Lockheed Martin Corporation
UEI HDHVQ4EF8A89 · CA · subsidiary of Lockheed Martin Corp · SAM.gov record ↗
$283.8M
FY2025 obligations
15
Contract awards
Jun 14, 1997
First action
Jun 29, 2026
Latest action
Obligations by agency
- Department Of Commerce$166.8M
- National Aeronautics And Space Administration$110.9M
- Department Of Defense$6.1M
Obligations by NAICS
Monthly obligations
Oct 24
Nov 24
Dec 24
Jan 25
Feb 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Oct 25
Nov 25
Dec 25
Jan 26
Feb 26
Mar 26
Apr 26
May 26
Jun 26
Contracts ending within 18 months (recompete watch)
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| N0024425PS064 ↗ | THE SPACECRAFT RESEARCH AND DESIGN CENTER (SRDC) REQUIRES TECHNICAL SUPPORT TO INVESTIGATE METHODS TO ADVANCE THE STATE-OF-THE-ART IN APPLICATIONS OF AI FOR HEL AUTOMATIC TARGETING, AIMPOINT SELECTION AND MAINTENANCE, AND BEAM CONTROL. | Department Of The Navy | 541512 | $70K | Jul 30, 2025 | Jul 30, 2026 |
| 80MSFC24CA015 ↗ | TECHNOLOGY MATURATION FOR ASTROPHYSICS SPACE TELESCOPES (TECHMAST) | National Aeronautics And Space Administration | 541715 | $3.3M | Sep 19, 2024 | Sep 18, 2026 |
| HR001124C0453 ↗ | SPACE WIRELESS ON-DEMAND OPTICAL POWER (SWOOP) | Defense Advanced Research Projects Agency | 541715 | $1.6M | Mar 24, 2024 | Sep 29, 2026 |
| NNM07AA01C ↗ | HINODE (FORMERLY KNOWN AS SOLAR B PHASE E)--FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS. THE HINODE PROGRAM IS A CONTINUATION OF A JOINT "INTERNATIONAL" VENTURE BETWEEN THE UNITED STATES, GREAT BRITAIN AND JAPAN TO ADVANCE OUR UNDERSTAN | National Aeronautics And Space Administration | 541710 | $4.1M | Feb 21, 2007 | Feb 27, 2027 |
| FA875024CB057 ↗ | KILLERWHALE | Department Of The Air Force | 541715 | $212K | Jul 23, 2024 | Apr 22, 2027 |
| 80GSFC21C0011 ↗ | MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A | National Aeronautics And Space Administration | 541715 | $77.0M | Apr 25, 2021 | Jun 30, 2027 |
| NNG09FA40C ↗ | INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | National Aeronautics And Space Administration | 541712 | $10.0M | Sep 30, 2009 | Sep 29, 2027 |
| NNG04EA00C ↗ | ATMOSPHERIC IMAGE ASSEMBLY MISSION OPERATIONS AND DATA ANALYSIS FOR THE NASA SOLAR DYNAMICS OBSERVATORY | National Aeronautics And Space Administration | 541710 | $6.6M | Nov 3, 2003 | Sep 29, 2027 |
Largest awards
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| 1305M224C0039 ↗ | NOAA/OMAO_PRODUCTION OF UP TO FOUR (4) FULLY MODIFIED C130J AIRCRAFT | National Oceanic And Atmospheric Administration | 336411 | $166.8M | Sep 29, 2024 | Sep 28, 2029 |
| 80GSFC21C0011 ↗ | MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A | National Aeronautics And Space Administration | 541715 | $77.0M | Apr 25, 2021 | Jun 30, 2027 |
| NNG09FA40C ↗ | INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | National Aeronautics And Space Administration | 541712 | $10.0M | Sep 30, 2009 | Sep 29, 2027 |
| 80GSFC26C0015 ↗ | HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES | National Aeronautics And Space Administration | 541715 | $8.8M | May 12, 2026 | May 11, 2029 |
