FedQuery

Expiring contracts

Contracts whose period of performance ends soon. When these expire, the work usually gets recompeted — this is your pipeline of future opportunities.

Filters

Period of performance ends in (months)
0mo18mo
Contract value (obligated)
$1K$100.00B+
Agency
Set-aside
Place of performance
NAICS (prefix ok)

18 contracts ending in the next 0–18 months (0.29 seconds)

PIIDContractorDescriptionAgencyNAICSObligatedStartEnd
W31P4Q21FC003Mta INCENGINEERING SUPPORT FOR THE AVIATION AND MISSILE CENTER (AVMC), SYSTEMS READINESS DIRECTORATE (SRD) RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SYSTEM ASSESSMENT (SA)Department Of The Army541710$12.1MDec 16, 2020Aug 26, 2026
NNM06AA75CSouthwest Research InstituteTHE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM.National Aeronautics And Space Administration541710$12.4MFeb 22, 2006Aug 30, 2026
2033H625F00094The Mitre CorporationNEW TASK ORDER AGAINST TREASURY FFRDC CONTRACT (TIRNO99D00005) - MITRE CORP - TREASURY FFM & HHS GRM TECHNICAL SUPPORTBureau Of The Fiscal Service541710$3.2MAug 31, 2025Aug 30, 2026
DEAC0206CH11357Uchicago Argonne, LLCPERFORMANCE-BASED CONTRACT FOR MANAGEMENT AND OPERATION OF ARGONNE NATIONAL LABORATORY MODIFICATION.Department Of Energy541710$2.16BJul 30, 2006Sep 29, 2026
DEAC0207CH11358Iowa State University Of Science And TechnologyMANAGEMENT & OPERATING (M&O) CONTRACT NO. DE-AC02-07CH11358 FOR THE MANAGEMENT AND OPERATION OF THE AAMES NATIONAL LABORATORY. TOTAL NON-APPROPRIATED FUNDS: $58,252.43 SIGMA-ALDRICH CO. PROJECT 451300.003 AGREEMENT NO. AL-SPPDepartment Of Energy541710$146.4MDec 3, 2006Dec 30, 2026
NNM07AA01CLockheed Martin CorporationHINODE (FORMERLY KNOWN AS SOLAR B PHASE E)--FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS. THE HINODE PROGRAM IS A CONTINUATION OF A JOINT "INTERNATIONAL" VENTURE BETWEEN THE UNITED STATES, GREAT BRITAIN AND JAPAN TO ADVANCE OUR UNDERSTANNational Aeronautics And Space Administration541710$4.1MFeb 21, 2007Feb 27, 2027
NNM07AB07CSmithsonian InstitutionTHE HINODE PHASE E MISSION IS A CONTINUATION OF A JOINT "INTERNATIONAL" VENTURE TO ADVANCE OUR UNDERSTANDING OF THE SUN THROUGH OBSERVATION IN EARTH'S ORBIT. THE CONTINUATION OF THIS PHASE IS TITLED, "HINODE," FORMERLY KNOWN AS SOLAR-B X-RAY TELESCONational Aeronautics And Space Administration541710$3.0MNov 30, 2006Feb 27, 2027
GSFC0200005DNAS500147The Leland Stanford Junior UniversityGAMMA RAY LARGE AREA SPACE TELESCOPE (GLAST). THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING NASA REVIEWS&DIRECTED ENGINEERING ANALYSIS, OBSERVATION PLANNING, MISSION SCHEDULING, SATELLITE OPERATIONS, SCIENCE DATA PROCESSING SUPPORT, SPACECRAFT HEALTH/SAFETY/PERFORMANCE ANALYSIS, INSTRUMENT PERFORMANCE SUPPORT ANALYSIS, FLIGHT/GROUND SYSTEM&SOFTWARE, AND ANOMALY RESOLUTION&ANALYSIS.National Aeronautics And Space Administration541710$3.4MMay 2, 2000Feb 28, 2027
NNJ06TA25CLockheed Martin CorpORION CREW EXPLORATION VEHICLE CONTRACTNational Aeronautics And Space Administration541710$514.8MSep 5, 2006Apr 14, 2027
NAS503127Association Of Universities For Research In Astronomy, INC.THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADE STUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.National Aeronautics And Space Administration541710$247.6MSep 30, 2003Jun 24, 2027
GSFC0200004DNAS500136The Pennsylvania State UniversitySWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEMNational Aeronautics And Space Administration541710$4.8MApr 14, 2000Aug 30, 2027
DEAC0576RL01830Battelle Memorial InstituteBATTELLE MEMORIAL INSTITUTE/PACIFIC NORTHWEST LABORATORY MANAGEMENT AND OPERATING CONTRACT: THIS BILATERAL MOD UPDATES PART III, SECTION J, APPENDIX E TO INCORPORATE THE FY 2025 BATTELLE PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FOR THE MANADepartment Of Energy541710$2.71BJan 3, 2003Sep 29, 2027
DEAC0276SF00515The Leland Stanford Junior UniversityMANAGEMENT AND OPERATION AT SLAC NATIONAL ACCELERATOR LABORATORY TAS:: 89 0222Department Of Energy541710$1.34BJan 24, 1981Sep 29, 2027
MSFC0200308DNAS803060Smithsonian InstitutionFOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXONational Aeronautics And Space Administration541710$122.3MAug 30, 2003Sep 29, 2027
GSFC0200208DNAS502105University Of ArizonaSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEMNational Aeronautics And Space Administration541710$26.5MJul 16, 2002Sep 29, 2027
GSFC0200210DNAS502139The Leland Stanford Junior UniversitySOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT.National Aeronautics And Space Administration541710$7.0MOct 14, 2002Sep 29, 2027
NNG04EA00CLockheed Martin CorporationATMOSPHERIC IMAGE ASSEMBLY MISSION OPERATIONS AND DATA ANALYSIS FOR THE NASA SOLAR DYNAMICS OBSERVATORYNational Aeronautics And Space Administration541710$6.6MNov 3, 2003Sep 29, 2027
GSFC0200210DNAS502140The Regents Of The University Of ColoradoEXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY (SDO)National Aeronautics And Space Administration541710$2.5MOct 14, 2002Sep 29, 2027