, 2025
- Started
- Nov 20, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01626 ↗$138K
IIJA FUNDS. SITE-SPECIFIC INSTALLATION COST PRICING TO REMOVE THE EXISTING 10KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 25KW EG 240/120V, 1PH IAW THE APPROVED DRAWINGS DATED 5/22/2025 AND THE 2022 125KW EG INDOOR BASELINE, REMOVE THE EXIST
- Ends
- Dec 30, 2025
- Started
- Sep 5, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01678 ↗$137K
IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 200KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW EG 208/120V, 3PH IAW THE APPROVED DRAWINGS DATED 1/14/2025 AND THE 2022 125KW EG INDOOR BASELINE WITH ERMS INSTALLATION SOW, ERM
- Ends
- Aug 30, 2026
- Started
- Sep 11, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01753 ↗$134K
INCLUDING THE SITE-SPECIFIC COSTS FOR THE UPS INSTALLATION AT THE MONROE, LA (MLU) ASR. JCN: 18057423
- Ends
- May 20, 2025
- Started
- Aug 24, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH23F01752 ↗$133K
IIJA FUNDS, ADDING THE 2024 PROPANE DESIGNS AND INSTALLATION BASELINE FUNDS FOR MERIDIAN, MS (MEI) ATCT JCN: 23004440
- Ends
- Mar 30, 2026
- Started
- Aug 24, 2023
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH24F00940 ↗$131K
SITE SPECIFIC INSTALLATION INCLUDES THE REMOVAL OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, (10) BOLLARDS AND CONCRETE FST PAD; AND INSTALLATION OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND R
- Ends
- May 29, 2026
- Started
- May 22, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00298 ↗$129K
FST FUNDED.2024 BASELINE DC BUS DEMO SCOPE: CONDUCT REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT SANTA BARBARA, CA (SBAA) RTR JCN:24016129
- Ends
- Oct 30, 2026
- Started
- Jan 25, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00295 ↗$129K
FST FUNDED. 2024 BASELINE DC BUS DEMO SCOPE: CONDUCT REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT SANTA BARBARA, CA (SBAC)RTR JCN:24016130
- Ends
- Oct 30, 2026
- Started
- Jan 25, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00245 ↗$129K
FST FUNDED2024 DC BUS DEMO BASELINE SCOPE: CONDUCT REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT PEACH SPRINGS, AZ (PGS) RCAG JCN:24016128
- Ends
- May 29, 2026
- Started
- Jan 5, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH22F01571 ↗$124K
IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 20KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 25KW EG 240/120V, 3PH IAW THE APPROVED DRAWINGS DATED 2/6/2025 AND THE 2022 125KW EG INDOOR BASELINE WITH ERMS INSTALLATION SOW, DEVELOP
- Ends
- Dec 29, 2025
- Started
- Aug 28, 2022
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH24F00359 ↗$112K
IIJA FUNDS: SITE SPECIFIC INSTALLATION AT COLUMBUS, OH (CMHB) TDWR JCN: 1500495
- Ends
- Jun 29, 2025
- Started
- Jan 31, 2024
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- 6973GH26F00403 ↗$106K
THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT OKLAHOMA CITY, OK (OKC) ARSR WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY OF THE FACILITY. JCN:18066433
- Ends
- Oct 29, 2026
- Started
- Feb 19, 2026
- Agency
- Federal Aviation Administration
- NAICS
- 238210
