Sky Blue Rme JV LLC
UEI UBT9TWZXJZ21 · CO · subsidiary of Sky Blue Builders LLC · SAM.gov record ↗
Obligations by agency
- Department Of Defense$16.3M
Obligations by NAICS
Monthly obligations
Contracts ending within 18 months (recompete watch)
- FA251725F0085 ↗$7.1M
COMMAND CENTER RE-PAVE PROJECT AT PETERSON SFB. POP IS 240 DAYS AFTER NTP.
- Ends
- Nov 17, 2026
- Started
- Jul 17, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| FA251725F0085 ↗ | COMMAND CENTER RE-PAVE PROJECT AT PETERSON SFB. POP IS 240 DAYS AFTER NTP. | Department Of The Air Force | 237310 | $7.1M | Jul 17, 2025 | Nov 17, 2026 |
Largest awards
- FA251725F0085 ↗$7.1M
COMMAND CENTER RE-PAVE PROJECT AT PETERSON SFB. POP IS 240 DAYS AFTER NTP.
- Ends
- Nov 17, 2026
- Started
- Jul 17, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA254323F0022 ↗$3.9M
THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
- Ends
- Jul 13, 2026
- Started
- Oct 31, 2023
- Agency
- Department Of The Air Force
- NAICS
- 237310
- W911RZ25FA039 ↗$2.6M
DPW24-017 RPR NELSON BLVD AT VISITOR CENTER AND HARR
- Ends
- Jun 3, 2026
- Started
- Aug 3, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911RZ25FA038 ↗$1.4M
DPW24-144 CONSISTS OF FULL DEPTH ASPHALT REPAIR OF ROADWAY AND REVISING TRAFFIC PATTERN WEST OF BUTTS RD-WILDERNESS RD TRAFFIC CIRCLE TO ADDRESS TRAFFIC CONFLICTS ENTERING AND EXITING SHOPPETTE AND RANGE CONTROL. ALL WORK CONDUCTED ON FT CARSON, CO.
- Ends
- May 28, 2026
- Started
- Aug 10, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911RZ24F0065 ↗$491K
DPW24-006 RPR HARDSTAND B2082: MOD TO INCREASE QTY SCOPE OF CONCRETE/CLASS 5 BASE COURSE REQUIRED TO ADDRESS UNFORESEEN SITE CONDITIONS AFTER DEMO.
- Ends
- Aug 11, 2025
- Started
- Feb 10, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911RZ25FA031 ↗$230K
CIV23-029 RPR, ENTRANCE TO TRIANGLE STORAGE YARD B8030
- Ends
- Feb 16, 2026
- Started
- Jun 9, 2025
- Agency
- Department Of The Army
- NAICS
- 237310
- W911RZ24F0023 ↗$222K
DPW24-074 REPAIR WORK: THIS IS A UNILATERAL CONTRACT MODIFICATION TO ALIGN THE PERIOD OF PERFORMANCE WITH THE NOTICE TO PROCEED. THE PERIOD OF PERFORMANCE IS 150 DAYS AND STARTS ON 17 MARCH 2025 AND ENDS ON 17 AUGUST 2025.
- Ends
- Sep 16, 2025
- Started
- Oct 20, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
- FA254322F0044 ↗$170K
MILL AND OVERLAY OF ROADS ALONG WITH THE REPAIR OF STORM WATER WAYS AND EDGE OF ROAD RADIUS FOR WINTER PARK AVE FROM LVIP TO WINTER PARK PL TO VAIL ST. AND ASPEN ST SB TO STEAMBOAT AVE TO KEYSTONE AVE TO DEVILS THUMB TO BRECKENRIDGE TO ASPEN WAY.
- Ends
- Jan 30, 2026
- Started
- Sep 21, 2022
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA254324F0005 ↗$135K
THE PURPOSE OF THIS REQUIREMENT IS TO CONSTRUCT A ROAD ON AN UNIMPROVED SECTION OF ROAD THAT BRANCHES OFF FROM THE ROADWAY TO THE GATE. THERE IS A CONTROLLED GATE AT THE EAST END OF BSFB THAT OPENS ONTO STATE ROUTE 30, AT THE INTERSECTION WITH SOUTH
- Ends
- Jul 30, 2026
- Started
- Nov 29, 2023
- Agency
- Department Of The Air Force
- NAICS
- 237310
- W911RZ24F0078 ↗$77K
DPW24-007 RPR, PARKING B756
- Ends
- May 12, 2025
- Started
- Jul 22, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
- FA254324F0030 ↗$52K
DEMOLISH LAKE WILLIAMS AND DAM TO BE COMPLETED IN THREE PHASES TO INCLUDE PRE-CONSTRUCTION PLANNING, DEMOLITION, AND RE-CONSTRUCTION OF NEW STORM WATER CHANNELS, SCULPTED CONCRETE DROP STRUCTURES, A NEW BOX CULVERT, AND WING WALLS AND FOUNDATIONS.
