The Trustees Of Princeton University
UEI NJ1YPQXQG7U5 · NJ · SAM.gov record ↗
Obligations by agency
- Department Of Energy$365.3M
- National Aeronautics And Space Administration$35.8M
- Department Of Defense$1.3M
- Smithsonian Institution$57K
- Department Of Health And Human Services$-645K
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- NNG17FC93C ↗$1.8M
THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
- Ends
- Sep 29, 2026
- Started
- Mar 22, 2017
- Agency
- National Aeronautics And Space Administration
- NAICS
- 334511
- DEAC0209CH11466 ↗$365.3M
MANAGEMENT AND OPERATING CONTRACT FOR THE MANAGEMENT AND OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL).
- Ends
- Mar 30, 2027
- Started
- Jan 30, 2009
- Agency
- Department Of Energy
- NAICS
- 611310
RESEARCH SUPPORT SERVICES
- Ends
- Apr 29, 2027
- Started
- Jul 10, 2025
- Agency
- Smithsonian Institution
- NAICS
- 611310
- W912HQ26PA002 ↗$250K
SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I
- Ends
- Nov 1, 2027
- Started
- Nov 2, 2025
- Agency
- Department Of The Army
- NAICS
- 541715
- W912HQ25C0015 ↗$868K
ESTCP PROJECT CR24-8407 "ASSESSMENT OF DECADAL CLIMATE PREDICTIONS IN SUPPORT OF DOD ACTIVITIES TO BRIDGE ACROSS THE WEATHER-TO-CLIMATE CONTINUUM" FOR ANALYSIS AND PREDICTION OF CLIMATE DYNAMICS ON WEATHER-TO-CLIMATE SCALES.
- Ends
- Dec 10, 2027
- Started
- Dec 11, 2024
- Agency
- Department Of The Army
- NAICS
- 541715
- 80GSFC19C0027 ↗$34.0M
REMOVAL OF CLAUSES/DRDS IAW EO 14035 - INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) FOR SMD DIRECTORATE
- Ends
- Jan 30, 2028
- Started
- Dec 17, 2018
- Agency
- National Aeronautics And Space Administration
- NAICS
- 541715
- W912HQ25P0029 ↗$141K
SERDP PROJECT RC25-4949 "ADVANCING CONSERVATION THROUGH A SYNERGY OF DRONE-BASED REMOTE SENSING AND FINE SCALE MODELING: DE-TANGLING TOPOGRAPHY, SOIL MOISTURE AND SHALLOW GROUNDWATER ON VEGETATION RESILIENCY"
- Ends
- Mar 1, 2028
- Started
- Mar 2, 2025
- Agency
- Department Of The Army
- NAICS
- 541715
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| NNG17FC93C ↗ | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | National Aeronautics And Space Administration | 334511 | $1.8M | Mar 22, 2017 | Sep 29, 2026 |
| DEAC0209CH11466 ↗ | MANAGEMENT AND OPERATING CONTRACT FOR THE MANAGEMENT AND OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL). | Department Of Energy | 611310 | $365.3M | Jan 30, 2009 | Mar 30, 2027 |
| 33330525P00507914 ↗ | RESEARCH SUPPORT SERVICES | Smithsonian Institution | 611310 | $57K | Jul 10, 2025 | Apr 29, 2027 |
| W912HQ26PA002 ↗ | SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I | Department Of The Army | 541715 | $250K | Nov 2, 2025 | Nov 1, 2027 |
| W912HQ25C0015 ↗ | ESTCP PROJECT CR24-8407 "ASSESSMENT OF DECADAL CLIMATE PREDICTIONS IN SUPPORT OF DOD ACTIVITIES TO BRIDGE ACROSS THE WEATHER-TO-CLIMATE CONTINUUM" FOR ANALYSIS AND PREDICTION OF CLIMATE DYNAMICS ON WEATHER-TO-CLIMATE SCALES. | Department Of The Army | 541715 | $868K | Dec 11, 2024 | Dec 10, 2027 |
| 80GSFC19C0027 ↗ | REMOVAL OF CLAUSES/DRDS IAW EO 14035 - INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) FOR SMD DIRECTORATE | National Aeronautics And Space Administration | 541715 | $34.0M | Dec 17, 2018 | Jan 30, 2028 |
| W912HQ25P0029 ↗ | SERDP PROJECT RC25-4949 "ADVANCING CONSERVATION THROUGH A SYNERGY OF DRONE-BASED REMOTE SENSING AND FINE SCALE MODELING: DE-TANGLING TOPOGRAPHY, SOIL MOISTURE AND SHALLOW GROUNDWATER ON VEGETATION RESILIENCY" | Department Of The Army | 541715 | $141K | Mar 2, 2025 | Mar 1, 2028 |
Largest awards
- DEAC0209CH11466 ↗$365.3M
MANAGEMENT AND OPERATING CONTRACT FOR THE MANAGEMENT AND OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL).