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 6973GH22F00936 ↗ | ADDITIONAL BIL FUNDING FOR TEMPORARY UPS TRAILER MOVES REQUIRED FOR THE FAAS UPS REPLACEMENTS THROUGHOUT THE NAS. | Federal Aviation Administration | 238210 | $446K | May 4, 2022 | Oct 30, 2026 |
| 6973GH25F00282 ↗ | BIL FUNDS: OKLAHOMA CITY, OK (RGRB) ALSF JCN:22000685 FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT | Federal Aviation Administration | 238210 | $384K | Dec 19, 2024 | Sep 29, 2026 |
| 6973GH25F01076 ↗ | F11 CPDS FUNDING IS ALLOCATED FOR A TEMPORARY LOGISTICS SITE DEDICATED TO STAGING, INSPECTING, AND REPAIRING CPDS PROJECT EQUIPMENT EXCLUSIVELY. JCN: N/A | Federal Aviation Administration | 238210 | $360K | Jul 6, 2025 | Jul 30, 2027 |
| 6973GH23F01027 ↗ | ADDING THE 2024 OUTDOOR EG AND ERMS INSTALLATION BASELINE FOR SHREVEPORT, LA (SHV) ALS JCN: 18026816 | Federal Aviation Administration | 238210 | $338K | Apr 26, 2023 | Dec 8, 2025 |
| 6973GH23F01015 ↗ | ADDING THE 2024 OUTDOOR EG INSTALLATION FUNDING FOR DECATUR, IL (DECA) ATCT JCN: 1500551 | Federal Aviation Administration | 238210 | $329K | Apr 18, 2023 | Dec 8, 2025 |
| 6973GH22F00196 ↗ | ALLOCATES FUNDING FOR THE FEDERAL AVIATION ADMINISTRATION'S UPS TEMPORARY TRAILER RELOCATIONS THROUGHOUT THE NATIONAL AIRSPACE SYSTEM, THE UPS CHARGING STATION MONTHLY RENTAL IN CNS'S WAREHOUSE, AND THE UPS TEMPORARY TRAILER UPDATES, MAINTE | Federal Aviation Administration | 238210 | $292K | Dec 7, 2021 | Oct 30, 2026 |
| 6973GH24F00810 ↗ | 2024 FST DIESEL INSTALL BASELINE FUNDING AT TRAVERSE CITY, MI (TVC) RCAG, JCN: 1501315 | Federal Aviation Administration | 238210 | $260K | May 2, 2024 | Oct 30, 2026 |
| 6973GH23F00175 ↗ | IIJA FUNDS. SITE SPECIFIC INSTALLATION COST TO REMOVE THE 1,000-GALLON AST, 50' OF UNDERGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, TRANSITION BOX, SOIL SAMPLES, FUEL MONITORING SYSTEM, (6) BOLLARDS, AND CONCRETE CONTAINMENT FST PAD; AN | Federal Aviation Administration | 238210 | $243K | Nov 17, 2022 | Sep 29, 2025 |
| 6973GH22F01676 ↗ | IIJA FUNDS, SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 135KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 125KW EG 480Y/277V, 3PH IAW THE APPROVED DRAWINGS DATED 2/6/2025 AND THE 2022 125KW EG OUTDOOR BASELINE WITH ERMS INSTALLATION SOW, ER | Federal Aviation Administration | 238210 | $227K | Sep 11, 2022 | Jun 29, 2026 |
| 6973GH23F01443 ↗ | SITE SPECIFIC INSTALLATION AT MOFFETT, CA (NUQ) ASR JCN: 1404131 | Federal Aviation Administration | 238210 | $214K | Jun 20, 2023 | Oct 29, 2025 |
| 6973GH23F00276 ↗ | IIJA FUNDS, SITE SPECIFIC FUNDING TO REMOVAL OF 1,000-GALLON AST AND INSTALLATION OF 1,000-GALLON AST AT OWENS VALLEY, CA (QOV) JCN 18027398 | Federal Aviation Administration | 238210 | $202K | Dec 6, 2022 | Jun 29, 2025 |
| 6973GH23F00273 ↗ | IIJA (INFRASTRUCTURE INVESTMENT AND JOBS ACT). SITE SPECIFIC INSTALLATION FOR LOS ANGELES, CA (LAXI) JCN: 18027124 | Federal Aviation Administration | 238210 | $201K | Dec 6, 2022 | Mar 29, 2025 |
| 6973GH23F01442 ↗ | SITE SPECIFIC INSTALLATION FUNDING AT MARYSVILLE, CA (BAB) ASR JCN: 1501593 | Federal Aviation Administration | 238210 | $186K | Jun 20, 2023 | Jun 29, 2025 |
