S3 Contracting LLC
UEI Q7DUFTPAWHN2 · VA · SAM.gov record ↗
$4.3M
FY2025 obligations
26
Contract awards
Aug 28, 2020
First action
Sep 29, 2025
Latest action
Obligations by agency
- Department Of Defense$3.8M
- General Services Administration$469K
Obligations by NAICS
Monthly obligations
Nov 24
Jan 25
Feb 25
Mar 25
Apr 25
Jun 25
Jul 25
Aug 25
Sep 25
Contracts ending within 18 months (recompete watch)
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| W91QV125CA038 ↗ | FT MCNAIR QTRS 1, 3, 11 SANITARY SEWER RESTORATION REPAIR THROUGH STAND ALONE CONTRACT WITH 8A CONTRACTOR THROUGH MICC BELVOIR: WR# EM-23301-5J, | Department Of The Army | 237110 | $157K | Aug 1, 2025 | Sep 23, 2026 |
| W91QV125FA154 ↗ | THE PURPOSE OF THIS WORK IS TO ELIMINATE WATER PONDING AND INFILTRATION ON B400 ROOF. THIS PROJECT INVOLVES RE-GRADING A SECTION OF THE ROOF AROUND AN EXISTING HVAC DUCT ONLY. ANOTHER CONTRACTOR WILL PERMANENTLY RAISE THE EXISTING HVAC DUCT. | Department Of The Army | 238160 | $22K | Sep 26, 2025 | Sep 25, 2026 |
| W91QV125FA140 ↗ | THIS PROJECT INVOLVES REPAIRING ROOF LEAKS ON BUILDING 205 BY REPLACEMENT TO PREVENT FURTHER WATER DAMAGE AND EXTEND THE LIFESPAN OF THE ROOFING SYSTEMS. IT WILL HELP PREVENT FURTHER DAMAGE AND MAINTAIN THEINTEGRITY OF THE STRUCTURES. | Department Of The Army | 238160 | $835K | Sep 29, 2025 | Sep 28, 2026 |
Largest awards
| PIID | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|
| HQ003423C0074 ↗ | DEFENSE ACQUISITION UNIVERSITY HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM MAINTENANCE | Washington Headquarters Services | 238220 | $1.2M | Jun 29, 2023 | Jun 28, 2026 |
| W91QV125FA140 ↗ | THIS PROJECT INVOLVES REPAIRING ROOF LEAKS ON BUILDING 205 BY REPLACEMENT TO PREVENT FURTHER WATER DAMAGE AND EXTEND THE LIFESPAN OF THE ROOFING SYSTEMS. IT WILL HELP PREVENT FURTHER DAMAGE AND MAINTAIN THEINTEGRITY OF THE STRUCTURES. | Department Of The Army | 238160 | $835K | Sep 29, 2025 | Sep 28, 2026 |
| W91QV125FA086 ↗ | THE FLAT ROOF OF B35 AT MCNAIR HAS MULTIPLE LEAKS, AND REQUIRES A COMPLETE REMOVAL AND REPLACEMENT OF APPROX 25100 SQF OF THE FLAT MODIFIED BITUMEN ROOF SYSTEM, REINFORCEMENT OF STRUCTURAL OPENINGS AND INSTALL OF 4 INCHES OF TAPERED ISO INSULATION. | Department Of The Army | 238160 | $421K | Jul 8, 2025 | Feb 21, 2026 |
| 47PM1025F0015 ↗ | SNOW AND ICE REMOVAL SERVICES FOR WINTER FY25 - WH COMPLEX | Public Buildings Service | 561730 | $360K | Nov 7, 2024 | Apr 30, 2025 |
