Columbus Barricades, INC
UEI P8NLNNTHZ3L9 · GA · SAM.gov record ↗
Obligations by agency
- Department Of Defense$9.5M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- W911SF25FA126 ↗$841K
REPAIR SIGHTSEEING ROAD CULVERT AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 15, 2026
- Started
- Sep 16, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA130 ↗$527K
REPAIR OUTFALL, LEGACY BLVD.
- Ends
- Sep 15, 2026
- Started
- Sep 17, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA128 ↗$572K
REPAIR LINDSEY CREEK SHOULDERS, ACP TO UPATOI CREEK AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 16, 2026
- Started
- Sep 17, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA127 ↗$267K
REPAIR HOURGLASS ROAD, TRICOLOR ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA124 ↗$2.0M
REPAIR JECELIN, 82ND DIVISION ROAD, SHOULDER IMPROVEMENTS AND BIKE LANE ADDITION AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA137 ↗$914K
CONSTRUCT SIDEWALK, 2ND ARMOR DIVISION ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA136 ↗$357K
REPAVE INTERIOR ASP ROADS, B6000.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF23F0170 ↗$337K
INSTALL DAVIS HILL RECREATION TRAIL REPAIRS AS STATED IN THE STATEMENT OF WORK (SOW).
- Ends
- Sep 20, 2026
- Started
- Sep 6, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA148 ↗$1.2M
REPAIR LINDSEY CREEK SHOULDERS, UPATOI CREEK TO MARNE ROAD AS SHOWN IN THE 5% DESIGN DRAWINGS PER THE STATEMENT OF WORK.
- Ends
- Sep 27, 2026
- Started
- Sep 28, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
POP MOD
- Ends
- Dec 30, 2026
- Started
- Sep 29, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W911SF25FA126 ↗ | REPAIR SIGHTSEEING ROAD CULVERT AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $841K | Sep 16, 2025 | Sep 15, 2026 |
| W911SF25FA130 ↗ | REPAIR OUTFALL, LEGACY BLVD. | Department Of The Army | 237310 | $527K | Sep 17, 2025 | Sep 15, 2026 |
| W911SF25FA128 ↗ | REPAIR LINDSEY CREEK SHOULDERS, ACP TO UPATOI CREEK AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $572K | Sep 17, 2025 | Sep 16, 2026 |
| W911SF25FA127 ↗ | REPAIR HOURGLASS ROAD, TRICOLOR ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $267K | Sep 18, 2025 | Sep 17, 2026 |
| W911SF25FA124 ↗ | REPAIR JECELIN, 82ND DIVISION ROAD, SHOULDER IMPROVEMENTS AND BIKE LANE ADDITION AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $2.0M | Sep 18, 2025 | Sep 17, 2026 |
| W911SF25FA137 ↗ | CONSTRUCT SIDEWALK, 2ND ARMOR DIVISION ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $914K | Sep 18, 2025 | Sep 17, 2026 |
| W911SF25FA136 ↗ | REPAVE INTERIOR ASP ROADS, B6000. | Department Of The Army | 237310 | $357K | Sep 18, 2025 | Sep 17, 2026 |
| W911SF23F0170 ↗ | INSTALL DAVIS HILL RECREATION TRAIL REPAIRS AS STATED IN THE STATEMENT OF WORK (SOW). | Department Of The Army | 237310 | $337K | Sep 6, 2023 | Sep 20, 2026 |
| W911SF25FA148 ↗ | REPAIR LINDSEY CREEK SHOULDERS, UPATOI CREEK TO MARNE ROAD AS SHOWN IN THE 5% DESIGN DRAWINGS PER THE STATEMENT OF WORK. | Department Of The Army | 237310 | $1.2M | Sep 28, 2025 | Sep 27, 2026 |
| W911SF24F0191 ↗ | POP MOD | Department Of The Army | 237310 | $0 | Sep 29, 2024 | Dec 30, 2026 |
Largest awards
- W911SF25FA124 ↗$2.0M
REPAIR JECELIN, 82ND DIVISION ROAD, SHOULDER IMPROVEMENTS AND BIKE LANE ADDITION AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA102 ↗$1.3M
REPAIR MOTOR POOL, BUILDING 2781 AS SHOWN IN THE 35% DESIGN DRAWINGS AND PER THE SCOPE OF WORK.
- Ends
- Aug 30, 2026
- Started
- Aug 31, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA148 ↗$1.2M
REPAIR LINDSEY CREEK SHOULDERS, UPATOI CREEK TO MARNE ROAD AS SHOWN IN THE 5% DESIGN DRAWINGS PER THE STATEMENT OF WORK.
- Ends
- Sep 27, 2026
- Started
- Sep 28, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA137 ↗$914K
CONSTRUCT SIDEWALK, 2ND ARMOR DIVISION ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA126 ↗$841K
REPAIR SIGHTSEEING ROAD CULVERT AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 15, 2026
- Started
- Sep 16, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25F0022 ↗$574K
REPAVE RYKUS AVE AND GRAVEL ROADS
- Ends
- Jul 10, 2025
- Started
- Feb 23, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA128 ↗$572K
REPAIR LINDSEY CREEK SHOULDERS, ACP TO UPATOI CREEK AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 16, 2026
- Started
- Sep 17, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA130 ↗$527K
REPAIR OUTFALL, LEGACY BLVD.
