AZ BL COLO 7528(1) Burro Creek Road
TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI
Description
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600
TONS Ditch Reconditioning: 2,000
LNFT Full Depth Reclamation: 1.3
MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175
LNFT Boulder: 100
EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027
ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
More active opportunities in NAICS 237310
- OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
- Deadline
- Nov 13, 2026(1d)
- Agency
- FEDERAL HIGHWAY ADMINISTRATION
- Type
- Solicitation
- NAICS
- 237310
- Posted
- Nov 10, 2026
- ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
- Deadline
- Nov 13, 2026(1d)
- Agency
- FEDERAL HIGHWAY ADMINISTRATION
- Type
- Solicitation
- NAICS
- 237310
- Posted
- Nov 10, 2026
- W9127827SC002 FY28 Horizontal Launch Infrastructure, SPOTFi (OTA) Progressive-Design-Build OT
- Deadline
- Nov 24, 2026(12d)
- Agency
- DEPT OF THE ARMY
- Type
- Special Notice
- NAICS
- 237310
- Posted
- Nov 10, 2026
- NAS WHITING FIELD AIRFIELD PAVEMENT REPAIRS
- Deadline
- Nov 24, 2026(12d)
- Agency
- DEPT OF THE NAVY
- Type
- Special Notice
- NAICS
- 237310
- Posted
- Nov 10, 2026
- AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements
- Deadline
- Dec 1, 2026(19d)
- Agency
- FEDERAL HIGHWAY ADMINISTRATION
- Type
- Solicitation
- NAICS
- 237310
- Posted
- Nov 10, 2026
| Title | Agency | Type | NAICS | Posted | Deadline |
|---|---|---|---|---|---|
| OK FW TSM 10(1) NFH Entrance Road and Parking Improvements | FEDERAL HIGHWAY ADMINISTRATION | Solicitation | 237310 | Nov 10, 2026 | Nov 13, 2026(1d) |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | FEDERAL HIGHWAY ADMINISTRATION | Solicitation | 237310 | Nov 10, 2026 | Nov 13, 2026(1d) |
| W9127827SC002 FY28 Horizontal Launch Infrastructure, SPOTFi (OTA) Progressive-Design-Build OT | DEPT OF THE ARMY | Special Notice | 237310 | Nov 10, 2026 | Nov 24, 2026(12d) |
| NAS WHITING FIELD AIRFIELD PAVEMENT REPAIRS | DEPT OF THE NAVY | Special Notice | 237310 | Nov 10, 2026 | Nov 24, 2026(12d) |
| AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements | FEDERAL HIGHWAY ADMINISTRATION | Solicitation | 237310 | Nov 10, 2026 | Dec 1, 2026(19d) |