FedQuery

The Regents Of The University Of Colorado

UEI SPVKK1RC2MZ3 · CO · SAM.gov record ↗

$119.8M
FY2025 obligations
87
Contract awards
Oct 14, 2002
First action
Jun 29, 2026
Latest action

Monthly obligations

Oct 24
Nov 24
Dec 24
Jan 25
Feb 25
Mar 25
Apr 25
May 25
Jun 25
Jul 25
Aug 25
Sep 25
Nov 25
Dec 25
Jan 26
Feb 26
Mar 26
Apr 26
May 26
Jun 26

Contracts ending within 18 months (recompete watch)

PIIDDescriptionAgencyNAICSObligatedStartEnd
140D0421P0129RECRUITING SERVICES - COLORADO UNIVERSITY BOULDERDepartmental Offices611310$51KJul 31, 2021Jul 30, 2026
75N94020F00001TO ASSIST IN THE DEVELOPMENT OF NEW CONTRACEPTIVE PRODUCTS BY PROVIDING SERVICES RELATED TO PROTOCOL REVIEW, PROTOCOL DEVELOPMENT AND ACTIVITIES ASSOCIATED WITH PAST, PRESENT AND FUTURE CCTN ACTIVITIES. UNIVERSITY OF COLORADO-75N94020D00019/75N940National Institutes Of Health541714$-4KJul 31, 2020Jul 30, 2026
1333MJ25P0024SAMPLING SERVICES INCLUDING COLLECTION OF RESEARCH QUALITY ATMOSPHERIC AIR SAMPLES AND IN-SITU SURFACE OZONE MEASUREMENTS AS WELL AS CALIBRATION REFERENCE AIR CYLINDER PREPARATION AND FILLING FROM THE NIWOT RIDGE SITE NORTHWEST OF BOULDER, COLORADO.National Oceanic And Atmospheric Administration561990$60KJul 30, 2025Jul 30, 2026
1305M325F0131ISOTOPE ANALYSIS TASK ORDER.National Oceanic And Atmospheric Administration541380$1.1MAug 5, 2025Aug 4, 2026
1305M325F0167ISOTOPE ANALYSIS TASK ORDERNational Oceanic And Atmospheric Administration541380$500KAug 27, 2025Aug 26, 2026
80GSFC24CA049DYNAMICAL NEUTRAL ATMOSPHERE-IONOSPHERE COUPLING (DYNAMIC) PHASE A - SOW UPDATE TO CHANGE CSR DELIVERY DATENational Aeronautics And Space Administration541715$0Aug 28, 2024Aug 30, 2026
140R4025F0076MRG RIVERWARE SUPPORT AND DEVELOPMENTBureau Of Reclamation541511$125KAug 31, 2025Aug 30, 2026
1305M323CNRMJ0046THE PURPOSE OF MODIFICATION P25001 IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FOR THE SUBJECT CONTRACT FROM 31 AUGUST 2025 TO 31 AUGUST 2026 AND REVISE CONTRACT CLAUSES.National Oceanic And Atmospheric Administration334519$0Aug 31, 2023Aug 30, 2026
80GSFC24CA050DYNAMICAL NEUTRAL ATMOSPHERE-IONOSPHERE COUPLING-X (DAPHNE) PHASE ANational Aeronautics And Space Administration541715$0Aug 28, 2024Aug 30, 2026
140R8125F0192RIVERWARE SOFTWARE SUPPORTBureau Of Reclamation541511$222KSep 12, 2025Sep 13, 2026

