Boiler Inspection and Repairs
HOMELAND SECURITY, DEPARTMENT OF › FEDERAL LAW ENFORCEMENT TRAINING CENTER › FLETC PROCUREMENT CHELTENHAM OFFICE
Description
The Contractor shall perform a comprehensive inspection of all 13 gas boilers and calibrate the associated gas sensors. The Contractor must troubleshoot any conditions found that affect the proper operation of the boilers. Bidders are responsible for verifying all site conditions and quantities prior to bid submission. The Contractor shall provide a complete inspection and troubleshooting service, which includes: Submitting a detailed assessment checklist noting all deficiencies. Providing a line-item cost estimate to correct any identified deficiencies. Ensuring the inspection covers, at a minimum: Mounting, Isolators, and Filter Components Burner and Gas Train Breeching and Combustion Air Boiler Inspection and Chemical Treatment Fan functionality Sight Glass, Water Piping, Gas Piping, and associated valves Electrical connections, including disconnect switch and safety circuits Control systems, firing sequences, and interlocks Safety controls, flame safeguards, and low water cutout Pressure and temperature gauges Testing of the safety relief valve Calibrating all gas sensors and ensuring they communicate correctly with the Building Automation System (BAS).
More active opportunities in NAICS 238220
- FEMA Region 2 Naval Weapons Station Earle Building C-54 HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse
- Deadline
- Sep 11, 2026(6d)
- Agency
- FEDERAL EMERGENCY MANAGEMENT AGENCY
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 4, 2026
- Inspect, test, repair, maintain, and ensure the operational readiness of all existing fire alarm systems, fire extinguishers, and backflow prevention devices
- Deadline
- Sep 14, 2026(9d)
- Agency
- NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
- Greenhouse Building Control System Repairs
- Deadline
- Sep 22, 2026(17d)
- Agency
- FOREST SERVICE
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
- Replacement of Air Conditioning Units in Nematology Lab
- Deadline
- Sep 22, 2026(17d)
- Agency
- FOREST SERVICE
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
- Desiccant Dehumidifier System Replacement Project Plant Material Center, Tucson, AZ
- Deadline
- Sep 16, 2026(11d)
- Agency
- FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
- Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
- Posted
- Sep 3, 2026
| Title | Agency | Type | NAICS | Posted | Deadline |
|---|---|---|---|---|---|
| FEMA Region 2 Naval Weapons Station Earle Building C-54 HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse | FEDERAL EMERGENCY MANAGEMENT AGENCY | Combined Synopsis/Solicitation | 238220 | Sep 4, 2026 | Sep 11, 2026(6d) |
| Inspect, test, repair, maintain, and ensure the operational readiness of all existing fire alarm systems, fire extinguishers, and backflow prevention devices | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 14, 2026(9d) |
| Greenhouse Building Control System Repairs | FOREST SERVICE | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 22, 2026(17d) |
| Replacement of Air Conditioning Units in Nematology Lab | FOREST SERVICE | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 22, 2026(17d) |
| Desiccant Dehumidifier System Replacement Project Plant Material Center, Tucson, AZ | FARM PRODUCTION AND CONSERVATION BUSINESS CENTER | Combined Synopsis/Solicitation | 238220 | Sep 3, 2026 | Sep 16, 2026(11d) |