FedQuery
ActivePresolicitationTotal Small Business Set-Aside (FAR 19.5)

Lagoon Aeration

AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA FOREST SERVICE-SPOC EAST

Solicitation #
1141206
Posted
Nov 6, 2024
Response deadline
Nov 19, 2028(858d)
Archive date
Dec 4, 2028
NAICS
PSC
H146
Place of performance
Mammoth Cave, KY, 42259
Contact
Jordan Carlsen · [email protected]

Description

Work for this project requires the contractor to be responsible for for furnishing and supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized in the SOW:

1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect.

2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.

3. Furnish and install microbubble lagoon aeration system consisting of the following: a. Control panel with individual motor overload protection circuit breakers. b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each).

4. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure.

5. Furnish third-party inspection of electrical work included in this contract. The magnitude of this project is between $25,000.00 and $100,000.00 This Pre-solicitation Notice seeks to provide information to interested parties about potential opportunity to perform the construction, additions, alterations, or maintenance and repairs as described above. This Pre-solicitation Notice does not commit the Government to contract for any supply or service. Respondents are advised that the United States (U.S) Government will not pay for any information or administrative cost incurred in response to this Pre-solicitation Notice. All costs associated with responding to this Pre-solicitation Notice will be solely at the responding party's expense. Please be advised that all submissions become Government property and will not be returned. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. The solicitation will be on or about 20th November, no additional information is known at this time.

View on SAM.gov (attachments & response) ↗

More active opportunities in NAICS 221320

TitleAgencyTypeNAICSPostedDeadline
Sources Sought/Market Survey - Rough River Axtel Wastewater Treatment Plant ReplacementDEPT OF THE ARMYSources Sought221320Jul 14, 2026Jul 29, 2026(14d)
30--REPLACE LIFT STATION PUMPS AT HOZHO PT.NATIONAL PARK SERVICECombined Synopsis/Solicitation221320Jul 13, 2026Jul 14, 2026
Station Venice waste water treatmentUS COAST GUARDSolicitation221320Jul 10, 2026Jul 18, 2026(2d)
Fort Leavenworth Sewer ServicesDEPT OF THE ARMYJustification221320Jul 8, 2026
PRESOLICITATION NOTICE for Operation and Maintenance of Wastewater Treatment Plant at CFA YokosukaDEPT OF THE NAVYPresolicitation221320Jul 8, 2026
Lagoon Aeration · FedQuery