FedQuery
ActiveCombined Synopsis/SolicitationTotal Small Business Set-Aside (FAR 19.5)

Air Compressors and Maintenance Plan

DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA9401 377 MSG PK

Solicitation #
FA9401-26-Q-0025
Posted
Jul 8, 2026
Response deadline
Aug 4, 2026(20d)
Archive date
Aug 19, 2026
NAICS
PSC
4310
Place of performance
Kirtland AFB, NM, 87117
Contact
Karen Camacho · [email protected]

Description

**This Solicitation has been amended please see attachment FA940126Q0025 - AMENDED for complete information.** 1. Response deadline date has changed from Monday, 13 July 2026 to Tuesday, 04 August 2026 at 1400 hours (MDT) 2. We have added a site visit, which is being held on 16 July 2026 at 1300 hours (MDT). *See PWS for complete details* This project will consist of the procurement, removal, disposal, installation, commissioning, and maintenance of two (2) Ingersoll Rand RS37i Air Compressors, one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator, and two (2) Ingersoll Rand Xe-70M controllers. Equivalent models are accepted; however, bids on equivalent models will need to include a brochure of all the technical specifications for review. Equivalent models will need to either have an integrated desiccant dryer or separate desiccant dryer that can handle the volume of two air compressors. The Contractor will be responsible for the complete installation of two (2) Ingersoll Rand RS37i Air Compressors and one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator. The Contractor shall procure and provide a “turnkey” solution in accordance with the manufacturer’s installation requirements and standard commercial best practices for the following equipment: Manufacture Model # Description Quantity Ingersoll Rand RS30-37i/RS30I TAS Fixed Speed Rotary Compressor w/ Dryer 2 Ingersoll Rand PSG-30 Polysep PSG-30 Oil Water Separator 1 Equivalent models must meet the following specifications: Description Required Specifications Quantity Air Compressor 2 • 120 PSI each • 170 CPM each • Needs to have integrated air dryer • Must be air-cooled Oil Water Separator 1 • 390 CPM • 12-gal absorption module volume • 32-120 temperature operating range In addition, the government requires a preventive (scheduled) and corrective (troubleshooting, repairs, and replacements) maintenance contract for all existing shop air compressor systems (See Appendixes in PWS for all currently used equipment), for the base year and four option years. The Contractor shall provide all management, labor, material, parts, equipment, transportation, certifications, and tools necessary to maintain, service, and calibrate the shop air compressors, air dryers and associated ancillary equipment.

View on SAM.gov (attachments & response) ↗

More active opportunities in NAICS 333912

TitleAgencyTypeNAICSPostedDeadline
4310--Replacement Medical Air Equipment Grand Junction, COVETERANS AFFAIRS, DEPARTMENT OFCombined Synopsis/Solicitation333912Jul 15, 2026Jul 22, 2026(7d)
43--FEED,AIR COMPRESSORDEFENSE LOGISTICS AGENCYCombined Synopsis/Solicitation333912Jul 15, 2026Jul 27, 2026(11d)
Quincy Brand Name or Equal Oil-Free Rotary Scroll Dental Air CompressorVETERANS AFFAIRS, DEPARTMENT OFPresolicitation333912Jul 15, 2026Jul 24, 2026(8d)
43--FEED,AIR COMPRESSORDEFENSE LOGISTICS AGENCYAward Notice333912Jul 15, 2026
4320-012698849, seal assembly, shaftDEFENSE LOGISTICS AGENCYPresolicitation333912Jul 15, 2026Aug 28, 2026(44d)
Air Compressors and Maintenance Plan · FedQuery