Expiring contracts
Contracts whose period of performance ends soon. When these expire, the work usually gets recompeted — this is your pipeline of future opportunities.
Filters
Period of performance ends in (months)
0mo18mo
Contract value (obligated)
$1K$100.00B+
Agency
Set-aside
Place of performance
NAICS (prefix ok)
18 contracts ending in the next 0–18 months (0.29 seconds)
| PIID | Contractor | Description | Agency | NAICS | Obligated | Start | End |
|---|---|---|---|---|---|---|---|
| W31P4Q21FC003 ↗ | Mta INC | ENGINEERING SUPPORT FOR THE AVIATION AND MISSILE CENTER (AVMC), SYSTEMS READINESS DIRECTORATE (SRD) RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SYSTEM ASSESSMENT (SA) | Department Of The Army | 541710 | $12.1M | Dec 16, 2020 | Aug 26, 2026 |
| NNM06AA75C ↗ | Southwest Research Institute | THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM. | National Aeronautics And Space Administration | 541710 | $12.4M | Feb 22, 2006 | Aug 30, 2026 |
| 2033H625F00094 ↗ | The Mitre Corporation | NEW TASK ORDER AGAINST TREASURY FFRDC CONTRACT (TIRNO99D00005) - MITRE CORP - TREASURY FFM & HHS GRM TECHNICAL SUPPORT | Bureau Of The Fiscal Service | 541710 | $3.2M | Aug 31, 2025 | Aug 30, 2026 |
| DEAC0206CH11357 ↗ | Uchicago Argonne, LLC | PERFORMANCE-BASED CONTRACT FOR MANAGEMENT AND OPERATION OF ARGONNE NATIONAL LABORATORY MODIFICATION. | Department Of Energy | 541710 | $2.16B | Jul 30, 2006 | Sep 29, 2026 |
| DEAC0207CH11358 ↗ | Iowa State University Of Science And Technology | MANAGEMENT & OPERATING (M&O) CONTRACT NO. DE-AC02-07CH11358 FOR THE MANAGEMENT AND OPERATION OF THE AAMES NATIONAL LABORATORY. TOTAL NON-APPROPRIATED FUNDS: $58,252.43 SIGMA-ALDRICH CO. PROJECT 451300.003 AGREEMENT NO. AL-SPP | Department Of Energy | 541710 | $146.4M | Dec 3, 2006 | Dec 30, 2026 |
| NNM07AA01C ↗ | Lockheed Martin Corporation | HINODE (FORMERLY KNOWN AS SOLAR B PHASE E)--FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS. THE HINODE PROGRAM IS A CONTINUATION OF A JOINT "INTERNATIONAL" VENTURE BETWEEN THE UNITED STATES, GREAT BRITAIN AND JAPAN TO ADVANCE OUR UNDERSTAN | National Aeronautics And Space Administration | 541710 | $4.1M | Feb 21, 2007 | Feb 27, 2027 |
| NNM07AB07C ↗ | Smithsonian Institution | THE HINODE PHASE E MISSION IS A CONTINUATION OF A JOINT "INTERNATIONAL" VENTURE TO ADVANCE OUR UNDERSTANDING OF THE SUN THROUGH OBSERVATION IN EARTH'S ORBIT. THE CONTINUATION OF THIS PHASE IS TITLED, "HINODE," FORMERLY KNOWN AS SOLAR-B X-RAY TELESCO | National Aeronautics And Space Administration | 541710 | $3.0M | Nov 30, 2006 | Feb 27, 2027 |
| GSFC0200005DNAS500147 ↗ | The Leland Stanford Junior University | GAMMA RAY LARGE AREA SPACE TELESCOPE (GLAST). THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING NASA REVIEWS&DIRECTED ENGINEERING ANALYSIS, OBSERVATION PLANNING, MISSION SCHEDULING, SATELLITE OPERATIONS, SCIENCE DATA PROCESSING SUPPORT, SPACECRAFT HEALTH/SAFETY/PERFORMANCE ANALYSIS, INSTRUMENT PERFORMANCE SUPPORT ANALYSIS, FLIGHT/GROUND SYSTEM&SOFTWARE, AND ANOMALY RESOLUTION&ANALYSIS. | National Aeronautics And Space Administration | 541710 | $3.4M | May 2, 2000 | Feb 28, 2027 |
| NNJ06TA25C ↗ | Lockheed Martin Corp | ORION CREW EXPLORATION VEHICLE CONTRACT | National Aeronautics And Space Administration | 541710 | $514.8M | Sep 5, 2006 | Apr 14, 2027 |
| NAS503127 ↗ | Association Of Universities For Research In Astronomy, INC. | THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADE STUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS. | National Aeronautics And Space Administration | 541710 | $247.6M | Sep 30, 2003 | Jun 24, 2027 |
| GSFC0200004DNAS500136 ↗ | The Pennsylvania State University | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM | National Aeronautics And Space Administration | 541710 | $4.8M | Apr 14, 2000 | Aug 30, 2027 |
| DEAC0576RL01830 ↗ | Battelle Memorial Institute | BATTELLE MEMORIAL INSTITUTE/PACIFIC NORTHWEST LABORATORY MANAGEMENT AND OPERATING CONTRACT: THIS BILATERAL MOD UPDATES PART III, SECTION J, APPENDIX E TO INCORPORATE THE FY 2025 BATTELLE PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FOR THE MANA | Department Of Energy | 541710 | $2.71B | Jan 3, 2003 | Sep 29, 2027 |
| DEAC0276SF00515 ↗ | The Leland Stanford Junior University | MANAGEMENT AND OPERATION AT SLAC NATIONAL ACCELERATOR LABORATORY TAS:: 89 0222 | Department Of Energy | 541710 | $1.34B | Jan 24, 1981 | Sep 29, 2027 |
| MSFC0200308DNAS803060 ↗ | Smithsonian Institution | FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXO | National Aeronautics And Space Administration | 541710 | $122.3M | Aug 30, 2003 | Sep 29, 2027 |
| GSFC0200208DNAS502105 ↗ | University Of Arizona | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM | National Aeronautics And Space Administration | 541710 | $26.5M | Jul 16, 2002 | Sep 29, 2027 |
| GSFC0200210DNAS502139 ↗ | The Leland Stanford Junior University | SOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT. | National Aeronautics And Space Administration | 541710 | $7.0M | Oct 14, 2002 | Sep 29, 2027 |
| NNG04EA00C ↗ | Lockheed Martin Corporation | ATMOSPHERIC IMAGE ASSEMBLY MISSION OPERATIONS AND DATA ANALYSIS FOR THE NASA SOLAR DYNAMICS OBSERVATORY | National Aeronautics And Space Administration | 541710 | $6.6M | Nov 3, 2003 | Sep 29, 2027 |
| GSFC0200210DNAS502140 ↗ | The Regents Of The University Of Colorado | EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY (SDO) | National Aeronautics And Space Administration | 541710 | $2.5M | Oct 14, 2002 | Sep 29, 2027 |