- Ends
- Sep 15, 2026
- Started
- Sep 17, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA104 ↗$361K
REPAIR KALL RIVER TANK DRIVERS COURSE AS SHOWN IN THE 35% DRAWINGS AND SKETCHES PER THE SCOPE OF WORK.
- Ends
- Sep 3, 2026
- Started
- Sep 4, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA136 ↗$357K
REPAVE INTERIOR ASP ROADS, B6000.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF23F0170 ↗$337K
INSTALL DAVIS HILL RECREATION TRAIL REPAIRS AS STATED IN THE STATEMENT OF WORK (SOW).
- Ends
- Sep 20, 2026
- Started
- Sep 6, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA127 ↗$267K
REPAIR HOURGLASS ROAD, TRICOLOR ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS.
- Ends
- Sep 17, 2026
- Started
- Sep 18, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF23F0162 ↗$172K
RESTRIPE PARKING LOT B6. THIS IS A MODIFICATION TO EXTEND THE POP TO 30 JUNE 2026.
- Ends
- Jun 29, 2026
- Started
- Aug 24, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF25FA026 ↗$64K
IAW THE SOW ATTACHED FURNISH ALL LABOR, EQUIPMENT, INCIDENTALS SUPERVISION AND TRANSPORTATION FOR WORK NECESSARY TO GEOTECHNICAL ANALYSIS AND SURVEY SUPPORT FOR REPAIR ENGLISH RANGE DRAINAGE ISSUES SHOWN IN THE DESIGN DRAWINGS.
- Ends
- Jul 23, 2025
- Started
- Apr 24, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911SF23F0193 ↗$12K
REPAIR TENNIS AND PICKLEBALL COURT. MODIFICATION TO EXTEND THE POP TO 30 JUNE 2026.
- Ends
- Jun 29, 2026
- Started
- Sep 20, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
POP MOD
- Ends
- Dec 30, 2026
- Started
- Sep 29, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
REPAIR INSTALLATION ROADS RIORDAN STREET
- Ends
- Feb 2, 2025
- Started
- Aug 13, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
PERFORMANCE WORK STATEMENT FORGRADING, DRAINAGE AND PAVEMENTCONSTRUCTION, MAINTENANCE, AND REPAIRS POSTWIDEFORT MOORE, GEORGIAPART 1GENERAL INFORMATION1. GENERAL: THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, TRA
- Ends
- —
- Started
- May 16, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
REPAVE SIGHTSEEING RD/BENJAMIN ST
- Ends
- Mar 31, 2025
- Started
- Aug 14, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
REPAIR PRKG AREA HANGER ATC TOWER
- Ends
- Apr 6, 2025
- Started
- Sep 11, 2022
- Agency
- Department Of The Army
- NAICS
- 237310
3001 REPAIR COVERED BOX TRENCH SYSTEM
- Ends
- Apr 13, 2025
- Started
- Apr 3, 2022
- Agency
- Department Of The Army
- NAICS
- 237310
REPAIR LINCOLN & INGERSOLL
- Ends
- Apr 14, 2025
- Started
- Aug 9, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
PAVEMENT CONTRACT-BASE ORDERING PERIOD
- Ends
- Apr 14, 2025
- Started
- Sep 24, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
MODIFICATION TO EXTEND THE POP TO 27 FEB 2026
- Ends
- Feb 26, 2026
- Started
- Sep 26, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
MODIFICATION TO EXTEND THE POP TO 27 FEBRUARY 2026
- Ends
- Feb 26, 2026
- Started
- Sep 22, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W911SF25FA124 ↗ | REPAIR JECELIN, 82ND DIVISION ROAD, SHOULDER IMPROVEMENTS AND BIKE LANE ADDITION AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $2.0M | Sep 18, 2025 | Sep 17, 2026 |
| W911SF25FA102 ↗ | REPAIR MOTOR POOL, BUILDING 2781 AS SHOWN IN THE 35% DESIGN DRAWINGS AND PER THE SCOPE OF WORK. | Department Of The Army | 237310 | $1.3M | Aug 31, 2025 | Aug 30, 2026 |
| W911SF25FA148 ↗ | REPAIR LINDSEY CREEK SHOULDERS, UPATOI CREEK TO MARNE ROAD AS SHOWN IN THE 5% DESIGN DRAWINGS PER THE STATEMENT OF WORK. | Department Of The Army | 237310 | $1.2M | Sep 28, 2025 | Sep 27, 2026 |