| NNG04EA00C ↗ | ATMOSPHERIC IMAGE ASSEMBLY MISSION OPERATIONS AND DATA ANALYSIS FOR THE NASA SOLAR DYNAMICS OBSERVATORY | National Aeronautics And Space Administration | 541710 | $6.6M | Nov 3, 2003 | Sep 29, 2027 |
| N0017322C6001 ↗ | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE BY 15 DAYS. THE COST TO PERFORM THIS PERIOD OF PERFORMANCE EXTENSION WILL BE NEGOTIATED WITH THE PHASE B EXTENSION PROPOSAL, DATED 6 SEP 2024.POC:[email protected] | Department Of The Navy | 541715 | $4.2M | Dec 14, 2021 | Jun 29, 2026 |
| NNM07AA01C ↗ | HINODE (FORMERLY KNOWN AS SOLAR B PHASE E)--FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS. THE HINODE PROGRAM IS A CONTINUATION OF A JOINT "INTERNATIONAL" VENTURE BETWEEN THE UNITED STATES, GREAT BRITAIN AND JAPAN TO ADVANCE OUR UNDERSTAN | National Aeronautics And Space Administration | 541710 | $4.1M | Feb 21, 2007 | Feb 27, 2027 |
| 80MSFC24CA015 ↗ | TECHNOLOGY MATURATION FOR ASTROPHYSICS SPACE TELESCOPES (TECHMAST) | National Aeronautics And Space Administration | 541715 | $3.3M | Sep 19, 2024 | Sep 18, 2026 |
| HR001124C0453 ↗ | SPACE WIRELESS ON-DEMAND OPTICAL POWER (SWOOP) | Defense Advanced Research Projects Agency | 541715 | $1.6M | Mar 24, 2024 | Sep 29, 2026 |
| NNG07HW20C ↗ | SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT. THIS CONTRACT IS FOR THE DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE SUVI IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE SUVI INSTRUMENT PROVIDES A BROADBAND IMAGING IN THE EXTREME ULTRAVIOLET WAVELENGTH RANGE TO MONITOR THE ENTIRE DYNAMIC RANGE OF SOLAR FEATURES, FROM CORONAL HOLES TO FLARES, AS WELL AS THE ESTIMATE OF TEMPERATURE AND EMISSION MEASURE. THESE DATA ARE USED FOR GEOMAGNETIC STORM FORECASTS AND FORECASTS OF SOLAR ENERGETIC PARTICLE EVENTS RELATED TO FLARES. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE SUVI FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO SUVI EMULATORS (SUVIES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL SUVI MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | National Aeronautics And Space Administration | 541330 | $1.0M | Sep 23, 2007 | Apr 29, 2039 |
| NNG08HZ00C ↗ | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | National Aeronautics And Space Administration | 541330 | $425K | Dec 12, 2007 | Jun 24, 2039 |
| FA875024CB057 ↗ | KILLERWHALE | Department Of The Air Force | 541715 | $212K | Jul 23, 2024 | Apr 22, 2027 |
| N0024425PS064 ↗ | THE SPACECRAFT RESEARCH AND DESIGN CENTER (SRDC) REQUIRES TECHNICAL SUPPORT TO INVESTIGATE METHODS TO ADVANCE THE STATE-OF-THE-ART IN APPLICATIONS OF AI FOR HEL AUTOMATIC TARGETING, AIMPOINT SELECTION AND MAINTENANCE, AND BEAM CONTROL. | Department Of The Navy | 541512 | $70K | Jul 30, 2025 | Jul 30, 2026 |
| W911QY18D0099 ↗ | THE JOINT ENTERPRISE-RESEARCH, DEVELOPMENT, ACQUISITION AND PRODUCTION/PROCUREMENT (JE-RDAP) IS A MULTIPLE AWARD, ENTERPRISE-WIDE OMNIBUS IDIQ CONTRACT VEHICLE (HEREIN REFERRED TO AS THE JE-RDAP IDIQ CONTRACT). | Department Of The Army | 541715 | $0 | Oct 31, 2017 | — |
| GSFC0199708DNAS597181 ↗ | SOLAR X-RAY IMAGER INSTRUMENT | National Aeronautics And Space Administration | 541710 | $-291K | Jun 14, 1997 | Dec 30, 2021 |