FedQuery
ActiveSolicitation

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

DEPT OF DEFENSE › DEPT OF THE ARMY › W07V ENDIST ST LOUIS

Solicitation #
W912P926RA004
Posted
Jul 14, 2026
Response deadline
Nov 16, 2026(124d)
Archive date
Sep 30, 2027
NAICS
PSC
Y1PZ
Place of performance
63389
Contact
Whitney Dee · [email protected]

Description

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at [email protected]. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email.

View on SAM.gov (attachments & response) ↗

More active opportunities in NAICS 237990

TitleAgencyTypeNAICSPostedDeadline
Kahauiki Stream Maintenance Dredging, Phase 2, Fort Shafter Flats, Oahu, HawaiiDEPT OF THE ARMYSolicitation237990Jul 16, 2026Jul 31, 2026(15d)
PHILLIPS RESERVOIRS REPAIRBUREAU OF LAND MANAGEMENTSolicitation237990Jul 16, 2026Jul 31, 2026(16d)
Mississippi River, RM 488.5-L, FC/MR&T, Channel Improvement, Ben Lomond Dike 2C Extension, and Baleshed Landing Dike 6 RaiseDEPT OF THE ARMYSpecial Notice237990Jul 15, 2026Aug 14, 2026(30d)
Cheesequake Creek East Jetty RehabilitationDEPT OF THE ARMYSolicitation237990Jul 15, 2026Aug 14, 2026(30d)
Z1LC--CTX Steam Tunnel RepairsVETERANS AFFAIRS, DEPARTMENT OFCombined Synopsis/Solicitation237990Jul 15, 2026Jul 22, 2026(7d)
LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP) · FedQuery