NAICS 541710 · Research And Development In The Physical, Engineering, And Life Sciences
0 open opportunities · 206 FY2025 awards · $8.58B obligated
Top contractors in this NAICS
- Uchicago Argonne, LLC$1.26B
- Lockheed Martin Corp$341.2M
- Smithsonian Institution$65.5M
Hunting recompetes here?
10+ contracts in this NAICS end within 18 months. The largest are listed below — incumbents and end dates included.
All expiring 541710 contracts →Open opportunities
No opportunities match. Try broadening your filters.
Largest contracts ending within 18 months
| PIID | Contractor | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|---|
| DEAC0576RL01830 ↗ | Battelle Memorial Institute | BATTELLE MEMORIAL INSTITUTE/PACIFIC NORTHWEST LABORATORY MANAGEMENT AND OPERATING CONTRACT: THIS BILATERAL MOD UPDATES PART III, SECTION J, APPENDIX E TO INCORPORATE THE FY 2025 BATTELLE PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FOR THE MANA | Department Of Energy | 541710 | $1.65B | Jan 4, 2003 | Sep 30, 2027 |
| DEAC0206CH11357 ↗ | Uchicago Argonne, LLC | PERFORMANCE-BASED CONTRACT FOR MANAGEMENT AND OPERATION OF ARGONNE NATIONAL LABORATORY MODIFICATION. | Department Of Energy | 541710 | $1.26B | Jul 31, 2006 | Sep 30, 2026 |
| DEAC0276SF00515 ↗ | The Leland Stanford Junior University | MANAGEMENT AND OPERATION AT SLAC NATIONAL ACCELERATOR LABORATORY TAS:: 89 0222 | Department Of Energy | 541710 | $712.0M | Jan 25, 1981 | Sep 30, 2027 |
| NNJ06TA25C ↗ | Lockheed Martin Corp | ORION CREW EXPLORATION VEHICLE CONTRACT | National Aeronautics And Space Administration | 541710 | $341.2M | Sep 6, 2006 | Sep 30, 2026 |
| NAS503127 ↗ | Association Of Universities For Research In Astronomy, INC. | THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADE STUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS. | National Aeronautics And Space Administration | 541710 | $153.2M | Oct 1, 2003 | Jun 25, 2027 |
| DEAC0207CH11358 ↗ | Iowa State University Of Science And Technology | MANAGEMENT & OPERATING (M&O) CONTRACT NO. DE-AC02-07CH11358 FOR THE MANAGEMENT AND OPERATION OF THE AAMES NATIONAL LABORATORY. TOTAL NON-APPROPRIATED FUNDS: $58,252.43 SIGMA-ALDRICH CO. PROJECT 451300.003 AGREEMENT NO. AL-SPP | Department Of Energy | 541710 | $117.5M | Dec 4, 2006 | Dec 31, 2026 |
| MSFC0200308DNAS803060 ↗ | Smithsonian Institution | FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXO | National Aeronautics And Space Administration | 541710 | $64.0M | Aug 31, 2003 | Sep 30, 2027 |
| GSFC0200208DNAS502105 ↗ | University Of Arizona | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM | National Aeronautics And Space Administration | 541710 | $26.5M | Jul 17, 2002 | Sep 30, 2027 |
| NNM06AA75C ↗ | Southwest Research Institute | THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM. | National Aeronautics And Space Administration | 541710 | $12.4M | Feb 23, 2006 | Aug 31, 2026 |
| W31P4Q21FC003 ↗ | Mta INC | ENGINEERING SUPPORT FOR THE AVIATION AND MISSILE CENTER (AVMC), SYSTEMS READINESS DIRECTORATE (SRD) RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SYSTEM ASSESSMENT (SA) | Department Of The Army | 541710 | $9.2M | Dec 17, 2020 | Aug 27, 2026 |