Largest awards

PIIDDescriptionAgencyNAICSObligatedStartEnd
80LARC20D0006LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE,LONG WAVE, AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE.National Aeronautics And Space Administration541715$25.7MJul 5, 2020
80GSFC23CA035REMOVAL OF CLAUSES/DRDS IAW EO 14035 --SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS)National Aeronautics And Space Administration541715$18.3MMar 31, 2023Mar 30, 2027
NNH10CC04CNASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT.National Aeronautics And Space Administration541712$16.7MDec 22, 2009Jan 30, 2029
80GSFC19C0069PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.National Aeronautics And Space Administration336419$7.7MAug 5, 2019Dec 11, 2026
80MSFC26C0014DUSTER WILL MEASURE DUST, PLASMA, MICROMETEOROID IMPACTS, AND LANDER EJECTA AT THE LUNAR SOUTH POLE TO ASSESS HAZARDS FOR ARTEMIS MISSIONS.National Aeronautics And Space Administration541715$7.2MApr 5, 2026Jun 29, 2029
80GSFC23CA062PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN IN OPERATION ON THE INTERNATIONAL SPACE STATION (ISS).National Aeronautics And Space Administration517810$6.4MJun 19, 2023Jun 18, 2027
80GSFC18C0061GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.National Aeronautics And Space Administration541720$6.1MFeb 28, 2018Apr 29, 2027
80LARC25F7015ADDITIONAL SUPPORT AT THE PAYLOAD SYSTEM LEVEL ASSEMBLY, INTEGRATION, ALIGNMENT, TEST, CHARACTERIZATION, CALIBRATION, VERIFICATION, AND ENVIRONMENTAL QUALIFICATION FOR DELIVERY OF THE FULLY QUALIFIED LIBERA FLIGHT INSTRUMENT.National Aeronautics And Space Administration541715$5.0MDec 19, 2024Feb 27, 2026
80LARC26F7016LIBERA SPACECRAFT INTEGRATION AND TEST (I&T) SUPPORT DURING INTEGRATION OF LIBERA TO THE HOST JOINT POLAR SATELLITE SYSTEM-4 (JPSS-4) SPACECRAFT. EXTENSION OF LAUNCH READINESS DATE FROM JANUARY 2027 TO SEPTEMBER 2027National Aeronautics And Space Administration541715$4.0MMar 1, 2026Aug 31, 2027
80LARC18C0001CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONSNational Aeronautics And Space Administration541715$2.9MJul 17, 2018
GSFC0200210DNAS502140EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY (SDO)National Aeronautics And Space Administration541710$2.5MOct 14, 2002Sep 29, 2027
80GSFC23CA004PHASE A-B BRIDGE AETHER INSTRUMENT FOR THE GDC SPACECRAFTNational Aeronautics And Space Administration336419$1.9MNov 7, 2022Sep 29, 2025
80JSC026FA020IN SPACE PRODUCTION OF IPSC-DERIVED CAR-T CELLS FOR CLINICAL APPLICATIONSNational Aeronautics And Space Administration541715$1.5MDec 9, 2025Dec 14, 2028
1305M325F0131ISOTOPE ANALYSIS TASK ORDER.National Oceanic And Atmospheric Administration541380$1.1MAug 5, 2025Aug 4, 2026
80LARC25F7026PROVIDE AN INTERNAL ABSOLUTE TIME SEQUENCE (ATS) SEPARATE FROM THE JOINT POLAR SATELLITE SYSTEM (JPSS) SATELLITE OPERATION COMMAND TABLE AND DELIVER A BINARY FILE IN THE LIBERA ABSOLUTE TIME SEQUENCE (ATS) FORMAT.National Aeronautics And Space Administration541715$1.0MMar 6, 2025Dec 30, 2028
80JSC026FA062IN SPACE EXPANSION OF HEMATOPOIETIC STEM CELLS FOR CLINICAL APPLICATION, PHASE 1BNational Aeronautics And Space Administration541715$1.0MFeb 11, 2026Jan 30, 2027
1305M325F0017ISOTOPE ANALYSIS TASK ORDER.National Oceanic And Atmospheric Administration541380$723KFeb 18, 2025Feb 17, 2026
11316025P0006ONDBLUEPRINTS FOR HEALTHY YOUTH DEVELOPMENT REPOSITORYExecutive Office Of The President541690$600KSep 18, 2025Sep 17, 2026
80LARC25F7033LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) SUPPORT FOR SPACECRAFT INTEGRATION AND TEST (I&T) PLANNING VERIFICATION WITH JOINT POLAR SATELLITE SYSTEM (JPSS).National Aeronautics And Space Administration541715$600KMay 14, 2025Feb 27, 2026
1305M226C0012RADAR NEXT-BAA FOR UNIVERSITY OF COLORADO "THE IMPACTS OF ASSIMILATING OBSERVATIONS FROM VARIOUS WEATHER RADAR NETWORK CONFIGURATIONS ON A REGIONAL FORECAST SYSTEM"National Oceanic And Atmospheric Administration541715$599KFeb 28, 2026May 30, 2027
75N94025F00001NICHD: SERVICE: CCTN LB PHASE 2B CLINICAL TRIAL: NON-SEVERABLENational Institutes Of Health541714$585KJul 31, 2025Dec 30, 2027
FA239425CB020HYLEOS -- HYPERSONICS AND LOW EARTH ORBIT SIMULATORDepartment Of The Air Force541715$520KAug 5, 2025Apr 30, 2028
1305M325F0167ISOTOPE ANALYSIS TASK ORDERNational Oceanic And Atmospheric Administration541380$500KAug 27, 2025Aug 26, 2026
80JSC022F0146PRODUCTION OF LARGE POPULATIONS OF HEMATOPOIETIC STEM CELLS (HSCS) IN MICROGRAVITY TO TREAT SERIOUS MEDICAL CONDITIONS INCLUDING BLOOD CANCERS (LEUKEMIAS, LYMPHOMAS, MULTIPLE MYELOMA), FATAL BLOOD DISORDERS, AND SEVERE IMMUNE DISEASES.National Aeronautics And Space Administration541990$468KJun 5, 2022Feb 19, 2027
FA239425CB003IN-SITU NON-DESTRUCTIVE INSPECTION USING HETEROGENOUS COLLABORATIVE ROBOTSDepartment Of The Air Force541715$450KMar 13, 2025Mar 13, 2028