Olgoonik Enterprises, LLC
UEI NTJRK3T2CKN7 · CO · SAM.gov record ↗
$97.1M
FY2025 obligations
221
Contract awards
Feb 21, 2019
First action
Jun 24, 2026
Latest action
Obligations by agency
- Department Of Defense$82.6M
- General Services Administration$9.9M
- Department Of Commerce$4.6M
- Department Of Homeland Security$0
Obligations by NAICS
Monthly obligations
Oct 24
Nov 24
Dec 24
Jan 25
Feb 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Oct 25
Nov 25
Dec 25
Jan 26
Feb 26
Mar 26
Apr 26
May 26
Jun 26
Contracts ending within 18 months (recompete watch)
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| FA251725F0067 ↗ | TDKA 21-1003 REPAIR HVAC B361 | Department Of The Air Force | 236220 | $714K | May 28, 2025 | Jul 16, 2026 |
| FA251726FC015 ↗ | ELECTRICAL STORAGE YARD | Department Of The Air Force | 236220 | $229K | Mar 29, 2026 | Jul 19, 2026 |
| 47PD5126F0181 ↗ | WATER MAIN REPAIRS AT THE DENVER FEDERAL CENTER IN DENVER, CO | Public Buildings Service | 236220 | $65K | May 26, 2026 | Jul 23, 2026 |
| FA251725F0069 ↗ | SAXC-22-1013 HEMP FUEL LINE | Department Of The Air Force | 236220 | $310K | Jun 23, 2025 | Jul 26, 2026 |
| FA254325F0008 ↗ | THE EXISTING TRANE CHILLER IS DUE FOR A LIFECYCLE REPLACEMENT. IT USES A PHASED-OUT REFRIGERANT, AND THE CONDITION HAS DETERIORATED. THIS PROJECT WILL REPLACE THE CHILLER AND SOME ASSOCIATED COMPONENTS TO ENSURE RELIABLE COOLING FOR THE BUILDING. | Department Of The Air Force | 236220 | $658K | Apr 21, 2025 | Jul 29, 2026 |
| FA251725F0077 ↗ | REPAIR OF B617 AT CMSFS | Department Of The Air Force | 236220 | $342K | Jul 29, 2025 | Jul 29, 2026 |
| FA254323F0041 ↗ | THE REQUIREMENT IS TO CREATE ADDITIONAL CONTROLLED SPACE AS DEFINED BY INTELLIGENCE COMMUNITY STANDARD (ICS) 705-1 AND AIR FORCE INSTRUCTION (AFI) 32-1020, PARAGRAPH 2.7.9.2 TO SUPPORT OPERATIONAL TRAINING REQUIREMENTS IN ROOMS 100 A-F AND 120. | Department Of The Air Force | 236220 | $0 | Oct 4, 2023 | Jul 30, 2026 |
| 1333ND25FNB190264 ↗ | OU19-25-NEW-344 BUILDING 81 1D100 RENOVATION: INSTALL A NEW OPENING BETWEEN ADJACENT LABS IN BUILDING 81 TO IMPROVE WORK EFFICIENCY | National Institute Of Standards And Technology | 236220 | $88K | Sep 17, 2025 | Aug 8, 2026 |
| FA251725F0130 ↗ | REPAIRS/MODIFICATIONS TO EXISTING ROOMS TO CONVERT TWO OFFICES INTO A SERVER ROOM, NEWLY CONFIGURED OFFICES IN ADJACENT SPACE, NEW CHILLER FOR SERVER ROOM, MODIFICATIONS TO EXISTING CLASSROOMS TO INCLUDE NEW FURNITURE LAYOUT. | Department Of The Air Force | 236220 | $2.7M | Sep 15, 2025 | Aug 21, 2026 |
| 1333ND21CNB190042 ↗ | OU19-25-NEW-240 ADMINISTRATIVE MODIFICATION TO EXTEND THE COMPLETION DATE IN THE PROCUREMENT SYSTEM TO ALLOW TIME TO FINALIZE ANOTHER MODIFICATION FOR WITHIN-SCOPE SUPPLEMENTAL WORK. | National Institute Of Standards And Technology | 236220 | $159K | Sep 14, 2021 | Aug 25, 2026 |