- Ends
- Jul 30, 2026
- Started
- Sep 30, 2024
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA254324F0004 ↗$12K
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, AND SUPERVISION NECESSARY TO PERFORM SLURRY SEAL, RESTRIPING, CRACK REPAIR AND POTHOLE REPAIR IN THE TWO PARKING LOTS AND THE DRIVE LANE AT B1030, THE EAST PARKING LOT OF B
- Ends
- Jul 30, 2026
- Started
- Dec 7, 2023
- Agency
- Department Of The Air Force
- NAICS
- 237310
- W911RZ24F0069 ↗$10K
REPAIR SPECKER AND PERSHING FIELD - MODIFICATION TO ADD CLIN 0002 FOR INLET GRATE CHANGE.
- Ends
- Jun 22, 2025
- Started
- Jul 29, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
- W911RZ24F0052 ↗$10K
BAA21-006 CNS, 2 DRIVE THRU GATES B9646
- Ends
- Jul 28, 2025
- Started
- Sep 25, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
JOINT FORCES PAVING FOR COLORADO DEPARTMENT OF DEFENSE INSTALLATIONS
- Ends
- —
- Started
- Feb 21, 2019
- Agency
- Department Of The Air Force
- NAICS
- 237310
REPAIR WORK
- Ends
- May 5, 2025
- Started
- Jul 28, 2024
- Agency
- Department Of The Army
- NAICS
- 237310
ARAPAHOE BASIN (A-BASIN) AVENUE, STARTING AT TELLURIDE STREET TO ASPEN STREET NEEDS A USABLE SIDEWALK IN ORDER FOR PEOPLE TO WALK FROM BASE HOUSING TO THE CHURCH AND TO ASPEN STREET. THE SLOPE OF THE DRIVE LANES TO THE CHURCH SHALL BE MODIFIED TO MEE
- Ends
- May 22, 2025
- Started
- Sep 29, 2022
- Agency
- Department Of The Air Force
- NAICS
- 237310
- W9128F23F0221 ↗$-8K
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00003 XQPZ 160403 REP. PARKING AREA COM. CTR.
- Ends
- Dec 18, 2024
- Started
- Sep 21, 2023
- Agency
- Department Of The Army
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| FA251725F0085 ↗ | COMMAND CENTER RE-PAVE PROJECT AT PETERSON SFB. POP IS 240 DAYS AFTER NTP. | Department Of The Air Force | 237310 | $7.1M | Jul 17, 2025 | Nov 17, 2026 |
| FA254323F0022 ↗ | THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S | Department Of The Air Force | 237310 | $3.9M | Oct 31, 2023 | Jul 13, 2026 |
| W911RZ25FA039 ↗ | DPW24-017 RPR NELSON BLVD AT VISITOR CENTER AND HARR | Department Of The Army | 237310 | $2.6M | Aug 3, 2025 | Jun 3, 2026 |
| W911RZ25FA038 ↗ | DPW24-144 CONSISTS OF FULL DEPTH ASPHALT REPAIR OF ROADWAY AND REVISING TRAFFIC PATTERN WEST OF BUTTS RD-WILDERNESS RD TRAFFIC CIRCLE TO ADDRESS TRAFFIC CONFLICTS ENTERING AND EXITING SHOPPETTE AND RANGE CONTROL. ALL WORK CONDUCTED ON FT CARSON, CO. | Department Of The Army | 237310 | $1.4M | Aug 10, 2025 | May 28, 2026 |
| W911RZ24F0065 ↗ | DPW24-006 RPR HARDSTAND B2082: MOD TO INCREASE QTY SCOPE OF CONCRETE/CLASS 5 BASE COURSE REQUIRED TO ADDRESS UNFORESEEN SITE CONDITIONS AFTER DEMO. | Department Of The Army | 237310 | $491K | Feb 10, 2025 | Aug 11, 2025 |
| W911RZ25FA031 ↗ | CIV23-029 RPR, ENTRANCE TO TRIANGLE STORAGE YARD B8030 | Department Of The Army | 237310 | $230K | Jun 9, 2025 | Feb 16, 2026 |
