Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)

DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST OMAHA

Solicitation #
W9128F26RA017
Posted
Jun 29, 2026
Response deadline
Jul 8, 2026
Archive date
Mar 31, 2027
NAICS
PSC
Y1NZ
Place of performance
82001
Contact
Brandon Landis · [email protected]

Description

$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.

View on SAM.gov (attachments & response) ↗

More active opportunities in NAICS 237130

TitleAgencyTypeNAICSPostedDeadline
Launch Complex (LC) 39 Area Power Duct Bank ReplacementNATIONAL AERONAUTICS AND SPACE ADMINISTRATIONAward Notice237130Jul 16, 2026
ACRx Tesuque Peak and Sandia Crest, New MexicoFEDERAL BUREAU OF INVESTIGATIONCombined Synopsis/Solicitation237130Jul 15, 2026Jul 16, 2026(0d)
Y--Sidney Substation Breaker ReplacementENERGY, DEPARTMENT OFSolicitation237130Jul 15, 2026Jul 24, 2026(9d)
DDJC CENTRALIZED GAS AND ELECTIC METERING, TRACY, CADEPT OF THE ARMYSolicitation237130Jul 14, 2026Aug 13, 2026(28d)
Elden Mountain Communications Site RenovationENERGY, DEPARTMENT OFSolicitation237130Jul 13, 2026Aug 22, 2026(37d)
Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY) · FedQuery