Largest awards
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W50S6V25FA001 ↗ | CONSTRUCT CORROSION CONTROL FACILITY CRWU 13-3039 | Department Of The Army | 236220 | $13.4M | Oct 23, 2024 | Mar 1, 2027 |
| FA251725F0007 ↗ | RENOVATE HANGER 140 | Department Of The Air Force | 236220 | $11.8M | Dec 15, 2024 | Jun 4, 2026 |
| 47PJ0025F0185 ↗ | AWARD OF CONSTRUCTION CONTRACT TO REPAIR AND REPLACE BRIDGES AT THE DENVER FEDERAL CENTER | Public Buildings Service | 236220 | $6.8M | Jul 1, 2025 | Jun 11, 2027 |
| FA251725F0129 ↗ | FENCE LINE CMSFS AND PSFB THE CE POCS ARE: CMSFS: SHAY GRINT, [email protected] PSFB: STEVE NERG, [email protected] | Department Of The Air Force | 236220 | $5.4M | Sep 29, 2025 | Apr 2, 2027 |
| FA251725F0172 ↗ | CMSFS REPAIR/UPGRADE FIRE PROTECTION SYSTEM | Department Of The Air Force | 236220 | $5.1M | Sep 29, 2025 | Sep 18, 2029 |
| FA251725F0088 ↗ | B920 HVAC - REPLACE CHILLERS IAW THE MOST CURRENT VERSION OF THE STATEMENT OF WORK. | Department Of The Air Force | 236220 | $4.6M | Jul 30, 2025 | Jul 3, 2027 |
| FA255025F0063 ↗ | JOINT FORCES PAVING FOR COLORADO DEPARTMENT OF DEFENSE INSTALLATIONS | Department Of The Air Force | 237310 | $3.3M | Oct 14, 2025 | Oct 8, 2026 |
| FA254325F0037 ↗ | ASPEN ST. REHAB: ASPHALT OVERLAY, CRACK REPAIR, FULL-DEPTH AND CURB/GUTTER WORK. MULTIPLE SEGMENTS (KEYSTONE-STEAMBOAT, ETC.). INCLUDES GEO-MEMBRANE. SEE SOW 7/3/25 FOR DETAILS/LOCATIONS. | Department Of The Air Force | 237310 | $3.1M | Oct 7, 2025 | Oct 7, 2026 |
| FA251723F0120 ↗ | THE FRONT RANGE FEDERAL INSTALLATIONS HAVE A REQUIREMENT FOR A MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) TO SUPPORT A BROAD RANGE OF DESIGN-BID-BUILD/DESIGN-BUILD SERVICES UP TO 100% AND MAINTENANCE, REPAIR AND MINOR CONSTRUCTION WORK ON REAL PROPE | Department Of The Air Force | 236220 | $3.0M | Jul 31, 2023 | Apr 25, 2027 |
| FA251725F0130 ↗ | REPAIRS/MODIFICATIONS TO EXISTING ROOMS TO CONVERT TWO OFFICES INTO A SERVER ROOM, NEWLY CONFIGURED OFFICES IN ADJACENT SPACE, NEW CHILLER FOR SERVER ROOM, MODIFICATIONS TO EXISTING CLASSROOMS TO INCLUDE NEW FURNITURE LAYOUT. | Department Of The Air Force | 236220 | $2.7M | Sep 15, 2025 | Aug 21, 2026 |
| FA251725F0035 ↗ | COMPLETE ALL WORK IAW THE SOW DATED 01/28/2025, AND ALL ATTACHMENTS. | Department Of The Air Force | 237310 | $1.7M | Mar 30, 2025 | Oct 21, 2026 |
| W911RZ25FA061 ↗ | THE PRIMARY SCOPE IS TO GRADE, PREPARE, AMEND SOIL, SOD AND/OR SEED THE STIE IN AND AROUND THE MCKIBBEN GYM TRACK. INCLUDING LANDSCAPING ROCK, TREES, SIDEWALKS, AND REMOVAL/REPLACEMENT OF THE PARKING LOT AT BUILDING B1161. | Department Of The Army | 237310 | $1.7M | Oct 20, 2025 | Jun 1, 2026 |