| W91QV125FA033 ↗ | WATER DAMAGE REPAIR AND CLEANUP INTERIOR HOT WATER LINE FAILED CAUSING DAMAGES TO DROPCEILING, CARPET DAMAGE, AND FLOODING THE WESTERN HALF OF GROUND LEVEL FLOOR OF THE BUILDING FROM ONE TO TWO INCHES OF STANDING WATER. | Department Of The Army | 238160 | $325K | Jul 16, 2025 | Aug 18, 2025 |
| W91QV125FA087 ↗ | THE CONTRACTOR WILL BE RESPONSIBLE FOR COMPLETING ALL NECESSARY REPAIRS, ENSURING THAT EACH ROOF IS WATERTIGHT AND CAPABLE OF WITHSTANDING FUTURE WEATHER CONDITIONS | Department Of The Army | 238160 | $189K | Jul 8, 2025 | Oct 31, 2025 |
| W91QV125FA018 ↗ | MYER BLDG 407 SPATES HALL, ROOF, SKYLIGHT, ROOF INLET, AND DRAIN LINE REPAIR, CLEARING AND FLUSHING: WR# S8-16401-4J, SECTIONAL ROOF REPAIR, SKYLIGHT REPLACEMENT, WITH ROOF INLET CLEARING AND DRAIN LINE FLUSHING REPAIRS. | Department Of The Army | 238160 | $185K | Sep 25, 2025 | Sep 25, 2025 |
| W91QV125FA138 ↗ | BUILDING 31 HENDERSON HALL IS THE VINEYARD STORE THAT IS LOCATED AT JBMHH WEST OF MCX. BUILDING 31 ROOF IS DETERIORATING OVER TIME CAUSING NUMEROUS LEAKS IN DIFFERENT LOCATIONS WHICH CAUSE ISSUES WITHWATER INTRUSION AND WATER DAMAGE TO THE PROPERTY. | Department Of The Army | 238160 | $157K | Sep 15, 2025 | Dec 15, 2025 |
| W91QV125CA038 ↗ | FT MCNAIR QTRS 1, 3, 11 SANITARY SEWER RESTORATION REPAIR THROUGH STAND ALONE CONTRACT WITH 8A CONTRACTOR THROUGH MICC BELVOIR: WR# EM-23301-5J, | Department Of The Army | 237110 | $157K | Aug 1, 2025 | Sep 23, 2026 |
| W91QV125FA052 ↗ | THE CONTRACTOR SHALL PROVIDE PERSONAL, MATERIAL, EQUIPMENT, AND SUPERVISION TO COMPLETE THE TECHNICAL REQUIREMENT IN THIS STATEMENT OF WORK. | Department Of The Army | 238160 | $104K | Jun 23, 2025 | Sep 23, 2025 |
| W91QV125F0147 ↗ | FT MCNAIR BLDGS B28, B35, AND B43 FLAT ROOF REPAIR4017AA - COPPER 16 OZ | Department Of The Army | 238160 | $84K | Feb 18, 2025 | Jun 27, 2025 |
| W91QV125FA079 ↗ | THIS PROJECT INVOLVES REPAIRING ROOF LEAKS ON BUILDING 412 BY REPLACEMENT TO PREVENT FURTHER WATER DAMAGE AND EXTEND THE LIFESPAN OF THE ROOFING SYSTEMS. | Department Of The Army | 238160 | $36K | Jul 1, 2025 | Oct 31, 2025 |
| 47PM1025C0005 ↗ | STAND ALONE CONTRACT 47PM1025C0005- EEOB AND EAST WING CHANDELIER REPAIRS THIS IS A CONTRACT FOR BOTH THE REPAIRING AND WIRING OF CHANDELIERS AT EISENHOWER EXECUTIVE OFFICE BUILDING AND EAST WING, 1650 PENNSYLVANIA AVE WASHINGTON DC, 20503. | Public Buildings Service | 236220 | $30K | Feb 27, 2025 | Feb 27, 2026 |
| W91QV125CA022 ↗ | JBMHH B61 SHOWER TILE REPLACEMENT | Department Of The Army | 238340 | $30K | Jun 17, 2025 | Sep 15, 2025 |