| W911SF25FA137 ↗ | CONSTRUCT SIDEWALK, 2ND ARMOR DIVISION ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $914K | Sep 18, 2025 | Sep 17, 2026 |
| W911SF25FA126 ↗ | REPAIR SIGHTSEEING ROAD CULVERT AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $841K | Sep 16, 2025 | Sep 15, 2026 |
| W911SF25F0022 ↗ | REPAVE RYKUS AVE AND GRAVEL ROADS | Department Of The Army | 237310 | $574K | Feb 23, 2025 | Jul 10, 2025 |
| W911SF25FA128 ↗ | REPAIR LINDSEY CREEK SHOULDERS, ACP TO UPATOI CREEK AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $572K | Sep 17, 2025 | Sep 16, 2026 |
| W911SF25FA130 ↗ | REPAIR OUTFALL, LEGACY BLVD. | Department Of The Army | 237310 | $527K | Sep 17, 2025 | Sep 15, 2026 |
| W911SF25FA104 ↗ | REPAIR KALL RIVER TANK DRIVERS COURSE AS SHOWN IN THE 35% DRAWINGS AND SKETCHES PER THE SCOPE OF WORK. | Department Of The Army | 237310 | $361K | Sep 4, 2025 | Sep 3, 2026 |
| W911SF25FA136 ↗ | REPAVE INTERIOR ASP ROADS, B6000. | Department Of The Army | 237310 | $357K | Sep 18, 2025 | Sep 17, 2026 |
| W911SF23F0170 ↗ | INSTALL DAVIS HILL RECREATION TRAIL REPAIRS AS STATED IN THE STATEMENT OF WORK (SOW). | Department Of The Army | 237310 | $337K | Sep 6, 2023 | Sep 20, 2026 |
| W911SF25FA127 ↗ | REPAIR HOURGLASS ROAD, TRICOLOR ROAD AS SHOWN IN THE 35% DESIGN DRAWINGS. | Department Of The Army | 237310 | $267K | Sep 18, 2025 | Sep 17, 2026 |
| W911SF23F0162 ↗ | RESTRIPE PARKING LOT B6. THIS IS A MODIFICATION TO EXTEND THE POP TO 30 JUNE 2026. | Department Of The Army | 237310 | $172K | Aug 24, 2023 | Jun 29, 2026 |
| W911SF25FA026 ↗ | IAW THE SOW ATTACHED FURNISH ALL LABOR, EQUIPMENT, INCIDENTALS SUPERVISION AND TRANSPORTATION FOR WORK NECESSARY TO GEOTECHNICAL ANALYSIS AND SURVEY SUPPORT FOR REPAIR ENGLISH RANGE DRAINAGE ISSUES SHOWN IN THE DESIGN DRAWINGS. | Department Of The Army | 237310 | $64K | Apr 24, 2025 | Jul 23, 2025 |
| W911SF23F0193 ↗ | REPAIR TENNIS AND PICKLEBALL COURT. MODIFICATION TO EXTEND THE POP TO 30 JUNE 2026. | Department Of The Army | 237310 | $12K | Sep 20, 2023 | Jun 29, 2026 |
| W911SF24F0191 ↗ | POP MOD | Department Of The Army | 237310 | $0 | Sep 29, 2024 | Dec 30, 2026 |
| W911SF23F0140 ↗ | REPAIR INSTALLATION ROADS RIORDAN STREET | Department Of The Army | 237310 | $0 | Aug 13, 2023 | Feb 2, 2025 |
| W911SF23D0002 ↗ | PERFORMANCE WORK STATEMENT FORGRADING, DRAINAGE AND PAVEMENTCONSTRUCTION, MAINTENANCE, AND REPAIRS POSTWIDEFORT MOORE, GEORGIAPART 1GENERAL INFORMATION1. GENERAL: THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, TRA | Department Of The Army | 237310 | $0 | May 16, 2023 | — |
| W911SF23F0135 ↗ | REPAVE SIGHTSEEING RD/BENJAMIN ST | Department Of The Army | 237310 | $0 | Aug 14, 2023 | Mar 31, 2025 |
| W911SF22F0153 ↗ | REPAIR PRKG AREA HANGER ATC TOWER | Department Of The Army | 237310 | $0 | Sep 11, 2022 | Apr 6, 2025 |
| W911SF22F0031 ↗ | 3001 REPAIR COVERED BOX TRENCH SYSTEM | Department Of The Army | 237310 | $0 | Apr 3, 2022 | Apr 13, 2025 |
| W911SF23F0134 ↗ | REPAIR LINCOLN & INGERSOLL | Department Of The Army | 237310 | $0 | Aug 9, 2023 | Apr 14, 2025 |
| W911SF23F0203 ↗ | PAVEMENT CONTRACT-BASE ORDERING PERIOD | Department Of The Army | 237310 | $0 | Sep 24, 2023 | Apr 14, 2025 |
| W911SF24F0133 ↗ | MODIFICATION TO EXTEND THE POP TO 27 FEB 2026 | Department Of The Army | 237310 | $0 | Sep 26, 2024 | Feb 26, 2026 |
| W911SF24F0123 ↗ | MODIFICATION TO EXTEND THE POP TO 27 FEBRUARY 2026 | Department Of The Army | 237310 | $0 | Sep 22, 2024 | Feb 26, 2026 |