Nwf Contractors INC
UEI F5NDARJLBKC6 · FL · SAM.gov record ↗
Obligations by agency
- Department Of Defense$5.8M
Obligations by NAICS
Monthly obligations
Largest awards
- FA441725F0278 ↗$1.7M
WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J
- Ends
- Mar 31, 2026
- Started
- Sep 29, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA248825FB013 ↗$495K
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023 - DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
- Ends
- Jan 27, 2026
- Started
- Sep 1, 2025
- Agency
- Department Of The Air Force
- NAICS
- 238110
- FA441725F0206 ↗$470K
REPAIR HOT WATER SUPPLY AND RETURN LINES ON THE BUILDING 1 BOILER
- Ends
- Dec 4, 2025
- Started
- Aug 17, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA248825FB008 ↗$398K
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
- Ends
- Oct 23, 2025
- Started
- Apr 23, 2025
- Agency
- Department Of The Air Force
- NAICS
- 238110
- FA248826FB003 ↗$382K
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023 - DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
- Ends
- Jun 9, 2026
- Started
- Mar 25, 2026
- Agency
- Department Of The Air Force
- NAICS
- 238110
- FA441726F0027 ↗$340K
REPAIR SPALLS AND CRACKS IN ACCORDANCE WITH THE ATTACHMENTS LISTED IN SECTION J
- Ends
- Jul 16, 2026
- Started
- Mar 24, 2026
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0222 ↗$300K
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
- Ends
- Mar 20, 2026
- Started
- Sep 1, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA248825FB007 ↗$277K
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
- Ends
- Jul 20, 2025
- Started
- Feb 19, 2025
- Agency
- Department Of The Air Force
- NAICS
- 238110
- FA441725F0119 ↗$196K
REPAIR SEVEN STORMWATER SYSTEMS AROUND HURLBURT FIELD, FLORIDA.
- Ends
- Mar 4, 2026
- Started
- May 28, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0017 ↗$195K
REPAINT RUNWAY EDGE LINES
- Ends
- Feb 17, 2025
- Started
- Jan 6, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441726F0015 ↗$165K
CP1145982 RUNWAY RUBBER REMOVAL 18/36
- Ends
- Mar 26, 2026
- Started
- Feb 12, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0199 ↗$161K
CP1144587 EOD ARMAG WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J.
- Ends
- Jan 8, 2026
- Started
- Aug 14, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0020 ↗$159K
THIS IS A TASK ORDER OFF OF THE CIVIL WORKS IDIQ CONTRACT FOR ANNUAL RUBBER REMOVAL REQUIREMENT
- Ends
- Apr 20, 2025
- Started
- Dec 31, 2024
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0272 ↗$131K
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, MATERIALS, FACILITIES, AND TRANSPORTATION NECESSARY TO REPAIR SEWER LINES, IAW THE DRAWINGS AND SPECIFICATIONS.
- Ends
- Mar 2, 2026
- Started
- Sep 17, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0262 ↗$107K
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
- Ends
- May 24, 2026
- Started
- Sep 25, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441726F0021 ↗$83K
THE CONTRACTOR SHALL REMARK/REPAINT AND MATCH ALL EXITING STRIPING AS INDICATED IN THE WORK DESCRIPTION WITHIN THE SOW AND AS SHOWN ON THE INCLUDED AIRFIELD SITE PLAN.
- Ends
- May 17, 2026
- Started
- Mar 1, 2026
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA248825FB004 ↗$74K
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
- Ends
- Mar 2, 2025
- Started
- Dec 17, 2024
- Agency
- Department Of The Air Force
- NAICS
- 238110
- FA441723F0320 ↗$72K
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
- Ends
- Feb 19, 2026
- Started
- Sep 11, 2023
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0211 ↗$58K
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR BY REPLACEMENT THE AUTOMATIC ACCESS GATE TO THE FLIGHTLINE.
- Ends
- Jan 14, 2026
- Started
- Aug 17, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0246 ↗$35K
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
- Ends
- Oct 18, 2025
- Started
- Sep 3, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0116 ↗$28K
REPLACE TWO CONCRETE SLABS ON RUNWAY 18/36
- Ends
- Jul 10, 2025
- Started
- May 11, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441725F0106 ↗$26K
DUKE FIELD RUNWAY FRICTION TEST
- Ends
- May 18, 2025
- Started
- Apr 28, 2025
- Agency
- Department Of The Air Force
- NAICS
- 237310
- FA441726F0033 ↗$24K
WORK PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) AND THE ATTACHMENTS IN SECTION J.