| 47PM1025C0006 ↗ | STAND ALONE CONTRACT-47PM1025C0006 EMERGENCY NTP CHANDELIERS REPAIR FOR EEOB FOR THE ADJUSTMENT OF CEILING FIXTURES AND PENDANT LIGHTS AT THE EISENHOWER EXECUTIVE OFFICE BUILDING AT 1650 17TH ST. NW WASHINGTON, DC 20500 | Public Buildings Service | 236220 | $25K | Mar 10, 2025 | Oct 14, 2025 |
| 47PM1125C0010 ↗ | EEOB CHANDELIER REPAIRS IN ROOMS 228 AND 236 | Public Buildings Service | 236220 | $24K | Jul 14, 2025 | Mar 11, 2026 |
| 47PM1025C0013 ↗ | THE PURPOSE OF THIS PROCUREMENT IS FOR THE WH COMPLEX CHANDELIER INSPECTION | Public Buildings Service | 541350 | $23K | Sep 10, 2025 | Mar 10, 2026 |
| W91QV125FA154 ↗ | THE PURPOSE OF THIS WORK IS TO ELIMINATE WATER PONDING AND INFILTRATION ON B400 ROOF. THIS PROJECT INVOLVES RE-GRADING A SECTION OF THE ROOF AROUND AN EXISTING HVAC DUCT ONLY. ANOTHER CONTRACTOR WILL PERMANENTLY RAISE THE EXISTING HVAC DUCT. | Department Of The Army | 238160 | $22K | Sep 26, 2025 | Sep 25, 2026 |
| W91QV125FA100 ↗ | REMOVE AND DISPOSE OF 10SQ OF EXISTING SLATE ROOFING. REMOVE ALL FLASHING.SUPPLY AND INSTALL ICE AND WATER SHIELD TO ALL EXPOSED ROOF DECKING. INSTALL NEW FLASHING.INSTALL NEW SLATE TILE ROOFING. FABRICATE AND INSTALL COUNTER FLASHING. | Department Of The Army | 238160 | $18K | Jul 14, 2025 | Oct 14, 2025 |
| W91QV125FA074 ↗ | THIS PROJECT INVOLVES REPAIRING ROOF LEAKS ON FOUR BUILDINGS (MYER B205, HH B29, HH B26, MCNAIR B69) TO PREVENT FURTHER WATER DAMAGE AND EXTEND THE LIFESPAN OF THE ROOFING SYSTEMS. | Department Of The Army | 238160 | $16K | Jun 24, 2025 | Aug 25, 2025 |
| W91QV125FA077 ↗ | MCNAIR BUILDING 62 MARSHAL HALL LOCATED AT 5TH AVE HAS RECENT WATER LEAK BELIEVED TO BE FROM DETERIORATED CAULKING ON SKYLIGHT WINDOW WHICH CASE A WATER LEAK. | Department Of The Army | 238160 | $10K | Jun 25, 2025 | Dec 30, 2025 |
| 47PM1025C0017 ↗ | THE CONTRACTOR WILL PROVIDE LABOR AND PARTS NEEDED TO SERVICE MULTIPLE DESKS AT 1600 PENNSYLVANIA AV NW, WASHINGTON DC, 20502. | Public Buildings Service | 236220 | $6K | Sep 23, 2025 | Oct 7, 2025 |
| 47PM1025D0002 ↗ | SNOW REMOVAL SERVICES IS FOR THE 15 BUILDINGS, SIDEWALKS, STREETS, RAMPS AND PARKING LOCATED WITHIN THE WHITE HOUSE COMPLEX AS WELL AS SIDEWALKS AROUND THE PERIMETER OF THE COMPLEX ALONG 17TH AND H STREETS, JACKSON PLACE, AND F ST | Public Buildings Service | 561730 | $2K | Nov 1, 2025 | — |
| 47PM1023C0014 ↗ | THE PURPOSE OF THIS MODIFICATION IS TO ADD IMPLEMENTATION OF CDS AND DRONES CLAUSE. | Public Buildings Service | 238150 | $0 | Aug 9, 2023 | Oct 9, 2023 |
| W9124J20D0016 ↗ | EXTEND PERIOD4 IAW FAR 52.217-8 THROUGH MARCH 15, 2026 | Department Of The Army | 238160 | $0 | Aug 28, 2020 | — |