| 6973GH23F00179 ↗ | IIJA FUNDS, SITE SPECIFIC INSTALLATION AT MCCLELLAN, CA (MCC) ASR, JCN: 18027163 | Federal Aviation Administration | 238210 | $185K | Nov 20, 2022 | Sep 29, 2025 |
| 6973GH22F01626 ↗ | IIJA FUNDS. SITE-SPECIFIC INSTALLATION COST PRICING TO REMOVE THE EXISTING 10KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 25KW EG 240/120V, 1PH IAW THE APPROVED DRAWINGS DATED 5/22/2025 AND THE 2022 125KW EG INDOOR BASELINE, REMOVE THE EXIST | Federal Aviation Administration | 238210 | $138K | Sep 5, 2022 | Dec 30, 2025 |
| 6973GH22F01678 ↗ | IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 200KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW EG 208/120V, 3PH IAW THE APPROVED DRAWINGS DATED 1/14/2025 AND THE 2022 125KW EG INDOOR BASELINE WITH ERMS INSTALLATION SOW, ERM | Federal Aviation Administration | 238210 | $137K | Sep 11, 2022 | Aug 30, 2026 |
| 6973GH23F01753 ↗ | INCLUDING THE SITE-SPECIFIC COSTS FOR THE UPS INSTALLATION AT THE MONROE, LA (MLU) ASR. JCN: 18057423 | Federal Aviation Administration | 238210 | $134K | Aug 24, 2023 | May 20, 2025 |
| 6973GH23F01752 ↗ | IIJA FUNDS, ADDING THE 2024 PROPANE DESIGNS AND INSTALLATION BASELINE FUNDS FOR MERIDIAN, MS (MEI) ATCT JCN: 23004440 | Federal Aviation Administration | 238210 | $133K | Aug 24, 2023 | Mar 30, 2026 |
| 6973GH24F00940 ↗ | SITE SPECIFIC INSTALLATION INCLUDES THE REMOVAL OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, (10) BOLLARDS AND CONCRETE FST PAD; AND INSTALLATION OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND R | Federal Aviation Administration | 238210 | $131K | May 22, 2024 | May 29, 2026 |
| 6973GH26F00298 ↗ | FST FUNDED.2024 BASELINE DC BUS DEMO SCOPE: CONDUCT REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT SANTA BARBARA, CA (SBAA) RTR JCN:24016129 | Federal Aviation Administration | 238210 | $129K | Jan 25, 2026 | Oct 30, 2026 |
| 6973GH26F00295 ↗ | FST FUNDED. 2024 BASELINE DC BUS DEMO SCOPE: CONDUCT REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT SANTA BARBARA, CA (SBAC)RTR JCN:24016130 | Federal Aviation Administration | 238210 | $129K | Jan 25, 2026 | Oct 30, 2026 |
| 6973GH26F00245 ↗ | FST FUNDED2024 DC BUS DEMO BASELINE SCOPE: CONDUCT REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT PEACH SPRINGS, AZ (PGS) RCAG JCN:24016128 | Federal Aviation Administration | 238210 | $129K | Jan 5, 2026 | May 29, 2026 |
| 6973GH22F01571 ↗ | IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 20KW EG AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 25KW EG 240/120V, 3PH IAW THE APPROVED DRAWINGS DATED 2/6/2025 AND THE 2022 125KW EG INDOOR BASELINE WITH ERMS INSTALLATION SOW, DEVELOP | Federal Aviation Administration | 238210 | $124K | Aug 28, 2022 | Dec 29, 2025 |
| 6973GH24F00359 ↗ | IIJA FUNDS: SITE SPECIFIC INSTALLATION AT COLUMBUS, OH (CMHB) TDWR JCN: 1500495 | Federal Aviation Administration | 238210 | $112K | Jan 31, 2024 | Jun 29, 2025 |
| 6973GH26F00403 ↗ | THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT OKLAHOMA CITY, OK (OKC) ARSR WHICH INCLUDES A PARTIAL POWER SYSTEMS STUDY OF THE FACILITY. JCN:18066433 | Federal Aviation Administration | 238210 | $106K | Feb 19, 2026 | Oct 29, 2026 |