- Ends
- May 4, 2026
- Started
- Mar 18, 2026
- Agency
- Department Of The Air Force
- NAICS
- 237310
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
- Ends
- Dec 20, 2024
- Started
- Nov 5, 2024
- Agency
- Department Of The Air Force
- NAICS
- 238110
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
- Ends
- —
- Started
- Jul 14, 2024
- Agency
- Department Of The Air Force
- NAICS
- 237310
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| FA441725F0278 ↗ | WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J | Department Of The Air Force | 237310 | $1.7M | Sep 29, 2025 | Mar 31, 2026 |
| FA248825FB013 ↗ | CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023 - DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | Department Of The Air Force | 238110 | $495K | Sep 1, 2025 | Jan 27, 2026 |
| FA441725F0206 ↗ | REPAIR HOT WATER SUPPLY AND RETURN LINES ON THE BUILDING 1 BOILER | Department Of The Air Force | 237310 | $470K | Aug 17, 2025 | Dec 4, 2025 |
| FA248825FB008 ↗ | CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | Department Of The Air Force | 238110 | $398K | Apr 23, 2025 | Oct 23, 2025 |
| FA248826FB003 ↗ | CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023 - DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | Department Of The Air Force | 238110 | $382K | Mar 25, 2026 | Jun 9, 2026 |
| FA441726F0027 ↗ | REPAIR SPALLS AND CRACKS IN ACCORDANCE WITH THE ATTACHMENTS LISTED IN SECTION J | Department Of The Air Force | 237310 | $340K | Mar 24, 2026 | Jul 16, 2026 |
| FA441725F0222 ↗ | THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | Department Of The Air Force | 237310 | $300K | Sep 1, 2025 | Mar 20, 2026 |
| FA248825FB007 ↗ | CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | Department Of The Air Force | 238110 | $277K | Feb 19, 2025 | Jul 20, 2025 |
| FA441725F0119 ↗ | REPAIR SEVEN STORMWATER SYSTEMS AROUND HURLBURT FIELD, FLORIDA. | Department Of The Air Force | 237310 | $196K | May 28, 2025 | Mar 4, 2026 |
| FA441725F0017 ↗ | REPAINT RUNWAY EDGE LINES | Department Of The Air Force | 237310 | $195K | Jan 6, 2025 | Feb 17, 2025 |
| FA441726F0015 ↗ | CP1145982 RUNWAY RUBBER REMOVAL 18/36 | Department Of The Air Force | 237310 | $165K | Feb 12, 2025 | Mar 26, 2026 |
| FA441725F0199 ↗ | CP1144587 EOD ARMAG WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J. | Department Of The Air Force | 237310 | $161K | Aug 14, 2025 | Jan 8, 2026 |
| FA441725F0020 ↗ | THIS IS A TASK ORDER OFF OF THE CIVIL WORKS IDIQ CONTRACT FOR ANNUAL RUBBER REMOVAL REQUIREMENT | Department Of The Air Force | 237310 | $159K | Dec 31, 2024 | Apr 20, 2025 |
| FA441725F0272 ↗ | CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, MATERIALS, FACILITIES, AND TRANSPORTATION NECESSARY TO REPAIR SEWER LINES, IAW THE DRAWINGS AND SPECIFICATIONS. | Department Of The Air Force | 237310 | $131K | Sep 17, 2025 | Mar 2, 2026 |
| FA441725F0262 ↗ | THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | Department Of The Air Force | 237310 | $107K | Sep 25, 2025 | May 24, 2026 |
| FA441726F0021 ↗ | THE CONTRACTOR SHALL REMARK/REPAINT AND MATCH ALL EXITING STRIPING AS INDICATED IN THE WORK DESCRIPTION WITHIN THE SOW AND AS SHOWN ON THE INCLUDED AIRFIELD SITE PLAN. | Department Of The Air Force | 237310 | $83K | Mar 1, 2026 | May 17, 2026 |
| FA248825FB004 ↗ | CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | Department Of The Air Force | 238110 | $74K | Dec 17, 2024 | Mar 2, 2025 |
| FA441723F0320 ↗ | THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER | Department Of The Air Force | 237310 | $72K | Sep 11, 2023 | Feb 19, 2026 |
| FA441725F0211 ↗ | THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR BY REPLACEMENT THE AUTOMATIC ACCESS GATE TO THE FLIGHTLINE. | Department Of The Air Force | 237310 | $58K | Aug 17, 2025 | Jan 14, 2026 |
| FA441725F0246 ↗ | THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | Department Of The Air Force | 237310 | $35K | Sep 3, 2025 | Oct 18, 2025 |
| FA441725F0116 ↗ | REPLACE TWO CONCRETE SLABS ON RUNWAY 18/36 | Department Of The Air Force | 237310 | $28K | May 11, 2025 | Jul 10, 2025 |
| FA441725F0106 ↗ | DUKE FIELD RUNWAY FRICTION TEST | Department Of The Air Force | 237310 | $26K | Apr 28, 2025 | May 18, 2025 |
| FA441726F0033 ↗ | WORK PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) AND THE ATTACHMENTS IN SECTION J. | Department Of The Air Force | 237310 | $24K | Mar 18, 2026 | May 4, 2026 |
| FA248825FB001 ↗ | CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023 | Department Of The Air Force | 238110 | $6K | Nov 5, 2024 | Dec 20, 2024 |
| FA441724D0004 ↗ | THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL. | Department Of The Air Force | 237310 | $0 | Jul 14, 2024 | — |