- Ends
- Mar 30, 2027
- Started
- Jan 30, 2009
- Agency
- Department Of Energy
- NAICS
- 611310
- 80GSFC19C0027 ↗$34.0M
REMOVAL OF CLAUSES/DRDS IAW EO 14035 - INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) FOR SMD DIRECTORATE
- Ends
- Jan 30, 2028
- Started
- Dec 17, 2018
- Agency
- National Aeronautics And Space Administration
- NAICS
- 541715
- NNG17FC93C ↗$1.8M
THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
- Ends
- Sep 29, 2026
- Started
- Mar 22, 2017
- Agency
- National Aeronautics And Space Administration
- NAICS
- 334511
- W912HQ25C0015 ↗$868K
ESTCP PROJECT CR24-8407 "ASSESSMENT OF DECADAL CLIMATE PREDICTIONS IN SUPPORT OF DOD ACTIVITIES TO BRIDGE ACROSS THE WEATHER-TO-CLIMATE CONTINUUM" FOR ANALYSIS AND PREDICTION OF CLIMATE DYNAMICS ON WEATHER-TO-CLIMATE SCALES.
- Ends
- Dec 10, 2027
- Started
- Dec 11, 2024
- Agency
- Department Of The Army
- NAICS
- 541715
- W912HQ26PA002 ↗$250K
SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I
- Ends
- Nov 1, 2027
- Started
- Nov 2, 2025
- Agency
- Department Of The Army
- NAICS
- 541715
- W912HQ25P0029 ↗$141K
SERDP PROJECT RC25-4949 "ADVANCING CONSERVATION THROUGH A SYNERGY OF DRONE-BASED REMOTE SENSING AND FINE SCALE MODELING: DE-TANGLING TOPOGRAPHY, SOIL MOISTURE AND SHALLOW GROUNDWATER ON VEGETATION RESILIENCY"
- Ends
- Mar 1, 2028
- Started
- Mar 2, 2025
- Agency
- Department Of The Army
- NAICS
- 541715
RESEARCH SUPPORT SERVICES
- Ends
- Apr 29, 2027
- Started
- Jul 10, 2025
- Agency
- Smithsonian Institution
- NAICS
- 611310
BAA-24-0040 PROBABILISTIC PREDICTIONS OF RAINFALL ASSOCIATED WITH TROPICAL CYCLONES OVER LAND
- Ends
- May 29, 2028
- Started
- Aug 22, 2024
- Agency
- Department Of The Army
- NAICS
- 541715
- 75F40122C00186 ↗$-645K
EOI:: {TERMINATION FOR CONVENIENCE} ::EOI {CONTRACT TERMINATION}
- Ends
- Mar 30, 2025
- Started
- Sep 28, 2022
- Agency
- Food And Drug Administration
- NAICS
- 541714
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| DEAC0209CH11466 ↗ | MANAGEMENT AND OPERATING CONTRACT FOR THE MANAGEMENT AND OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL). | Department Of Energy | 611310 | $365.3M | Jan 30, 2009 | Mar 30, 2027 |
| 80GSFC19C0027 ↗ | REMOVAL OF CLAUSES/DRDS IAW EO 14035 - INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) FOR SMD DIRECTORATE | National Aeronautics And Space Administration | 541715 | $34.0M | Dec 17, 2018 | Jan 30, 2028 |
| NNG17FC93C ↗ | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | National Aeronautics And Space Administration | 334511 | $1.8M | Mar 22, 2017 | Sep 29, 2026 |
| W912HQ25C0015 ↗ | ESTCP PROJECT CR24-8407 "ASSESSMENT OF DECADAL CLIMATE PREDICTIONS IN SUPPORT OF DOD ACTIVITIES TO BRIDGE ACROSS THE WEATHER-TO-CLIMATE CONTINUUM" FOR ANALYSIS AND PREDICTION OF CLIMATE DYNAMICS ON WEATHER-TO-CLIMATE SCALES. | Department Of The Army | 541715 | $868K | Dec 11, 2024 | Dec 10, 2027 |
| W912HQ26PA002 ↗ | SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I | Department Of The Army | 541715 | $250K | Nov 2, 2025 | Nov 1, 2027 |
| W912HQ25P0029 ↗ | SERDP PROJECT RC25-4949 "ADVANCING CONSERVATION THROUGH A SYNERGY OF DRONE-BASED REMOTE SENSING AND FINE SCALE MODELING: DE-TANGLING TOPOGRAPHY, SOIL MOISTURE AND SHALLOW GROUNDWATER ON VEGETATION RESILIENCY" | Department Of The Army | 541715 | $141K | Mar 2, 2025 | Mar 1, 2028 |
| 33330525P00507914 ↗ | RESEARCH SUPPORT SERVICES | Smithsonian Institution | 611310 | $57K | Jul 10, 2025 | Apr 29, 2027 |
| W912HZ24C0048 ↗ | BAA-24-0040 PROBABILISTIC PREDICTIONS OF RAINFALL ASSOCIATED WITH TROPICAL CYCLONES OVER LAND | Department Of The Army | 541715 | $0 | Aug 22, 2024 | May 29, 2028 |
| 75F40122C00186 ↗ | EOI:: {TERMINATION FOR CONVENIENCE} ::EOI {CONTRACT TERMINATION} | Food And Drug Administration | 541714 | $-645K | Sep 28, 2022 | Mar 30, 2025 |