| FA461325F0007 ↗ | REPLACE AND REPAIR GAS LINES ON SABER ROAD IN ACCORDANCE WITH ATTACHED SOW, DRAWINGS AND ASSOCIATED DOCUMENTS. | Department Of The Air Force | 236220 | $1.5M | Oct 29, 2024 | May 31, 2026 |
| FA251725F0154 ↗ | REPAIR BLDG 1142 IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | Department Of The Air Force | 236220 | $1.4M | Sep 14, 2025 | Sep 23, 2026 |
| FA254325F0034 ↗ | REPLACE THE EXISTING PRESSURE RELIEF VALVE, ALLOWING THE CONSTRUCTION OF A NEW ADDITIONAL WATER MAIN FEED TO BE PIPED INTO THE RA. THIS NEW WATER MAIN FEED WILL CONNECT TO THE CURRENTLY EXISTING WATER SUPPLY NETWORK IN THE RA. | Department Of The Air Force | 236220 | $1.1M | Sep 29, 2025 | Apr 27, 2026 |
| FA251725F0164 ↗ | CMSFS REPAIR HVAC RM 3101/2 | Department Of The Air Force | 236220 | $1.1M | Sep 22, 2025 | Sep 22, 2026 |
| 1333ND25FNB190225 ↗ | OU19-25-NEW-172 BUILDING 1 SANITARY SEWER REPLACEMENT | National Institute Of Standards And Technology | 236220 | $1.1M | Oct 31, 2025 | Oct 30, 2026 |
| FA700025F0059 ↗ | THIS FIRM-FIXED-PRICE TASK ORDER IS FOR PROJECT XQPZ 16-0140 SUSTAIN REPAIR ELEVATORS - BUILDINGS 5220, 5234, 5216, 5218, AND 49001. | Department Of The Air Force | 236220 | $992K | Mar 11, 2025 | May 4, 2026 |
| FA254325F0039 ↗ | THE PROJECT WILL REPLACE FOUR CRAC UNITS LOCATED IN B390 WITH RELIABLE CRAC UNITS THAT PROPERLY COOL OFF THEIR RESPECTIVE SERVER ROOMS. REFER TO THE STATEMENT OF WORK FOR ADDITIONAL INFORMATION. | Department Of The Air Force | 236220 | $991K | Oct 8, 2025 | Jul 5, 2026 |
| FA251725F0142 ↗ | CONSTRUCTION WORK ALONG THE FRONT RANGE INCLUDE, BUT NOT LIMITED TO: FORT CARSON ARMY BASE (FCAB) CHEYENNE MOUNTAIN AIR FORCE STATION (CMAFS) PETERSON AIR FORCE BASE (PAFB) SCHRIEVER AIR FORCE BASE (SAFB) UNITED STATES AIR FORCE ACADEMY (USAFA) | Department Of The Air Force | 236220 | $969K | Sep 21, 2025 | Sep 21, 2026 |
| 1333ND24FNB190047 ↗ | ADMINISTRATIVE MODIFICATION TO UPDATE LINES OF ACCOUNTING. | National Institute Of Standards And Technology | 236220 | $933K | Jan 29, 2024 | Aug 30, 2026 |
| W911RZ25FA009 ↗ | PROJECT TEN23-011 INVOLVES REPAIRING THE PARKING LOT AT BUILDING 1140. THE SCOPE OF WORK INCLUDES REMOVING AND REPLACING THE CONCRETE PARKING LOT AND SIDEWALK ON THE NORTH SIDE OF THE BUILDING. | Department Of The Army | 237310 | $895K | May 10, 2025 | Feb 11, 2026 |
| 1333ND24FNB190250 ↗ | ADMINISTRATIVE MODIFICATION TO PERIOD OF PERFORMANCE | National Institute Of Standards And Technology | 236220 | $882K | Sep 30, 2024 | Jul 29, 2027 |
| W911RZ23F0124 ↗ | MODIFICATION TO ADDRESS REQUIRED ARCHITECTURAL AND ELECTRICAL SCOPE CHANGES DUE FOR UNFORESEEN SITE CONDITIONS. | Department Of The Army | 236220 | $879K | Sep 24, 2023 | May 28, 2026 |
| FA251725F0147 ↗ | TDKA 24-1013 REPAIR BACK PARKING LOT, B3 IAW STATEMENT OF WORK DATED 25 AUGUST 2025 | Department Of The Air Force | 236220 | $858K | Sep 15, 2025 | Dec 25, 2025 |