4310--610 - COMPRESSORS Boiler Plant Bldg 76 - ENGINEERING, NIHCS Amendment to Answer Contractor Questions
VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › 250-NETWORK CONTRACT OFFICE 10 (36C250)
Description
RFQ 36C25026Q0889 Questions and Answers The solicitation references both VAAR 852.219-75 and 852.219-76 regarding the Limitations on Subcontracting certification. Which certification must be completed and submitted with our quotation, and where can we obtain the required form?
Answer: The VARR references concerning the Limitations on Subcontracting were mistakenly put in the RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. How will the limitation on subcontracting be calculated for this requirement, considering that it includes equipment, materials, removal, installation, electrical and mechanical connections, and startup services?
Answer: Limitations on subcontracting are not pertinent to this RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. The site-visit RSVP deadline is listed as Friday, August 29, 2026, but August 29 falls on a Saturday. Is the correct RSVP deadline Friday, August 28, or Saturday, August 29? Also, is attendance at the site visit mandatory to submit a responsive quotation?
Answer: The site-visit RSVP deadline is Friday, August 28, 2026. Attendance at the site visit is not mandatory. The Statement of Work identifies the RA-11I Fixed Speed 4 11KW compressor. Is this exact manufacturer and model required, or will an equal compressor meeting or exceeding the listed horsepower, PSI, CFM, electrical, and operational requirements be accepted?
Answer: All mention of any manufacturer verbiage has been removed from the RFQ. If an equivalent product is permitted, are there any additional specifications that must be met, including voltage, phase, tank size, dryer requirements, controls, connection sizes, or required manufacturer certifications?
Answer: There is no longer any mention of any exact manufacturer. The solicitation requires a manufacturer authorization letter when the prime contractor is not the manufacturer. Will a letter from the manufacturer confirming that our proposed supplier or installing subcontractor is an authorized dealer or distributor satisfy this requirement, or must the letter specifically name V Notary Service LLC as the authorized seller?
Answer: As stated in the RFQ, if a contractor is not the manufacturer of the products being offered, they must provide a letter/memo from the manufacturer stating they are authorized to sell/distribute the manufacturer s products. A letter/memo stating a subcontractor is authorized to sell/distribute the manufacturers products is not sufficient. The delivery schedule lists September 30, 2026, while the period of performance is October 1 through October 31, 2026. Should the two compressors and startup kits be delivered by September 30, with removal and installation performed during October?
Answer: Any mention of a period of performance has been removed. The contractor is required to complete the three (3) line items in the RFQ 60 days after receipt of the order (ARO). Please confirm whether any bid bond, payment bond, performance bond, prevailing-wage determination, or special insurance coverage is required for this procurement.
Answer: There is no requirement for any bid bond, payment bond, performance bond, prevailing wage determination, or special insurance coverage required for this requirement. Will payment be issued after the complete installation and acceptance of both compressors, or may the contractor invoice separately for delivered equipment and completed installation milestones?
Answer: Payment will be made after the delivery, installation and acceptance of the products. Progress payments are not authorized.
More active opportunities in NAICS 238220
- FEMA Region 2 Naval Weapons Station Earle Building C-54 HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse
- Deadline
- Sep 11, 2026(6d)
- Agency
- FEDERAL EMERGENCY MANAGEMENT AGENCY
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 4, 2026
- Inspect, test, repair, maintain, and ensure the operational readiness of all existing fire alarm systems, fire extinguishers, and backflow prevention devices
- Deadline
- Sep 14, 2026(9d)
- Agency
- NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
- Greenhouse Building Control System Repairs
- Deadline
- Sep 22, 2026(17d)
- Agency
- FOREST SERVICE
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
- Replacement of Air Conditioning Units in Nematology Lab
- Deadline
- Sep 22, 2026(17d)
- Agency
- FOREST SERVICE
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
- Desiccant Dehumidifier System Replacement Project Plant Material Center, Tucson, AZ
- Deadline
- Sep 16, 2026(11d)
- Agency
- FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
| Title | Agency | Type | NAICS | Posted | Deadline |
|---|---|---|---|---|---|
| FEMA Region 2 Naval Weapons Station Earle Building C-54 HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse | FEDERAL EMERGENCY MANAGEMENT AGENCY | Combined Synopsis/Solicitation | 238220 | Sep 4, 2026 | Sep 11, 2026(6d) |
| Inspect, test, repair, maintain, and ensure the operational readiness of all existing fire alarm systems, fire extinguishers, and backflow prevention devices | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 14, 2026(9d) |
| Greenhouse Building Control System Repairs | FOREST SERVICE | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 22, 2026(17d) |
| Replacement of Air Conditioning Units in Nematology Lab | FOREST SERVICE | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 22, 2026(17d) |
| Desiccant Dehumidifier System Replacement Project Plant Material Center, Tucson, AZ | FARM PRODUCTION AND CONSERVATION BUSINESS CENTER | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 16, 2026(11d) |