FedQuery
ActiveSolicitationNo Set aside used

Argon Piping Supply, Installation and Testing

ENERGY, DEPARTMENT OF › ENERGY, DEPARTMENT OF › FERMILAB - DOE CONTRACTOR

Solicitation #
73573
Posted
Jul 8, 2026
Response deadline
Jul 28, 2026(12d)
Archive date
Aug 11, 2026
NAICS
PSC
Y1JZ
Place of performance
Lead, SD, 57754
Contact
Jerry King · [email protected]

Description

July 8, 2026 - Attachment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attachmed link. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.

View on SAM.gov (attachments & response) ↗

More active opportunities in NAICS 236210

TitleAgencyTypeNAICSPostedDeadline
Travis AFB MACC BOADEPT OF THE AIR FORCESolicitation236210Jul 15, 2026May 16, 2025
NSWC BLDG 366 Lead Abatement and Lighting in Mech RoomDEPT OF THE NAVYSolicitation236210Jul 15, 2026Sep 2, 2026(49d)
CAAA Bldgs. 123, 3322, 3044 Multiple ProjectsDEPT OF THE NAVYSolicitation236210Jul 15, 2026Aug 12, 2026(28d)
Canon ProStream Press Installation Design BuildUNITED STATES GOVERNMENT PUBLISHING OFFICESolicitation236210Jul 15, 2026Aug 25, 2026(41d)
Water Infrastructure Improvements Arlington Heights, IL - PRESOLICITATIONDEPT OF THE ARMYPresolicitation236210Jul 14, 2026Jul 30, 2026(15d)
Argon Piping Supply, Installation and Testing · FedQuery