Replace AAS BAK-15 Controls, B2001, B2003
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA3022 14 CONS LGCA
Description
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The goal of this project is to bring the out-of-date control system currently operating the BAK-15 barriers on the outer runway up to date with a modern control system. The intent is to replace the existing radio signal controlled system with a new modern fiber controlled hard wire system. Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 4 Aug 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CST on 29 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CST on 29 Jul 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID." Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 9:00
AM CST Additional Info: All RFIs must be submitted NLT 7:30 AM CST, on 10 August 2026. IAW FAR 36.204(e) - The range of magnitude for this procurement is between $500,000 and $1,000,000. 52.232-18 Availability of Funds. Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
More active opportunities in NAICS 238210
| Title | Agency | Type | NAICS | Posted | Deadline |
|---|---|---|---|---|---|
| Datacenter Recabling - Install Receptacles | ENERGY, DEPARTMENT OF | Solicitation | 238210 | Jul 16, 2026 | Jul 29, 2026(14d) |
| Vehicle Gate Maintenance | DEPT OF THE ARMY | Presolicitation | 238210 | Jul 16, 2026 | Aug 4, 2026(20d) |
| Presolicitation- FCI Safford- Install Carbon Monoxide Detection System | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | Presolicitation | 238210 | Jul 15, 2026 | Aug 5, 2026(21d) |
| BPA CALL - Alaska Facilities Maintenance (FMAC) BPA - Marine Warehouse and floating dock Electrical Repairs | FOREST SERVICE | Special Notice | 238210 | Jul 15, 2026 | Aug 1, 2026(16d) |
| Sources Sought 36C78626Q50231 Install additional Cameras at Abraham Lincoln National Cemetery | VETERANS AFFAIRS, DEPARTMENT OF | Sources Sought | 238210 | Jul 15, 2026 | Jul 24, 2026(9d) |