| W911RZ24F0023 ↗ | DPW24-074 REPAIR WORK: THIS IS A UNILATERAL CONTRACT MODIFICATION TO ALIGN THE PERIOD OF PERFORMANCE WITH THE NOTICE TO PROCEED. THE PERIOD OF PERFORMANCE IS 150 DAYS AND STARTS ON 17 MARCH 2025 AND ENDS ON 17 AUGUST 2025. | Department Of The Army | 237310 | $222K | Oct 20, 2024 | Sep 16, 2025 |
| FA254322F0044 ↗ | MILL AND OVERLAY OF ROADS ALONG WITH THE REPAIR OF STORM WATER WAYS AND EDGE OF ROAD RADIUS FOR WINTER PARK AVE FROM LVIP TO WINTER PARK PL TO VAIL ST. AND ASPEN ST SB TO STEAMBOAT AVE TO KEYSTONE AVE TO DEVILS THUMB TO BRECKENRIDGE TO ASPEN WAY. | Department Of The Air Force | 237310 | $170K | Sep 21, 2022 | Jan 30, 2026 |
| FA254324F0005 ↗ | THE PURPOSE OF THIS REQUIREMENT IS TO CONSTRUCT A ROAD ON AN UNIMPROVED SECTION OF ROAD THAT BRANCHES OFF FROM THE ROADWAY TO THE GATE. THERE IS A CONTROLLED GATE AT THE EAST END OF BSFB THAT OPENS ONTO STATE ROUTE 30, AT THE INTERSECTION WITH SOUTH | Department Of The Air Force | 237310 | $135K | Nov 29, 2023 | Jul 30, 2026 |
| W911RZ24F0078 ↗ | DPW24-007 RPR, PARKING B756 | Department Of The Army | 237310 | $77K | Jul 22, 2024 | May 12, 2025 |
| FA254324F0030 ↗ | DEMOLISH LAKE WILLIAMS AND DAM TO BE COMPLETED IN THREE PHASES TO INCLUDE PRE-CONSTRUCTION PLANNING, DEMOLITION, AND RE-CONSTRUCTION OF NEW STORM WATER CHANNELS, SCULPTED CONCRETE DROP STRUCTURES, A NEW BOX CULVERT, AND WING WALLS AND FOUNDATIONS. | Department Of The Air Force | 237310 | $52K | Sep 30, 2024 | Jul 30, 2026 |
| FA254324F0004 ↗ | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, AND SUPERVISION NECESSARY TO PERFORM SLURRY SEAL, RESTRIPING, CRACK REPAIR AND POTHOLE REPAIR IN THE TWO PARKING LOTS AND THE DRIVE LANE AT B1030, THE EAST PARKING LOT OF B | Department Of The Air Force | 237310 | $12K | Dec 7, 2023 | Jul 30, 2026 |
| W911RZ24F0069 ↗ | REPAIR SPECKER AND PERSHING FIELD - MODIFICATION TO ADD CLIN 0002 FOR INLET GRATE CHANGE. | Department Of The Army | 237310 | $10K | Jul 29, 2024 | Jun 22, 2025 |
| W911RZ24F0052 ↗ | BAA21-006 CNS, 2 DRIVE THRU GATES B9646 | Department Of The Army | 237310 | $10K | Sep 25, 2024 | Jul 28, 2025 |
| FA255019DA005 ↗ | JOINT FORCES PAVING FOR COLORADO DEPARTMENT OF DEFENSE INSTALLATIONS | Department Of The Air Force | 237310 | $0 | Feb 21, 2019 | — |
| W911RZ24F0079 ↗ | REPAIR WORK | Department Of The Army | 237310 | $0 | Jul 28, 2024 | May 5, 2025 |
| FA254322F0057 ↗ | ARAPAHOE BASIN (A-BASIN) AVENUE, STARTING AT TELLURIDE STREET TO ASPEN STREET NEEDS A USABLE SIDEWALK IN ORDER FOR PEOPLE TO WALK FROM BASE HOUSING TO THE CHURCH AND TO ASPEN STREET. THE SLOPE OF THE DRIVE LANES TO THE CHURCH SHALL BE MODIFIED TO MEE | Department Of The Air Force | 237310 | $0 | Sep 29, 2022 | May 22, 2025 |
| W9128F23F0221 ↗ | CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00003 XQPZ 160403 REP. PARKING AREA COM. CTR. | Department Of The Army | 237310 | $-8K | Sep 21, 2023 | Dec 18, 2024 |