FedQuery
ActiveCombined Synopsis/SolicitationTotal Small Business Set-Aside (FAR 19.5)

RFQ - 12.5-Ton Gas/Electric Rooftop Unit Package

DEPT OF DEFENSE › DEPT OF THE ARMY › W6QM MICC-FT DRUM

Solicitation #
W911S226U3282
Posted
May 19, 2026
Response deadline
May 28, 2026
Archive date
May 19, 2027
NAICS
PSC
4120
Place of performance
21702
Contact
Daniel Goldberg · [email protected]

Description

This requirement is for a complete, like-for-like replacement of an existing commercial rooftop unit, or RTU. The required equipment package must meet or exceed the following specifications. The base unit must be one 12.5-Ton Gas Heat and Electric Cooling Rooftop Unit with a 208-volt, 3-phase power supply. The unit must have single circuit, two-stage cooling with a minimum 10.8 EER or 15.0 IEER, and two-stage medium gas heat with a first stage of 180 MBH input and a second stage of 224 MBH input. It must also feature a high-static direct-drive vane axial fan, such as a Carrier EcoBlue or equivalent, and use a modern, low GWP refrigerant like R-454b. The package must also include the following compatible accessories: one Vertical Economizer with a controller, one Enthalpy sensor and harness for the economizer, and one standalone, two-stage programmable thermostat.

View on SAM.gov (attachments & response) ↗

More active opportunities in NAICS 423730

TitleAgencyTypeNAICSPostedDeadline
Air FiltersDEPT OF THE ARMYSolicitation423730Jul 14, 2026Jul 24, 2026(8d)
Spot Cooler PartsDEPT OF THE ARMYCombined Synopsis/Solicitation423730Jul 13, 2026Jul 20, 2026(4d)
ALASKA TWO POINT FIVE TON ENVIRONMENTAL CONTROL UNITDEPT OF THE ARMYCombined Synopsis/Solicitation423730Jul 9, 2026Jul 20, 2026(4d)
HVAC Air FiltersSTATE, DEPARTMENT OFSolicitation423730Jul 9, 2026Jul 24, 2026(8d)
FCI GILMER - CHILLER MOTOR & VFD PARTSFEDERAL PRISON SYSTEM / BUREAU OF PRISONSAward Notice423730Jul 8, 2026
RFQ - 12.5-Ton Gas/Electric Rooftop Unit Package · FedQuery